Mesgi'g Ugju's'n Wind Farm | |
---|---|
Country | Canada |
Coordinates | 48°13′05″N 66°42′26″W / 48.21806°N 66.70722°W / 48.21806; -66.70722 |
Status | Operational |
Construction began | June 22, 2015 |
Commission date | 2017 |
Construction cost | $330,000,000 (2013) |
Owner | Parc éolien Mesgi'g Ugju's'n (MU) S.E.C |
Wind farm | |
Hub height | 100 m |
Rotor diameter | 114 m |
Rated wind speed | 12 m/s |
Site area | 25,863 ha |
Power generation | |
Units operational | 47 |
Make and model | Senvion 3.2M114 |
Nameplate capacity | 149.25 MW |
External links | |
Website | www |
[edit on Wikidata] |
The Mesgi'g Ugju's'n (MU) Wind Farm, "big wind" in Mi'gmaq is a 149.25 megawatt (MW) wind farm currently under construction in eastern Quebec, Canada. The MU wind farm is expected to produce enough electricity to power approximately 30,000 homes. The wind project is owned and developed in a 50-50 partnership between the three Mi’gmaq First Nations (Listuguj, Gesgapegiag, Gespeg) and Innergex Renewable Energy.
The wind farm became operational in 2017.
See also
References
- "A page of history was turned: Quebec's first 3.2M114 wind turbine is built!". Retrieved 2016-06-29.
- "Senvion wins 150 Megawatt contract for Canadian wind farm" (PDF). Senvion. Archived from the original (PDF) on 14 July 2015. Retrieved 5 May 2015.
- "History Site-Micmac Interpretation Site of Gespeg on BonjourQuebec".
- "CHRONICLE 1 - Mesgi'g Ugju's'n" (PDF). innergex.com. Retrieved 4 June 2015.
- "Mesgi'g Ugju's'n". Innergex.com. Retrieved 4 June 2015.