Overview | |
---|---|
Service type | Express |
First service | 1 April 1970; 54 years ago (1970-04-01) |
Current operator(s) | North Eastern Railway |
Route | |
Termini | Shaktinagar Terminal (SKTN) Tanakpur (TPU) |
Stops | 36 |
Distance travelled | 860 km (534 mi) |
Average journey time | 23 hrs 40 mins |
Service frequency | 4 days a week. |
Train number(s) | 15075 / 15076 |
On-board services | |
Class(es) | AC 2 tier, AC 3 tier, Sleeper class, General Unreserved |
Seating arrangements | No |
Sleeping arrangements | Yes |
Catering facilities | On-board catering, E-catering |
Observation facilities | Large windows |
Baggage facilities | No |
Other facilities | Below the seats |
Technical | |
Rolling stock | LHB coach |
Track gauge | 1,676 mm (5 ft 6 in) |
Operating speed | 36 km/h (22 mph) average including halts. |
The 15075 / 15076 Shaktinagar Terminal-Tanakpur Triveni Express is an Express train belonging to North Eastern Railway zone that runs between Shaktinagar Terminal and Tanakpur in India. It is currently being operated with 15075/15076 train numbers on four days in week basis.
The name Triveni signifies the Triveni Sangam or the meeting pointing of three rivers of the Ganges, the Yamuna and the Saraswati at Prayag in Prayagraj which is a station on the train's route.
Service
The 24369/Triveni Express has an average speed of 36 km/h and covers 741 km in 20h 50m. The 24370/Triveni Express has an average speed of 37 km/h and covers 741 km in 19h 55m.
Route and halts
The important halts of the train are:
- Shaktinagar Terminal
- Chopan
- Sonbhadra
- Chunar Junction
- Mirzapur
- Vindhyachal
- Naini Junction
- Prayagraj Junction
- Prayag Junction
- Rae Bareli Junction
- Lucknow Charbagh
- Hardoi
- Shahjahanpur
- Bareilly Junction
- Bareilly City
- Izzatnagar
- Pilibhit Junction
- Tanakpur
Coach composition
The train has standard ICF rakes with max speed of 110 kmph. The train consists of 15 coaches:
- 1 AC II Tier
- 1 AC III Tier
- 4 Sleeper Coaches
- 7 General
- 2 Seating cum Luggage Rake
Traction
Both trains are hauled by a Izzatnagar Loco Shed-based WAP-4 electric locomotive from Shaktinagar to Tanakpur and vice versa.
Rake sharing
The train shares its rake with 14369/14370 Triveni Express
Direction reversal
The train reverses its direction 1 times:
See also
- Shaktinagar Terminal railway station
- Bareilly Junction railway station
- Pilibhit Junction railway station
Notes
References
- "Pushpak Express delayed by 23 hours". The Times of India. 24 June 2015. Retrieved 27 September 2018.
- Triveni will now run two hours ago
External links
This Indian express train article is a stub. You can help Misplaced Pages by expanding it. |