Hongasandra metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Upcoming Namma Metro station under Yellow Line

Hongasandra
Namma Metro station
Final stages of this metro station as of April 2024
General information
Other namesGarvebhavi Palya
LocationHongasandra, Bengaluru, Karnataka 560068
Coordinates12°54′06″N 77°37′55″E / 12.90165°N 77.63208°E / 12.90165; 77.63208
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
ArchitectITD - ITD Cementation India JV
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
OpeningApril 2025; 2 months' time (April 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Bommanahallitowards Rashtreeya Vidyalaya Road Yellow Line(Operational around April 2025) Kudlu Gatetowards Bommasandra
Route map
Legend
Rashtreeya Vidyalaya Road Green Line
Ragigudda
Jayadeva Hospital
Pink Line
Under construction
BTM Layout
Central Silk Board
Blue Line
Under construction
Bommanahalli
Hongasandra
Kudlu Gate
Singasandra
Hosa Road
Beratena Agrahara
Electronic City
Infosys Foundation Konappana Agrahara
Huskur Road
Biocon Hebbagodi
Mainline rail interchange Hebbagodi Depot (U/C)
Delta Electronics - Bommasandra
Location

Hongasandra (also known as Garvebhavi Palya) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

As per latest reports, the Yellow Line is slated to be operational around April 2025 instead of January 2025 with four trainsets which will be ready for operations after arriving from Titagarh Rail Systems in Kolkata.

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Hongasandra metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates. Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Station Layout (TBC)

Hongasandra track layout (TBC)
Legend
to Bommanahalli
P1P2
to Kudlu Gate
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Kudlu Gate
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Bommanahalli
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

This section is empty. You can help by adding to it. (December 2024)

See also

Portals:

References

  1. "Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway". Deccan Herald. Retrieved 7 January 2025.
  2. "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  3. DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  4. "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Hosa Rd - HSR Layout". The Metro Rail Guy. 25 April 2017. Retrieved 24 October 2024.

External links

Namma Metro
Yellow Line 3
Awaiting
Trainsets
Planned
  • Narayana Hospital
  • Chandapura
  • Attibele Industrial Area
  • Attibele
  • Zuzuvadi
  • Hosur SIPCOT Park 1
  • Hosur Bus Terminal Interchange
  • Hosur SIPCOT Park 2
Depot(s)
See also
*Stations in italics are Under Construction