Charnawati Khola Hydroelectric Project | |
---|---|
Location of Charnawati Khola Hydroelectric Project in Nepal | |
Country | Nepal |
Location | Dolakha District |
Coordinates | 27°39′13″N 86°00′59″E / 27.6535°N 86.0164°E / 27.6535; 86.0164 |
Purpose | Power |
Status | Operational |
Opening date | 24th Jestha ,2070 BS |
Owner(s) | Nepal Hydro Developer Limited |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Mati River |
Commission date | 2070BS |
Type | Run-of-the-river |
Hydraulic head | 199 m (653 ft) (Gross) |
Turbines | 2 Pelton-type |
Installed capacity | 3.52 MW |
Charnawati Khola Hydroelectric Project is a run-of-the-river hydroelectric power station with an installed capacity of 3.52 MW. This power station is located in Dolakha District, Nepal. The flow is 2.19 m/s and gross head is 199 m. The annual generation of energy is 20.383 GWh. The electricity is connected to Makaibari (Gaighat) substation of NEA via 11 km long 33kV transmission line.
The plant is operated by Nepal Hydro Developer Limited, a public company developing various hydropower projects in Nepal.
References
- Ltd, Hydro Solutions Pvt. "Hydro Solutions Pvt. Ltd". Retrieved 2020-07-30.
- "Charanawoti Hydroelectrical Project 3.52 MW". Retrieved 2020-07-30.
- "Charnawati Khola Hydroelectric Project". Retrieved 2020-07-30.
- Charnawati_press_May19_2013.pdf (PDF), archived from the original (PDF) on 2020-02-15, retrieved 2020-07-30
- "Operating Projects :: Hydro (Above 1MW)".