Revision as of 06:24, 5 May 2023 editAntanO (talk | contribs)Autopatrolled, Extended confirmed users, New page reviewers, Pending changes reviewers, Rollbackers11,297 editsm Adding/removing wikilink(s)← Previous edit | Revision as of 18:39, 20 January 2024 edit undoभागने का प्रयास (talk | contribs)285 editsNo edit summaryTags: Reverted Visual editNext edit → | ||
Line 56: | Line 56: | ||
}} | }} | ||
The '''Randenigala Dam''' ({{lang-si|රන්දෙනිගල වේල්ල}}) is a large ] ] ] at Rantembe, in the ] of ].<ref name=MahaweliAuthority>{{cite web|title=Randenigala Dam and Reservoir|url=http://www.mahawelicomplex.lk/randdam.htm|publisher=Mahaweli Authority|access-date=12 January 2014}}</ref> Construction of the dam began in November 1982, and was completed in approximately {{Nowrap|4 years}}. The dam and power station |
The '''Randenigala Dam''' ({{lang-si|රන්දෙනිගල වේල්ල}}) is a large ] ] ] at Rantembe, in the ] of ].<ref name=MahaweliAuthority>{{cite web|title=Randenigala Dam and Reservoir|url=http://www.mahawelicomplex.lk/randdam.htm|publisher=Mahaweli Authority|access-date=12 January 2014}}</ref> Construction of the dam began in November 1982, and was completed in approximately {{Nowrap|4 years}}. The dam and power station wee ceremonially opened by then ] ] in 1986.<ref name=SundayTimes /> | ||
Construction of the dam cost approximately {{Nowrap|] 4.898 billion (1986)}}, of which 24.6% ({{Nowrap|Rs. 1.207 billion}}) was funded by the ], and the majority of the remainder by ].<ref name=SundayTimes>{{cite news|title=Sri Lanka's biggest river basin development project|url=http://www.sundaytimes.lk/101024/FunDay/fut_01.html|access-date=12 January 2014|newspaper=]|date=10 October 2010}}</ref> | Construction of the dam cost approximately {{Nowrap|] 4.898 billion (1986)}}, of which 24.6% ({{Nowrap|Rs. 1.207 billion}}) was funded by the ], and the majority of the remainder by ].<ref name=SundayTimes>{{cite news|title=Sri Lanka's biggest river basin development project|url=http://www.sundaytimes.lk/101024/FunDay/fut_01.html|access-date=12 January 2014|newspaper=]|date=10 October 2010}}</ref> |
Revision as of 18:39, 20 January 2024
Dam in Rantembe, Central ProvinceRandenigala Dam රන්දෙනිගල වේල්ල | |
---|---|
The Randenigala Dam as seen from the southern bank, with the power station in the background. | |
Country | Sri Lanka |
Location | Rantembe, Central Province |
Coordinates | 07°12′00″N 80°55′30″E / 7.20000°N 80.92500°E / 7.20000; 80.92500 |
Purpose | Power |
Status | Operational |
Construction began | November 1982 (1982-11) |
Opening date | 1986 (1986) |
Construction cost | Rs. 4.898 billion (1986) |
Owner(s) | Mahaweli Authority |
Dam and spillways | |
Type of dam | Embankment dam |
Impounds | Mahaweli River |
Height (foundation) | 94 m (308 ft) |
Length | 485 m (1,591 ft) |
Elevation at crest | 239 m (784 ft) |
Width (crest) | 10 m (33 ft) |
Width (base) | 303 m (994 ft) |
Spillways | 3 |
Spillway type | Tainter gate, chute |
Spillway capacity | 8,100 m/s (290,000 cu ft/s) |
Reservoir | |
Creates | Randenigala Reservoir |
Total capacity | 861,000,000 m (3.04×10 cu ft) |
Active capacity | 558,000,000 m (1.97×10 cu ft) |
Catchment area | 2,330 km (900 sq mi) |
Surface area | 1,350 ha (13.5 km) |
Operator(s) | CEB |
Turbines | 2 × 63 MW |
Installed capacity | 126 MW |
Annual generation | 428 GWh |
http://www.mahawelicomplex.lk/randdam.htm |
The Randenigala Dam (Template:Lang-si) is a large hydroelectric embankment dam at Rantembe, in the Central Province of Sri Lanka. Construction of the dam began in November 1982, and was completed in approximately 4 years. The dam and power station wee ceremonially opened by then President J. R. Jayawardene in 1986.
Construction of the dam cost approximately Rs. 4.898 billion (1986), of which 24.6% (Rs. 1.207 billion) was funded by the local government, and the majority of the remainder by Germany.
Dam
The Randenigala Dam is located 19 km (11.8 mi) downstream of the Victoria Dam, and 2.8 km (1.7 mi) upstream of the Rantembe Dam. Randenigala measures 94 m (308 ft) in height, 485 m (1,591 ft) in length, with a crest and base width of 10 m (33 ft) and 303 m (994 ft) respectively. The embankment dam is made mostly of rocks, and consists of a clay core.
Three large controlled tainter gate chute spillways, with a combined discharge volume of 8,100 m/s (290,000 cu ft/s), are constructed at the southern end of the dam. The three spillways measure 270 m (886 ft) in length, with a combined width of 48 m (157 ft).
Reservoir
The dam creates the Randenigala Reservoir. With a catchment area of 2,330 km (1,450 mi) and a total storage capacity of 861,000,000 m (3.04×10 cu ft), Randenigala is one of the largest reservoirs in the country.
The reservoir experiences approximately 1,250–3,000 mm (49.21–118.11 in) of rainfall annually. In addition to this, the reservoir is also topped up with water from the Victoria Reservoir upstream, and the Mahaweli River.
Power station
The power station is located immediately downstream of the dam, on the left bank. Water from the reservoir is delivered to the power station via a single steel-lined tunnel with a length and diameter of 270 m (886 ft) and 6.2 m (20.3 ft) respectively.
The plant consists of two generators with a rated capacity of 63 MW each, powered by two francis turbines. The units were commissioned in August and September 1986 respectively. At a combined capacity of 126 MW, the plant generates 428 GWh annually.
See also
References
- ^ "Randenigala Dam and Reservoir". Mahaweli Authority. Retrieved 12 January 2014.
- ^ "Sri Lanka's biggest river basin development project". The Sunday Times. 10 October 2010. Retrieved 12 January 2014.
External links
Electricity in Sri Lanka | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sustainable power stations |
| ||||||||||||
Fossil-fuel power stations |
| ||||||||||||
Organizations | |||||||||||||
Inland waters of Sri Lanka | |||||||
---|---|---|---|---|---|---|---|
Rivers |
| ||||||
Lakes |
| ||||||
Lagoons |
| ||||||
Dams and reservoirs |
| ||||||
Canals |