Misplaced Pages

Guangzhou–Heyuan high-speed railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Planned railway line in Guangdong, China
Guangzhou–Heyuan high-speed railway
Overview
StatusPlanned
LocaleGuangdong
Termini
Service
Operator(s)China Railway High-speed
Technical
Line length190 km (118 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification50 Hz 25,000 V

The Guangzhou–Heyuan high-speed railway is a planned railway line in Guangdong, China. It will be 190 kilometres (120 mi) long.

Route

The line starts at Guangzhou North railway station and heads east. Stops are planned at Baiyun Airport Terminal 3, Conghua, Yonghan, and Longmen. The eastern terminus will be Heyuan East. The line is planned as part of a new high-speed rail channel between Zhanjiang and Meizhou.

References

  1. ^ "又有利好!广河高铁也要经增城!" (in Chinese). 搜狐. 12 February 2018. Retrieved 2 May 2021.
  2. "河源热盼高铁时速广河高铁规划仍未获铁总批复" (in Chinese). 0762home.com. 27 October 2015. Retrieved 2 May 2021.
Stub icon

This People's Republic of China rail-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: