KSR Bengaluru - Dharwad - Belgaum Vande Bharat Express | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
This Mini VB Express train on standby at KSR Bengaluru City Jn | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service type | Vande Bharat Express | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Karnataka | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
First service | 27 June 2023 (27 June 2023) (Inaugural run) 28 June 2023; 18 months ago (28 June 2023) (Commercial run) (Extension to Belgaum) (TBC) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Current operator(s) | South Western Railways (SWR) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | KSR Bengaluru City Jn (SBC) Dharwad (DWR) (Extn (TBC)) Belagavi (BGM) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stops | 4 6 (after extn to Belgaum) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Distance travelled | 490 km (304 mi) After Extn, 612 km (380 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average journey time | 06 hrs 25 mins | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service frequency | Six days a week | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Train number(s) | 20661 / 20662 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) used | Bengaluru - Hubli line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
On-board services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Class(es) | AC Chair Car, AC Executive Chair Car | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Seating arrangements |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sleeping arrangements | No | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Catering facilities | On-board catering(veg, non_veg) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Observation facilities | Large windows in all coaches | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Entertainment facilities |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Baggage facilities | Overhead racks | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other facilities | Kavach | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Mini Vande Bharat 2.0 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | Indian gauge 1,676 mm (5 ft 6 in) broad gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC Overhead line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 89.5 km/h (56 mph) (Avg, between KSR Bengaluru and Hubli Jn.) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average length | 192 metres (630 ft) (08 coaches) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track owner(s) | Indian Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rake maintenance | KSR Bengaluru City Jn (SBC) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The 20661/20662 KSR Bengaluru - Dharwad Vande Bharat Express is India's 21st Vande Bharat Express train, connecting the city of Bengaluru with Dharwad city in Karnataka. This train was flagged off by Prime Minister Narendra Modi on 27 June 2023 via video conference from Rani Kamalapati (Habibganj) railway station.
As per latest updates, this VB express will continue its journey and will terminate at Belagavi (Belgaum) railway station at an earlier convenient date.
On 21 November 2023, the trial run was performed by starting from KSR Bangalore City Jn around 05:45am and terminating at Belagavi at 01:30pm. It left from Belgaum at 02:00pm and reached Bengaluru City at 10:10pm.
Overview
This train is operated by Indian Railways, connecting KSR Bengaluru City Jn, Yesvantpur Jn, Tumkur, Davangere, SSS Hubballi Junction and Dharwad. It is currently operated with train numbers 20661/20662 on 6 days a week basis.
Rakes
It is the nineteenth 2nd Generation and the seventh Mini Vande Bharat 2.0 Express train which was designed and manufactured by the Integral Coach Factory at Perambur, Chennai under the Make in India Initiative.
Service
The 20661/20662 KSR Bengaluru - Dharwad Vande Bharat Express operates 6 days a week, covering a distance of 495 km (308 mi) in a travel time of 6 hrs 25 mins with an average speed of 76 km/h (47 mph). The Maximum Permissible Speed is 110 km/h (68 mph).
See also
- Vande Bharat Express
- Gatimaan Express
- Tejas Express
- KSR Bengaluru–Hubli Jan Shatabdi Express
- Bangalore City railway station
- Dharwad railway station
Notes
- Except Tuesdays
References
- "Bengaluru-Dharwad Vande Bharat Timings to Change Starting October 7 | Details". 7 October 2023.
- "Karnataka: Vande Bharat Express likely to connect IT capital Bengaluru with Hubballi-Dharwad by July". Moneycontrol. 1 June 2023. Retrieved 15 June 2023.
- "Karnataka's exclusive Vande Bharat likely to start ops on June 28". Deccan Herald. 15 June 2023. Retrieved 16 June 2023.
- "All you need to know about Bengaluru-Dharwad Vande Bharat express". Moneycontrol. 26 June 2023. Retrieved 26 June 2023.
- "PM Modi Inaugurates Karnataka's Second Vande Bharat: Ticket Rates, Timings and Other Details of Bengaluru-Dharwad VB Express". TimesNow. 27 June 2023. Retrieved 27 June 2023.
- "PM Narendra Modi likely to launch Vande Bharat Express in Karnataka on June 26: Report". Hindustan Times. 15 June 2023. Retrieved 15 June 2023.
- https://www.facebook.com/Belagaviinfra (24 June 2023). "Vande Bharat express will be extended to Belagavi when these 2 difficulties are solved : MP Kadadi". belagaviinfra.co.in/. Retrieved 24 June 2023.
{{cite web}}
:|last=
has generic name (help); External link in
(help)|last=
- DHNS. "Bengaluru-Dharwad Vande Bharat to run up to Belagavi by November-end". Deccan Herald. Retrieved 16 November 2023.
- admin (18 November 2023). "KSR Bengaluru-Belagavi Vande Bharat Express to have trial run on Nov.21". belagaviinfra.co.in/. Retrieved 18 November 2023.
- "Unraveling The Delay In Commencing Vande Bharat Services From Belagavi To Bengaluru - All About Belgaum". 7 December 2023. Retrieved 8 December 2023.
- "VB Express commences trial run between Bengaluru and Belagavi". The Times of India. 22 November 2023. ISSN 0971-8257. Retrieved 22 November 2023.
- "Minister of State for Railways Shri V. Somanna Inaugurates Vande Bharat Express Stoppage at Tumakuru Railway Station". PIB.GOV.IN. 23 August 2024. Retrieved 24 August 2024.
- "Bengaluru-Dharwad Vande Bharat Express: Route, stops, fare". News9live. 4 April 2024. Retrieved 5 April 2024.
- "Trial run of Vande Bharat Express between Dharwad – Bengaluru conducted". Free Press Journal. Retrieved 21 June 2023.
- "Bengaluru-Dharwad Vande Bharat Express Launch On June 27: Timing, Route, Ticket Prices". Zee News. Retrieved 24 June 2023.
- "India's 23rd Vande Bharat Express receives huge responses from rail passengers – Know its routes, frequency, stoppages, distance and significance". Financialexpress. 29 June 2023. Retrieved 29 June 2023.
- "Train 18, India's Fastest, Named "Vande Bharat Express": Piyush Goyal". NDTV.com. Retrieved 19 April 2023.
- "5 hrs 15 mins travel time for B'luru-Dharwad Vande Bharat train". Deccan Herald. 25 June 2023. Retrieved 25 June 2023.
- "Bengaluru-Dharwad Vande Bharat Express to be launched soon: Check timings, ticket prices, stoppages and route details". Zee Business. 23 June 2023. Retrieved 23 June 2023.
- "PM Modi to flag off Bengaluru-Dharwad Vande Bharat Express tomorrow: Here's the schedule and price list". The Indian Express. 26 June 2023. Retrieved 26 June 2023.