Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
This station opened on June 30, 1924 as part of the initial segment of the Canarsie Line, which was a product of the Dual Contracts, stretching from Sixth Avenue to Montrose Avenue.
This underground station has two tracks and two side platforms. Both platforms have their original mosaic tile band showing various shades of green and blue with peach and yellow borders. "G" tablets on a dark blue background run at regular intervals. The mosaic name tablets read "GRAHAM AVE." in gold serif lettering on a blue background and gold border. There are no columns on either platform.
Exits
Each platform has one same-level fare control area towards the west end (railroad north). Each one has a turnstile bank and two street stairs. The ones on the Manhattan-bound side go up to either northern corners of Graham and Metropolitan Avenues, while the ones on the Canarsie-bound side go up to either southern corners. The Manhattan-bound fare control area has a full-time sales booth, while the booth on the Canarsie-bound one is for informational use only. There are no crossovers or crossunders.
Note: Service variations, station closures, and reroutes are not reflected here. Stations with asterisks have no regular peak, reverse peak, or midday service on that route. See linked articles for more information.
Stations and line segments in italics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets. Struck through passenger track connections are closed or unused in regular service.