Misplaced Pages

Charnawati Khola Hydroelectric Project

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Dam in Dolakha District
Charnawati Khola Hydroelectric Project
Charnawati Khola Hydroelectric Project is located in NepalCharnawati Khola Hydroelectric ProjectLocation of Charnawati Khola Hydroelectric Project in Nepal
CountryNepal
LocationDolakha District
Coordinates27°39′13″N 86°00′59″E / 27.6535°N 86.0164°E / 27.6535; 86.0164
PurposePower
StatusOperational
Opening date24th Jestha ,2070 BS
Owner(s)Nepal Hydro Developer Limited
Dam and spillways
Type of damGravity
ImpoundsMati River
Commission date2070BS
TypeRun-of-the-river
Hydraulic head199 m (653 ft) (Gross)
Turbines2 Pelton-type
Installed capacity3.52 MW

Charnawati Khola Hydroelectric Project is a run-of-the-river hydroelectric power station with an installed capacity of 3.52 MW. This power station is located in Dolakha District, Nepal. The flow is 2.19 m/s and gross head is 199 m. The annual generation of energy is 20.383 GWh. The electricity is connected to Makaibari (Gaighat) substation of NEA via 11 km long 33kV transmission line.

The plant is operated by Nepal Hydro Developer Limited, a public company developing various hydropower projects in Nepal.

References

  1. Ltd, Hydro Solutions Pvt. "Hydro Solutions Pvt. Ltd". Retrieved 2020-07-30.
  2. "Charanawoti Hydroelectrical Project 3.52 MW". Retrieved 2020-07-30.
  3. "Charnawati Khola Hydroelectric Project". Retrieved 2020-07-30.
  4. Charnawati_press_May19_2013.pdf (PDF), archived from the original (PDF) on 2020-02-15, retrieved 2020-07-30
  5. "Operating Projects :: Hydro (Above 1MW)".


Stub icon

This Nepal-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: