Muxi Yuan 木樨园 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Platform | |||||||||||
General information | |||||||||||
Other names | Muxiyuanqiao North (木樨园桥北) | ||||||||||
Location | Yongdingmenwai Subdistrict, Dongcheng District, Beijing China | ||||||||||
Coordinates | 39°51′31″N 116°23′37″E / 39.858673°N 116.393598°E / 39.858673; 116.393598 | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 8 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2018 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Muxi Yuan station (Chinese: 木樨园站; pinyin: Mùxīyuán zhàn) is a station on Line 8 of the Beijing Subway. It was opened on December 30, 2018.
Station layout
The station has an underground island platform.
Exits
There are 5 exits, lettered A1, A2, B1, B2, and C. Exits A2 and B2 are accessible.
References
- ^ "北京地铁线路图". 北京地铁. Archived from the original on 2021-12-31.
- "两条地铁新线开通试运营". Archived from the original on December 30, 2018.
- "重磅!8号线南段明天开通!【站内、站外】全解析,带你提前"坐"地铁!". 2018-12-29.
木樨园站车站设置西北(A1)、西北(A2)、东北(B1)、东北(B2)、东南(C)五个出入口
Beijing Subway stations | |
---|---|
Line 8 |
|
Stations that are proposed, under planning or under construction are shown in italics. |
This article related to the Beijing Subway is a stub. You can help Misplaced Pages by expanding it. |