Misplaced Pages

Galați–Brăila Expressway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Expressway under construction in Romania
Danube expressway DX6
Drumul expres DX6
Route information
Maintained by Compania Națională de Administrare a Infrastructurii Rutiere
Length0 km (0 mi; 0 ft)11 km planned
Major junctions
FromGalați
ToBrăila
Location
CountryRomania
Highway system

The Danube Expressway or Galați–Brăila Expressway (Romanian: Drumul expres Galați–Brăila) is an expressway under construction in the south-eastern part of Romania, that will probably be labelled as the DEx6. It will link the cities of Galați and Brăila, be 11 kilometres (6.8 mi) long and serve as an alternative to the existing two-lane DN22B (Romanian: Drumul Național 22B) road.

Under construction as of 2021, the expressway is being built by the Romanian company Spedition UMB with scheduled opening in 2024, costing 371 million lei. It is part of the series of major infrastructure projects planned within the proposed Danube metropolitan area, which includes a bridge over the Danube river in Brăila.

See also

References

  1. VIDEO Imagini din dronă: Primele lucrări pe Drumul Expres dintre Brăila și Galați / HARTĂ INTERACTIVĂ Pe unde trece noul drum de mare viteză
  2. Ultima oră! Drumul Expres Brăila – Galați NU are autorizație de construire! Șantierul a fost deschis, fără aprobare, la finalul lunii octombrie!
Main roads in Romania
Motorways
In service
Under construction
Planned
Expressways
In service
Under construction
Main national roads
Other national roads


Stub icon

This Romanian road or road transport-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: