Misplaced Pages

GreenGen

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
This article's factual accuracy may be compromised due to out-of-date information. Please help update this article to reflect recent events or newly available information. (February 2019)
The topic of this article may not meet Misplaced Pages's notability guidelines for companies and organizations. Please help to demonstrate the notability of the topic by citing reliable secondary sources that are independent of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be merged, redirected, or deleted.
Find sources: "GreenGen" – news · newspapers · books · scholar · JSTOR (March 2020) (Learn how and when to remove this message)
(Learn how and when to remove this message)
GreenGen
CountryChina
LocationTianjin
StatusUnder construction
Construction began2009
Commission date2012
OwnersChina Huaneng Group
China Datang Group
China Huadian Corporation
China Guodian Corporation
China Power Investment Corporation
Shenhua Group
State Development and Investment Co.
China Coal Group
Peabody Energy
OperatorChina Huaneng Group
Thermal power station
Primary fuelCoal
Combined cycle?Yes
Power generation
Nameplate capacity250 MW
[edit on Wikidata]

GreenGen (Chinese: 绿色煤电; pinyin: lǜsèméidiàn; lit. 'green colour coal electricity') is a project in Tianjin, China that aims to research and develop high-tech low-emissions coal-based power generation plants.

History

Funded by a group of power companies led by SOE China Huaneng Group and the Chinese government's 863 Program, the GreenGen project commenced in 2005. A key technology in the project is the integrated gasification combined cycle (IGCC), which is a coal gasification process that turns coal into a gas before burning it, hence allowing power generation to be more efficient and releasing less carbon and other pollutants.

Project

The US$1 billion project is planned to have three stages of development. The first stage involves building a 250 megawatt IGCC plant in Tianjin. Construction began in 2009 and the plant was scheduled to begin operation by 2011, but since then delayed to 2012 spring. The work has also begun on the second stage, involving a smaller pilot plant which uses both fuel cells and turbines to generate electricity while converting CO2 for industrial use at the same time. The third stage, 400 megawatt power plant with carbon capture and storage (CCS) technology, was scheduled for 2015–2020.

In 2007, the project was joined by Peabody Energy, the world's largest private sector coal company.

See also

References

  1. Oster, Shai (2009-12-15). "World's Top Polluter Emerges as Green-Technology Leader". The Wall Street Journal. Retrieved 22 December 2009.
  2. "Timeline". GreenGen Project. Archived from the original on 30 July 2010. Retrieved 22 December 2009.
  3. "GreenGen Fact Sheet". Carbon Capture and Sequestration Technologies Program at MIT. Retrieved 22 December 2009.
  4. Jeff Tollefson, Richard Van Noorden (2012). "Slow progress to cleaner coal". Nature. 484 (7393). Nature Publishing Group: 151–152. Bibcode:2012Natur.484..151T. doi:10.1038/484151a. PMID 22498603.
  5. "Peabody Energy Joins China's 'GreenGen' to Develop Near-Zero Emissions Coal Plant". PRNewswire. 2007-12-11. Retrieved 22 December 2009.

External links

Categories: