Misplaced Pages

Permissive Working

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Permissive Working (railway))
The smaller signal arm is a 'Calling On' signal, which when showing 'Proceed' allows a train to enter a section already occupied by another train

Permissive Working on a railway in the United Kingdom allows more than one train at a time to be on the same line in a block section, a signal section or a dead-end platform line.

Authorisation

The areas where Permissive Working is allowed are given in Table A of the Network Rail Sectional Appendix.

Exceptions

Even where it is not authorised, a shunting movement can be allowed to enter a portion of line that is already occupied providing that it is for the purpose of:

  • attaching vehicles
  • detaching vehicles
  • removing vehicles.

Driving towards another train

When it is permitted to drive a train towards the rear of another train, such as where trains queue to enter or exit a depot, the driver must:

  • proceed with caution
  • not pass a signal which has been cleared for the train in front until it has been replaced to danger and then cleared for their movement.

References

  1. UK Rulebook - Permissive Working. GE/RT8000 Rule Book Module TW1 (Train Working) Section 20 (PDF).
Stub icon

This rail-transport related article is a stub. You can help Misplaced Pages by expanding it.

Categories: