Baotou–Yinchuan high-speed railway 包银高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Termini | |
Service | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 420.2 km (261 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 250 km/h (155 mph) |
The Baotou–Yinchuan high-speed railway is a high-speed railway in China. It will be 420.2 kilometres (261.1 mi) long and has a design speed of 250 kilometres per hour (160 mph). A branch from Yinchuan to Alxa Left Banner will be 111.1 kilometres (69.0 mi) long and has a design speed of 200 kilometres per hour (120 mph).
History
On 16 August 2018, construction began on the section from Yinchuan to Huinong South. On 17 May 2022, construction of the remaining section between Huinong South and Yinchuan began.
On 17 July 2024, non-revenue service trains started running on the section between Yinchuan and Huinong South.
Route
The railway roughly follows the Baotou–Lanzhou railway.
Stations
- Baotou
- Baiyanhua West
- Urat Front Banner West
- Wuyuan East
- Linhe West
- Dengkou West
- Jiangui East
- Wuhai Haibowan
- Wuhai South
- Huinong South
- Shuizuishan
- Shahu
- Yinchuan
Bayanhaote branch:
See also
References
- "包银高铁最新进展!将新建10个高铁站". hhht.news.163.com. 2020-09-07. Retrieved 2020-12-30.
- "包银高铁宁夏段正式开工建设_滚动新闻_中国政府网". www.gov.cn. Retrieved 2020-12-30.
- "包银高铁——吹响西北发展冲锋号". 高铁网. 2022-05-26. Retrieved 2022-05-26.
- "包银高铁惠银段首趟动车组列车"上线"-新华网". www.xinhuanet.com. Retrieved 2024-08-09.
This People's Republic of China rail-related article is a stub. You can help Misplaced Pages by expanding it. |