This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
M30 motorway | |
---|---|
M30-as autópálya | |
Part of Via Carpathia | |
in use other highways | |
M30 near Miskolc | |
Route information | |
Part of E71 / E79 | |
Length | 86.8 km (53.9 mi) |
Existed | 2002–present |
Major junctions | |
From | M3 near Emőd |
Major intersections | |
To | R4 border with Slovakia |
Location | |
Country | Hungary |
Counties | Borsod-Abaúj-Zemplén |
Major cities | Miskolc |
Highway system | |
|
The M30 motorway (Hungarian: M30-as autópálya) is a Hungarian motorway that connects the M3 motorway to the Slovak R4 expressway near the border town of Tornyosnémeti via Miskolc, forming part of European routes E71 and E79. The first section opened to the public in 2002, and reached the border area in October 2021.
The road is considered as part of the planned Via Carpathia from the Baltic coast to Sofia. It follows the route of main road 3.
Timeline
Section | Length | Opened | Notes |
---|---|---|---|
Mezőcsát (M3) – Emőd | 6.0 km (3.73 mi) | 2002 | |
Emőd – Nyékládháza | 8.0 km (4.97 mi) | 2003 | |
Nyékládháza – Miskolc kelet | 15.0 km (9.32 mi) | December 2004 | with Miskolc bypass I. |
Miskolc bypass II. (Miskolc kelet – Miskolc észak) |
3.0 km (1.86 mi) | Single carriageway: 26 June 2015 Second carriageway: 26 October 2021 |
Both carriageways were fully built between 2018 – 2021. |
Miskolc észak – Tornyosnémeti | 56.8 km (35.29 mi) | 26 October 2021 | Built between 2018 – 2021. |
Tornyosnémeti to the border | 1.7 km (1.06 mi) | 16 January 2018 |
Route description
- The route is full length motorway. The maximum speed limit is 130 km/h, with (2x2 lane road with stop lane).
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can. (November 2021) |
County | km | Type | Destination | Notes | |
---|---|---|---|---|---|
Borsod-Abaúj-Zemplén |
0 | M3 / E71 – Budapest
M3 / E79 – Nyíregyháza, Debrecen (M35) |
The southern terminus of the motorway, E71, E79 route, and Via Carpathia.
Kilometrage starting point | ||
6 | Emőd | ||||
12 | Hejőkeresztúri pihenőhely | parking, WC, and water
pihenőhely means Rest area | |||
14 | Main road 35 – Nyékládháza / Tiszaújváros | ||||
21 | Sajópetri / Kistokaj | ||||
24 | Main road 304 – Miskolc dél, Mályi | Southern end of Miskolc bypass
dél means South | |||
Sajó híd | híd means Bridge | ||||
30 | 3 / E71 – Miskolc kelet, Felsőzsolca / Main road 37 – Sátoraljaújhely, Szerencs |
kelet means East | |||
33 | Main road 306 – Miskolc észak, towards to Main road 26 – Kazincbarcika |
Connecting to the Airport and Miskolc Industrial Park
Northern end of Miskolc bypass észak means North | |||
35 | Tengelysúlymérő állomás | Tengelysúlymérő állomás means weigh in motion (traffic control) | |||
40 | Main road 3 – Szikszó | Connecting to Angel Truck Parking with petrol station, restaurant, wc, and shower facilities. | |||
51 | Halmaj / Kázsmárk | ||||
56 | Abaúj pihenőhely | parking, WC, and water (petrol station in the future) | |||
64 | Main road 3 – Forró / Main road 39 – Encs | Connecting to petrol station and the highway engineers | |||
67 | Aba Sámuel pihenőhely | parking, WC, and water | |||
75 | Main road 3 – Novajidrány, Garadna | ||||
81 | Main road 3 – Hidasnémeti, Gönc, Hernádszurdok | Incomplete junction: exit ramp only from/to → Budapest | |||
85 | Szent Erzsébet pihenőhely | parking, WC, and water | |||
86 | Tornyosnémeti | Connecting to Autohof MyWay Truck Parking with restaurant, wc, and shower facilities. | |||
88 | Tornyosnémeti (H) – Milhosť (SK) border crossing R4 / E71 – Košice |
Tornyosnémeti border crossing to Slovakia → R4 expressway.
The northern terminus of the motorway, E71 concurrency, and Via Carpathia. | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Maintenance
The operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc. This activity is provided by these highway engineers.
Payment
Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica);
- Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
Type of county vignette | Available section |
---|---|
Borsod-Abaúj-Zemplén | full length (0 km – 86 km) |
European Route(s)
Name | Route | |
86 km | Rýchlostná cesta R4 – junction (0) | |
See also
References
- "New section of M30 motorway between Hungary and Slovakia to boost growth, cut traffic-Projects". ec.europa.eu. Retrieved 2021-08-29.
- "Közvetlen autópálya kapcsolat jött létre Miskolc és Kassa között". Nif. Retrieved 2021-10-27.
- "National Toll Payment Services PLC - E-vignette rates from 1 January 2024". toll-charge.hu.
External links
- Exit list of M30
- National Toll Payment Services Plc. (in Hungarian, some information also in English)
- National Infrastructure Developer Ltd.
- Cohesion fund project
Highways in Hungary | ||
---|---|---|
Motorways | ||
Expressways | ||
under construction or planned | ||
former projects |
This Hungarian road or road transport-related article is a stub. You can help Misplaced Pages by expanding it. |