The toll road project was initiated in 2006, but the construction of the project was halted and delayed due to land acquisition issue, which again restarted in September 2017 after being halted for approximately eight years. The toll road was previously expected to be operational in 2019, however, the first section was inaugurated in 1 April 2021 along with Cengkareng–Batu Ceper–Kunciran Toll Road. While the second section is currently undergoing land acquisition phase which will be used to connect this toll road with Cinere–Jagorawi Toll Road, this section is expected to be operational in 22 December 2023. On 22 December 2023, the entirety of the toll road has been inaugurated.
Sections
This toll road is divided into two sections:
Section 1 is 6.67 kilometres (4.14 mi) from Serpong to Pamulang
Section 2 is 3.64 kilometres (2.26 mi) from Pamulang to Cinere.
Aditiasari, Dita (16 November 2016). "Tol Cinere-Serpong Mulai Dibangun Awal 2017" [Cinere-Serpong Toll Road Construction to Start in 2017]. finance.detik.com (in Indonesian). Detik.com. Retrieved 7 November 2022.
Yanwardhana, Emir (19 May 2022). "Ini Alasan Tol Serpong-Cinere Tak Kunjung Beroperasi" [These are the reasons why Serpong-Cinere Toll Road is yet to be Operating]. cnbcindonesia.com (in Indonesian). CNBC Indonesia. Retrieved 7 November 2022.