Misplaced Pages

Davisville Yard

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Rail yard of the Toronto Transit Commission

Davisville Yard
North view from the Beltline Trail bridge
Overview
LocaleChaplin Estates, Toronto
Service
SystemToronto subway
Operator(s)Toronto Transit Commission
History
Opened1954
Technical
Track gauge4 ft 10+7⁄8 in (1,495 mm)
ElectrificationThird rail, 600 V DC
Route map

to Finch
Lola Road
Imperial Street
Davisville Avenue
Davisville station
William McBrien Building
 
Beltline Trail
to Union

The Davisville Subway Yard is a rail yard on the Toronto Transit Commission's Yonge subway line. The train maintenance and storage building is referred to as the Davisville Carhouse.

Location

The yard is located adjoining the Davisville station, between Eglinton and St. Clair stations. The yard is next to the TTC headquarters in the William McBrien Building at 1900 Yonge Street.

History

Davisville Yard under construction, c. 1953

Davisville Yard acted as the main maintenance and storage yard for Toronto's Yonge subway, which opened between Union Station and Eglinton Avenue in 1954. The first two subway cars (5000 and 5001) were delivered to the TTC's Hillcrest Complex, but subsequent subway cars were delivered to Davisville yard via the Toronto Belt Line Railway. Before the opening of the subway, there was a temporary interchange track between the Yonge streetcar line and the Davisville Yard on the north side of the Belt Line bridge for the interchange of rail equipment with the streetcar system. In 1953, subway cars 5000 and 5001, after being displayed at the Canadian National Exhibition, were mounted on shop bogies and towed at night over streetcar tracks by a Peter Witt motor to the Davisville Yard via the temporary interchange. (The two subway cars had arrived at the CNE from Hillcrest via the Bathurst streetcar line. At the CNE, the two cars were displayed on their own bogies.)

The Davisville Carhouse could not handle heavy repair work for subway bogies. Thus, until the shops at Greenwood Yard were opened in 1965, bogies needed to be shipped by truck to the Hillcrest Complex on a specially built trailer. According to rail historians John F. Bromley and Jack May, this was the reason that the subway was built to the streetcar gauge of 1495mm, which is the gauge used for shop tracks at Hillcrest.

There used to be an upper yard having 2 parallel stub tracks plus a shorter stub siding all running parallel to the former Belt Line Railway line (today the Kay Gardner Beltline Park). Another track, located on an incline, connected the upper and lower yards; today, a short stub siding on the west side of the yard is all that is left of that connecting track. Various pieces of work equipment were stored in the upper yard.

Davisville was Toronto's sole subway yard until 1966, when Greenwood Yard opened. Subway car deliveries were also shifted to Greenwood at this time. While usage of it began to wane, it remained active even as the larger Wilson Yard opened in 1978. The yard became deactivated after 1993, when repairs were required to a retaining wall to the south of the yard. Even after this work was completed, the yard remained inactive as the TTC had become quite satisfied with the temporary storage and maintenance arrangement during the closure. The yard was temporarily reactivated during the 1995 Russell Hill subway accident, and also during the retirement of older rolling stock (H-1/H-2, M-1). The subway yard was formally reactivated in June 2002, a few months prior to the opening of Line 4 Sheppard.

In November 2018, the TTC completed the extension the carhouse over tracks 3 and 4 on the east side of the building. Track 3 is the wash track and track 4 is utilized for interior cleaning and floor washing of the vehicles. Before the extension, tracks 3 and 4 were long enough for only four-car trains within the carhouse building, and the overhead doors on the north and south end had to remain open to service six-car TR trains. The open doors also exposed equipment to freezing in winter. With the extension, the TTC can use tracks 3 and 4 for the overnight storage of six-car TR trains.

Current operations

A G-series train at Davisville, c. 1969
Trains at Davisville yard, seen from Davisville station c. 2009

Davisville Yard is home to a small portion of the TTC's revenue rolling stock of Toronto Rocket subway trains which operate on Line 1 Yonge-University and Line 4 Sheppard and some of the Commission's work cars. The facility is used to store, service and maintain subway cars. The yard can dispatch 12 trains onto Line 1, and this minimizes the need to deadhead trains from the Wilson Yard. In addition to exterior storage tracks, the yard's carhouse has 8 tracks to perform safety inspections, unscheduled repairs, floor washing and exterior washing. Many Subway Infrastructure sections including Track, Structures, and Signals are also based at the Davisville Yard.

Future

In 2022, the city of Toronto was studying a proposal to deck over the Davisville Yard in order to build a 1-hectare (2.5-acre) park over the yard. The yard, the adjacent subway station, a substation and signal facility would remain in operation during construction. The city owns the Davisville Yard.

References

  1. ^ "Davisville Carhouse – Carhouse Expansion" (PDF). Toronto Transit Commission. November 30, 2016. Archived from the original (PDF) on July 27, 2017. Retrieved December 7, 2016.
  2. "A Cavalcade of Progress, 1921-1954". Toronto Transit Commission. Retrieved November 20, 2016.
  3. Baldwin Collection (1953). "Yonge St. looking n. from G.T.R. Belt Line bridge s. of Merton St". Toronto Public Library. Retrieved September 21, 2016.
  4. John F. Bromley and Jack May (1973). 50 Years of Progressive Transit. Electric Railroaders' Association. pp. 83. ISBN 9781550024487. Retrieved August 31, 2016. Chapter 8 - Postwar Change
  5. John F. Bromley and Jack May (1973). 50 Years of Progressive Transit. Electric Railroaders' Association. pp. 85, 107. ISBN 9781550024487. Retrieved August 31, 2016. Chapter 9 - Subway City; Chapter 11 - The Crosstown Subway
  6. Harvey Naylor (July 8, 1961). "The Davisville Subway Yards". Transit Toronto. Retrieved December 8, 2016. Here, we see an aerial view of the west side of Davisville Yards, looking north, with a number of work cars in view, including a tunnel gauge car and RT-4, the ex-Peter Witt garbage train. Photo by Harvey Naylor, courtesy the John Knight collection.
  7. ^ Bow, James; Lubinski, Robert (December 19, 2015). "The Davisville Subway Yards". Retrieved November 20, 2016.
  8. "Financial Update for the Year Ended December 31, 2018 and Major Projects Update" (PDF). Toronto Transit Commission. April 11, 2019. Archived from the original (PDF) on June 14, 2019. Retrieved April 17, 2019.
  9. Spurr, Ben (May 27, 2022). "Rail Deck Park has stalled, but a similar plan is now being proposed for TTC's Davisville yard". Toronto Star.

External links

43°41′50″N 79°23′51″W / 43.69729°N 79.39753°W / 43.69729; -79.39753

Toronto Transit Commission
Bus

Subway
Streetcars
History
Predecessors
Facilities
Proposed
Miscellaneous
Italics indicate a project under construction
Categories: