Misplaced Pages

Minto Flywheel Facility

Article snapshot taken from[REDACTED] with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Minto Flywheel Facility for grid frequency regulation was the first in Canada.

The 2 MW (for 15 min) flywheel storage facility in Minto Ontario, Canada opened in 2014.

The flywheel system (developed by NRStor and built by Temporal Power) uses 10 spinning steel flywheels on magnetic bearings.

References

  1. ^ Willis, Ben (2014-07-23). "Canada's first grid storage system launches in Ontario". PV-Tech Storage. Archived from the original on 2015-11-22.
  2. "IESO Expedited System Impact Assessment - Minto Flywheel Facility" (PDF). Independent Electricity System Operator. 2013. Archived from the original (PDF) on 2016-01-29.

Stub icon

This article about a building or structure in Ontario is a stub. You can help Misplaced Pages by expanding it.

Categories:
Minto Flywheel Facility Add topic