History | |
---|---|
Italy | |
Name | Giovanni delle Bande Nere |
Namesake | Giovanni delle Bande Nere |
Ordered | 2014 |
Builder | Fincantieri, Muggiano |
Cost | €3.9 billion |
Laid down | 28 August 2019 |
Launched | 12 February 2022 |
Commissioned | 2 October 2024 |
Identification | Pennant number: P434 |
Status | Active |
General characteristics | |
Class and type | Thaon di Revel-class offshore patrol vessel |
Displacement | |
Length | |
Beam | 16.5 m (54 ft 2 in) |
Draught | 10.5 m (34 ft 5 in) |
Depth | 5 m (16 ft 5 in) |
Propulsion |
|
Speed |
|
Range | 5,000 nmi (9,300 km; 5,800 mi) at 15 knots (28 km/h; 17 mph) |
Complement | 173 beds (+ 30 on modular rear zone) |
Crew | PPA Full 120 crew; PPA Light+ + 90; PPA Light 90; (add 24 crew for two helos on board and other 89/59 beds for optional boarding team, marines team, maritime command staffs, etc.) |
Sensors and processing systems |
|
Electronic warfare & decoys |
|
Armament |
|
Aircraft carried | |
Aviation facilities |
|
Giovanni delle Bande Nere (P434) is the fourth ship of the Thaon di Revel-class offshore patrol vessels built for the Italian Navy.
Development and design
The ship is the first full capability variant of the PPA design. Its armament will include 16 Aster 15 and Aster 30 surface-to-air missiles, Teseo anti-ship missiles, two triple launchers for MU90 torpedoes, a 127 mm and 76mm turret and two remotely operated 25 mm mounts. Sensors include an ATAS towed sonar for anti-submarine warfare and a Black Snake antenna for torpedo detection, as well as ODLS 20 decoy launchers with anti-missile and anti-torpedo countermeasures. Like other PPAs, the main radar is a Leonardo Kronos with four fixed panels.
The Italian Navy ordered the new MBDA TESEO MK/2E heavy-duty missile (TESEO "EVO"), a long-range anti-ship missilewith also strategic land attack capability. The missile will have a new terminal "head" with dual RF seeker (Radio Frequency) and, presumably, given the need to even attack ground targets, IIR (Imaging IR). Compared to the predecessor OTOMAT/TESEO, the TESEO "EVO" MK/2E has a double range or more than 360 km. Former OTOMAT is accredited for a range of action of more than 180 km.
Construction and career
Giovanni delle Bande Nere was laid down on 28 August 2019 at Fincantieri Muggiano and was launched on 12 February 2022. The ship was reported on sea trials as of August 2022. It was commissioned on 2 October 2024.
References
- "Fincantieri: consegnato a Muggiano il quarto PPA "Giovanni delle Bande Nere"". 2 October 2024.
- ^ "Marine italienne : Le premier PPA « Full » a débuté ses essais en mer | Mer et Marine". 25 August 2022.
- "Lacroix Defense - Naval Solutions - Sylena Range".
- "Kronos Naval".
- "Active Towed Array System (Atas)".
- "Un nuovo TESEO land attack per la Marina - RID Portale Difesa". portaledifesa.it. Archived from the original on 14 July 2018. Retrieved 15 March 2021.
- "Mbda: le evoluzioni di Marte e Teseo al centro delle attività del sito di La Spezia". Airpress Online. Archived from the original on 1 March 2020. Retrieved 15 March 2021.
- "Mbda, al via lo sviluppo del nuovo Teseo". Trasporti-Italia.com. Retrieved 15 March 2021.
- "Varato a Riva Trigoso il "Giovanni Delle Bande Nere", quarto PPA per la Marina". www.analisidifesa.it. Retrieved 12 February 2022.
- "Fincantieri delivers the fourth PPA Giovanni delle Bande Nere". 5 October 2024.
External links
- Pattugliatori Polivalenti di Altura Marina Militare website
Thaon di Revel-class offshore patrol vessels | |
---|---|