This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations. Please help improve this article by introducing more precise citations. (April 2020) (Learn how and when to remove this message) |
You can help expand this article with text translated from the corresponding article in Hungarian. (April 2020) Click for important translation instructions.
|
M2 expressway | |
---|---|
M2-es autóút | |
in use planned other highways | |
M2 near Budapest | |
Route information | |
Part of E77 | |
Length | 30 km (19 mi)71 km (44 mi) planned |
Existed | 1996–present |
History | Expansion: 2017–19 |
Major junctions | |
From | M0 near Budapest |
Major intersections | |
To | Parassapuszta (Hont) (planned) R3 border with Slovakia |
Location | |
Country | Hungary |
Counties | Pest, Nógrád |
Major cities | Budapest, Dunakeszi, Vác |
Highway system | |
|
The M2 expressway (Hungarian: M2-es autóút) is a toll highway in northern Hungary, connecting Budapest to Vác and Banská Bystrica. The first section of the highway opened in 1996. It follows the route of the old Route 2 one-lane highway. The total length of the motorway now is 30 km.
Timeline
Section | Length | Opened | Notes |
---|---|---|---|
Budapest (M0) – Vác észak | 30.0 km (18.64 mi) | Single carriageway: 1998 Second carriageway: 1 October 2019 |
Built between 1996 – 1998. Originally the name of the route was 2A, and 2B. Both carriageways were fully built between 2017 – 2019 until Vác dél junction. |
Vác észak – Hont-Parassapuszta (border) | 41 km (25.48 mi) | Planned |
Route description
- The route is expressway. The maximum speed limit is 110km/h, with (2x2 lane road) until Vác dél junction.
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can. (November 2021) |
County | km | Type | Destination | Notes | |
---|---|---|---|---|---|
Budapest |
17 | Budapest Ring M0 / E77 – Budapest, towards to M3 / M4 / M5 + / M0 – Main road 2 Újpest, Megyeri Bridge, and Main road 11 Esztergom |
The southern terminus of the expressway, and E77 route.
Distance is measured from the Zero Kilometre Stone monument in Budapest. | ||
Pest |
21 | Dunakeszi / Fót | |||
23 | Dunakeszi-Tóváros / Fót-Kisalag | ||||
25 | Main road 2 – Dunakeszi-Révdűlő | ||||
Alagi pihenőhely | parking, petrol station (Shell), motel, café and restaurant
pihenőhely means Rest area | ||||
27 | Göd-Iparterület | Ipaterület means Industrial area | |||
29 | Göd | ||||
34 | Sződliget / Sződ | ||||
37 | Vác dél / Gödöllő, Vácrátót | The northern terminus of the expressway.
dél means South | |||
39 | Vác-Alsóváros, toward to Tahitótfalu / Rád, Vácduka | 1-lane expressway, planned expansion | |||
42 | Vác-Centrum, Deákvár / Kosd | Centrum means center | |||
48 | Vác észak, toward to Tahitótfalu / Main road 12 – Szob | Northern side of the road.
észak means North 1-lane expressway, planned expansion | |||
Nógrád |
56 | Nőtincs / Nógrád | Planned | ||
59 | Main road 2 – Rétság dél | dél means South | |||
61 | Rétsági pihenőhely | ||||
65 | Main road 22 – Rétság észak / Balassagyarmat, Érsekvadkert | észak means South | |||
83 | Drégelypalánki pihenőhely | planned petrol station | |||
Main road 2 – Drégelypalánk | |||||
88 | Hont-Parassauszta (H) – Šahy (SK) border crossing R3 / E77 – Banská Bystrica towards to Kraków (PL) |
Planned | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Maintenance
The operation and maintenance of the road by Hungarian Public Road Nonprofit Pte Ltd Co. This activity is provided by this highway engineer.
Payment
Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica)1, time-based fee vignettes (E-matrica);
- Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
Type of county vignette Available section Pest full length (17 km – 48 km)
European Route(s)
Name | Route | |
71 km | Rýchlostná cesta R3 – junction (16) |
See also
References
External links
- Exit list of M2
- National Toll Payment Services Plc. (in Hungarian, some information also in English)
- Hungarian Public Road Non-Profit Ltd. (Magyar Közút Nonprofit Zrt.)
- National Infrastructure Developer Ltd.
Highways in Hungary | ||
---|---|---|
Motorways | ||
Expressways | ||
under construction or planned | ||
former projects |