Misplaced Pages

Line 11 (Beijing Subway)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Metro line in Beijing, China
Line 11
Line 11 train leaving Jin'anqiao station
Overview
Other name(s)M11 (planned name)
Winter Olympic Branch Line (nickname for Phase 1)
StatusOperational
Termini
Stations4
Service
TypeRapid transit
SystemBeijing Subway
Rolling stockType A, 4-car / 6-car
History
Opened31 December 2021; 2 years ago (2021-12-31)
Technical
Line length4.2 km (2.6 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Operating speed100 km/h (62 mph)
Route map

Legend
Moshikou
Jingmen railway crossing
Line S1 Left arrow ShichangPingguoyuan Right arrow
Line 6 Lucheng Right arrow
Jin'anqiao
Beixin'an
Xinshougang (Shougang Park)
extension to Beijing West railway station and Lize Shangwuqu

Line 11 of the Beijing Subway (Chinese: 北京地铁11号线; pinyin: běijīng dìtiě shíyī hàoxiàn) is a rapid transit line of the Beijing Subway. The line opened between Jin'anqiao and Xinshougang (Shougang Park) on December 31, 2021, and between Jin'anqiao and Moshikou on December 30, 2023. Line 11's color is grapefruit.

Opening timeline

Segment Commencement Length Station(s) Name
Jin'anqiao — Shougang Park 31 December 2021 1.5 km (0.93 mi) 3 Phase 1
Moshikou — Jin'anqiao 30 December 2023 1.4 km (0.87 mi) 1

Stations

Phase 1

All stations are in Shijingshan.

Station Name Connections Nearby Bus Stops Distance
km
English Chinese
Moshikou 模式口 336 358 489 597 876 932 941 961 972 977 快速直达专线135 0.000 0.000
Jin'anqiao 金安桥  6   S1  325 336 337 358 370 396 472 489 502 876 892 920 921 929 931 932 941 941快 948 959 961 977 977快 981 BRT4(快速公交4) 快速直达专线135 快速直达专线142 快速直达专线150 M3 M4 M5 M6 M7 M11 M16 M20 M22 专61 专110 专148 1.366 1.366
Beixin'an 北辛安 337 941 959 专61 专148 0.850 2.216
Xinshougang (Shougang Park) 新首钢 992 专108 专218 0.689 2.905

Phase 2

  • Under Planning.
  • There are suggestions to add an infill station between Qingta and Lianhuaqiao stations on Phase 2 of Line 11. In July 2024, the infill station, Wanfeng Lu, was confirmed in official news.
Station Name Connections Nearby Bus Stops Distance
km
English Chinese
Xingcai 型材    
Guoluchang Nanlu 锅炉厂南路    
Yamenkouxi 衙门口西    
Tiyuchang Nanjie 体育场南街  1  (Branch) (U/C)    
Yamenkoudong 衙门口东    
Lugu Dajie 鲁谷大街    
Wujiacun 吴家村    
Xiaowayao 小瓦窑    
Qingta 青塔    
Wanfeng Lu 万丰路    
Lianhuaqiao 莲花桥  10     
Beijing West railway station 北京西站  7   9 
China Railway Beijing West railway station BXP
   
Maliandao 马连道    
Lize Shangwuqu 丽泽商务区  14   16  (U/C)
 Daxing Airport  (U/C)
   

History

Old planning

In 2006, Line 11 was originally designed as an L-shaped line from Wanliu to Dahongmen, which together with the L-shaped Line 10, form a subway ring route. After Line 10 Phase II took over the entire ring route, Line 11 was displaced.

In January 2010, the government of Shijingshan District disclosed plans for a Line 11 in western Beijing that would traverse the Shougang (Beijing Capital Steel) complex and intersect with Lines 4 and 16.

Phase 1

Construction started on November 13, 2019. The western section (Phase 1) of Line 11 (Moshikou station — Xinshougang station), also known as "Winter Olympic Branch Line", is 4.2 km (2.6 mi) in length with 4 stations. It is fully underground.

Jin'anqiao, Beixin'an and Xinshougang (Shougang Park) stations opened on December 31, 2021. Moshikou station opened on December 30, 2023.

Phase 2

According to the information released on January 11, 2022, Phase II of Line 11 to Lize Shangwuqu and Yangqiao is included in the "Beijing Rail Transit Phase III Construction Plan". In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) confirmed that it will be 23.8 km (14.8 mi) long with 17 stations.

On 8 July 2024, a tender announcement modified phase 2 of line 3 to be 17.4 km (10.8 mi) with 14 stations. The section between Lize Shangwuqu and Yangqiao was not approved by the NDRC and removed from the short-term plan. It was announced that Yamenkoudong, Wujiacun, Xiaowayao, Wanfenglu, Lianhuaqiao, Maliandao, Lize Shangwuqu and Tiyuchang Nanjie stations will start constructions.

References

  1. "『北京』地铁11号线西段首列车下线". 2021-07-30.
  2. ^ "北京地铁11号线西段等轨道新线2021年开通" [Beijing Subway Line 11 West Section and other new metro lines to open in 2021]. 2021-01-08. Archived from the original on 2021-02-17.
  3. ^ "北京轨道交通11号线西段(冬奥支线)工程环境影响报告书" (PDF). Retrieved 2020-02-21.
  4. ^ "地铁冬奥支线分秒必争保工期". 首都建设报. 2020-02-20. Archived from the original on 2020-02-20. Retrieved 2020-02-21.
  5. "北京地铁冬奥支线规划来了!全天运营18小时,更多细节披露". 2019-07-09.
  6. ^ "北京地铁11号线西段(冬奥支线)01标工程正式开工". 2019-11-14.
  7. ^ "地铁17号线北段等三条地铁线(段)开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 2023-12-29. Retrieved 2023-12-29. 2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
  8. "年底见!17号线北段和16号线剩余段开通筹备中~". mp.weixin.qq.com. Beijing MTR Corporation Limited. 2023-12-18. Retrieved 2023-12-19.
  9. "11号线路网车站站间距信息". Retrieved 2022-02-18.
  10. "站间距信息". 北京地铁.
  11. "关于11号地铁在青塔站和莲花桥站之间增设一站". Archived from the original on 2023-04-20.
  12. "北京地铁11线东段站点设置". Archived from the original on 2023-04-20.
  13. ^ "两条地铁线有新消息涉及丰台" (PDF). 2024-07-12. 万丰路站
  14. "地铁11号线二期已启动西段东延线站位选线选址工作". Archived from the original on 2023-04-20.
  15. ^ "北京地铁1号线今年将建支线". 2023-03-03.
  16. (Chinese) "北京再添三条地铁线 六号十一号线正岩土勘探" 北京青年报 Archived 2007-01-25 at the Wayback Machine 2006-12-04
  17. (Chinese) "北京地铁M11线2020年启动建设 将纵贯首钢整个厂区" Archived 2011-07-20 at the Wayback Machine Jan. 13, 2010
  18. (Chinese)"北京地铁16号线车站设计方案展示" Archived 2013-10-07 at the Wayback Machine 2013.4.25
  19. "北京石景山:2019年力争开建M11线冬奥支线". 2019-01-11. Archived from the original on January 11, 2019.
  20. "北京轨道交通11号线西段(冬奥支线)工程 社会稳定风险分析公众参与信息公示". 2019-04-09. Archived from the original on 2019-05-29. Retrieved 2019-05-23.
  21. "年底交付运营!地铁11号线模式口站最新进展". 2022-11-15.
  22. "北京市轨道交通第三期建设规划环境影响评价第一次公示_信息公开_北京市基础设施投资有限公司". www.bii.com.cn. Retrieved 2022-01-27.
  23. "北京市轨道交通第三期建设规划(2022-2027年)环境影响报告书(征求意见稿).pdf" (PDF). China Academy of Railway Sciences Co., Ltd. 2022-07-08. Archived from the original (PDF) on 2022-07-08. Retrieved 2022-07-08.
  24. "北京轨道交通11号线二期工程设计01合同段(总体总包)(方案设计、初步设计、施工图设计)招标公告". 北京市公共资源综合交易系统. 2024-07-08. Retrieved 2024-07-10.
  25. "北京轨道交通11号线二期工程设计02合同段(土建工点设计)(方案设计、初步设计、施工图设计)招标公告". 北京市公共资源综合交易系统. 2024-07-08. Retrieved 2024-07-10. 包括起点~ 衙门口东站(不含)、出入段线,3站5区间及1出入段线
  26. "北京轨道交通11号线二期工程设计03合同段(土建工点设计)(方案设计、初步设计、施工图设计)招标公告". 北京市公共资源综合交易系统. 2024-07-08. Retrieved 2024-07-10. 包括衙门口东站(含)~吴家村站(不含),2站2区间
  27. "北京轨道交通11号线二期工程设计04合同段(土建工点设计)(方案设计、初步设计、施工图设计)招标公告". 北京市公共资源综合交易系统. 2024-07-08. Retrieved 2024-07-10. 包括吴家村站(含)~小瓦窑站(含),2站1区间
  28. "北京轨道交通11号线二期工程设计05合同段(土建工点设计)(方案设计、初步设计、施工图设计)招标公告". 北京市公共资源综合交易系统. 2024-07-08. Retrieved 2024-07-10. 包括小瓦窑站(不含)~万丰路站(不含),1站2区间
  29. "北京轨道交通11号线二期工程设计06合同段(土建工点设计) (方案设计、初步设计、施工图设计)招标公告". 北京市公共资源综合交易系统. 2024-07-08. Retrieved 2024-07-10. 包括万丰路站(含)~莲花桥站(含),2站1区间
  30. "北京轨道交通11号线二期工程设计07合同段(土建工点设计) (方案设计、初步设计、施工图设计)招标公告". 北京市公共资源综合交易系统. 2024-07-08. Retrieved 2024-07-10. 包括莲花桥站(不含)~马连道站(不含),1站2区间
  31. "北京轨道交通11号线二期工程设计08合同段(土建工点设计) (方案设计、初步设计、施工图设计)招标公告". 北京市公共资源综合交易系统. 2024-07-08. Retrieved 2024-07-10. 包括马连道站(含)~丽泽商务区站(不含)及站后折返区间,1站2区间
  32. "北京轨道交通1号线支线工程土建施工监理06合同段监理资格预审公告". 北京市工程建设招标投标交易系统. 2024-05-23. Retrieved 2024-07-11. 本工程的建设规模 包括1站(体育场南街站(11号线部分))
Public transportation in Beijing
Beijing Subway Beijing Subway Beijing Subway
Lines in operation
Under construction
  •  1  (Renovation on Fushouling station and Branch)
  •  6  (South ext.)
  • Line 13 split project ( 13A  &  13B )
  •  17  (Middle section)
  •  Pinggu  (Line 22 & 23)
  •  28 
  •  Daxing Airport  (North ext.)
  •  M101 
Planned
  •  3  (Phase 2)
  •  7  (Phase 3)
  •  11  (Phase 2)
  •  12  (Phase 2)
  •  15  (East ext.)
  •  17  (Branch)
  •  19  (Extension and Branch)
  •  20  (Phase 1)
  •  Lijin  (Line 25 Phase 3)
  •  S6  (Line 21, Phase 1)
Trams in Beijing Trams in Beijing
Lines in operation
CR S-train
(Beijing Suburban Railway)
Lines in operation
Under construction
CR C/G-train
(intercity railways)
Lines in operation
Under construction
Other CR railways
Corridors
Major railways
Other urban transit
Lines in operation
Transportation hubs
List of airports in China Airports
China Railway Railway stations
Beijing Subway stations
Line 11
Stations that are proposed, under planning or under construction are shown in italics.
Categories: