Misplaced Pages

Corrib gas project: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editContent deleted Content addedVisualWikitext
Revision as of 16:39, 22 March 2020 edit51.37.10.11 (talk) Planning problems← Previous edit Latest revision as of 12:47, 18 November 2024 edit undoWw2censor (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers107,953 edits Filled in bare reference(s) with reFill 2 
(41 intermediate revisions by 25 users not shown)
Line 1: Line 1:
{{Short description|Irish offshore natural gas field}}
{{Use dmy dates|date=July 2013}} {{Use dmy dates|date=October 2023}}
{{Infobox oil field {{Infobox oil field
| name = Corrib gas field | name = Corrib gas field
| country = ] | country = Ireland
| region = ] basin | region = ] basin
| location = west of the ] | location = west of the ], ]
| block = 18/20; 18/25 | block = 18/20; 18/25
| offonshore = offshore | offonshore = offshore
| coordinates = | coordinates =
| operator = ] | operator = ]
| partners = ] (43.5%)<br>] (36.5%)<br>Vermilion Energy (20%) | partners = Vermilion Energy (56.5%)<br />] (43.5%)
| contractors = | contractors =
| image = | image = Corrib Gas Field Map.png
| caption = | caption = Location of the Corrib gas field
| discovery = 1996 | discovery = 1996
| start_development = 2004 | start_development = 2004
| start_production = 2015<ref>{{Cite news |last=Murtagh |first=Peter |url=https://www.irishtimes.com/news/ireland/irish-news/natural-gas-begins-flowing-from-controversial-corrib-field-1.2480577 |title=Natural gas begins flowing from controversial Corrib field |date=30 December 2015 |newspaper=The Irish Times |accessdate=1 January 2020 }}</ref> | start_production = 2015<ref>{{Cite news |last=Murtagh |first=Peter |url=https://www.irishtimes.com/news/ireland/irish-news/natural-gas-begins-flowing-from-controversial-corrib-field-1.2480577 |title=Natural gas begins flowing from controversial Corrib field |date=30 December 2015 |newspaper=The Irish Times |access-date=1 January 2020 }}</ref>
| abandonment = | abandonment =
| peak_year = | peak_year =
Line 28: Line 29:
| formations = ] Sandstones | formations = ] Sandstones
}} }}
The '''Corrib gas project''' ({{lang-ga|Tionscanamh Ghás Aiceanta na Coiribe}}) entails the extraction of a ] deposit off the northwest coast of ]. The project includes a development of the Corrib gas field, and constructions of the natural gas pipeline and a gas processing plant. The project has attracted ]. The '''Corrib gas project''' ({{langx|ga|Tionscanamh Ghás Aiceanta na Coiribe}}) is a developed ] deposit located in the Atlantic Ocean, approximately {{convert|83|km}} off the northwest coast of ], Ireland. The project includes a natural gas pipeline and an onshore gas processing plant, which commenced gas production in 2015. During its development, the project attracted ].

The Corrib field is Ireland's only domestic source of natural gas production.<ref>{{Cite web|url=https://www.vermilionenergy.com/our-operations/europe/ireland.cfm|title=Ireland &#124; Vermilion Energy|website=vermilionenergy.com}}</ref>


==History== ==History==
Line 38: Line 41:
|volume=509 |volume=509
|date=20 October 1999 |date=20 October 1999
|accessdate=2009-11-12 |access-date=2009-11-12
|url-status=dead |url-status=dead
|archiveurl=https://web.archive.org/web/20110607134943/http://historical-debates.oireachtas.ie/D/0509/D.0509.199910200077.html |archive-url=https://web.archive.org/web/20110607134943/http://historical-debates.oireachtas.ie/D/0509/D.0509.199910200077.html
|archivedate= 7 June 2011 |archive-date= 7 June 2011
}} }}
</ref> The Corrib ] was discovered in 1996. It was the first reported commercial natural gas discovery in Ireland since the ] was discovered in 1971.<ref name="FirstSinceKinsale"> </ref> The Corrib ] was discovered in 1996. It was the first reported commercial natural gas discovery in Ireland since the ] was discovered in 1971.<ref name="FirstSinceKinsale">
{{Cite web {{Cite web
|url= http://iooa.ie/ireland%C2%92s-offshore-potential/ |url= http://iooa.ie/ireland%C2%92s-offshore-potential/
|title= Ireland Offshore Potential |title= Ireland Offshore Potential
|publisher= Irish Offshore Operators Association |publisher= Irish Offshore Operators Association
|accessdate= 3 April 2014 |access-date= 3 April 2014
|url-status= dead |url-status= dead
|archiveurl= https://web.archive.org/web/20140407060901/http://iooa.ie/ireland%C2%92s-offshore-potential/ |archive-url= https://web.archive.org/web/20140407060901/http://iooa.ie/ireland%C2%92s-offshore-potential/
|archivedate= 7 April 2014 |archive-date= 7 April 2014
|df= dmy-all
}} }}
</ref><ref name="KinsaleDiscovery"> </ref><ref name="KinsaleDiscovery">
Line 61: Line 63:
|archive-date= 19 January 2012 |archive-date= 19 January 2012
|title= Irish Natural Gas Market |title= Irish Natural Gas Market
|accessdate= 3 April 2014 |access-date= 3 April 2014
}} }}
</ref> The first appraisal well was drilled in 1997.<ref name="SubseaIQ">{{Cite web </ref> The first appraisal well was drilled in 1997.<ref name="SubseaIQ">{{Cite web
Line 68: Line 70:
|publisher = Bishop Interactive |publisher = Bishop Interactive
|work = SubseaIQ |work = SubseaIQ
|accessdate = 2010-08-09 |access-date = 2010-08-09
|archive-url = https://web.archive.org/web/20110716161451/http://subseaiq.com/(S(fb3fxnyuiy0jer550dq5o455))/data/Project.aspx?project_id=327 |archive-url = https://web.archive.org/web/20110716161451/http://subseaiq.com/(S(fb3fxnyuiy0jer550dq5o455))/data/Project.aspx?project_id=327
|archive-date = 16 July 2011 |archive-date = 16 July 2011
|url-status = dead |url-status = dead
}}</ref> A number of consents and approvals to develop the Corrib Project were issued in 2001.<ref name=department/>
|df = dmy-all
}}</ref> A number of consents and approvals to develop the Corrib Project were issued in 2001.<ref name=department/>


In 2002, Enterprise Oil was acquired by ] who took over the operatorship of the project. Development of the project began in 2004, but it was delayed in 2005 when locals opposed the project.<ref name="SubseaIQ"/> Shell announced the suspension of the project to facilitate further discussions with opposing parties. For a year, independent safety reviews were conducted to address various safety concerns in relation to the project. In 2002, Enterprise Oil was acquired by ] who took over the operatorship of the project. Development of the project began in 2004, but it was delayed in 2005 when locals opposed the project.<ref name="SubseaIQ"/> Shell announced the suspension of the project to facilitate further discussions with opposing parties. For a year, independent safety reviews were conducted to address various safety concerns in relation to the project.


In 1999, Saga Petroleum became a part of a ] and in 2007 a part of Statoil. In July 2009, ] acquired Marathon Oil's stake in the project.<ref>{{Cite web|author=The Earthtimes |url=http://www.earthtimes.org/articles/show/vermilion-energy-trust-closes-agreement,910234.shtml |archive-url=https://archive.is/20120729110355/http://www.earthtimes.org/articles/show/vermilion-energy-trust-closes-agreement,910234.shtml |url-status=dead |archive-date=2012-07-29 |title=Vermilion Energy Trust Closes Agreement to Acquire Working Interest in Corrib Field in Ireland |publisher=Earthtimes.org |accessdate=2009-11-12}} </ref><ref name=rigzone1>{{Cite web|url=http://www.rigzone.com/news/article.asp?a_id=79013 |title=Irish Minister Marks Vermilion's Entry into Corrib Gas Devt |publisher=Rigzone |date= |accessdate=2009-11-12}}</ref> In 1999, Saga Petroleum became a part of a ] and in 2007 a part of Statoil. In July 2009, ] acquired Marathon Oil's stake in the project.<ref>{{Cite web|author=The Earthtimes |url=http://www.earthtimes.org/articles/show/vermilion-energy-trust-closes-agreement,910234.shtml |archive-url=https://archive.today/20120729110355/http://www.earthtimes.org/articles/show/vermilion-energy-trust-closes-agreement,910234.shtml |url-status=dead |archive-date=2012-07-29 |title=Vermilion Energy Trust Closes Agreement to Acquire Working Interest in Corrib Field in Ireland |publisher=Earthtimes.org |access-date=2009-11-12}}</ref><ref name=rigzone1>{{Cite web|url=http://www.rigzone.com/news/article.asp?a_id=79013 |title=Irish Minister Marks Vermilion's Entry into Corrib Gas Devt |publisher=Rigzone |access-date=2009-11-12}}</ref>


Until 2018, Royal Dutch Shell was the operator of the project with a 45% ownership stake.<ref name=department>{{Cite web Until 2018, Royal Dutch Shell was the operator of the project with a 45% ownership stake.<ref name=department>{{Cite web
Line 83: Line 84:
|title = Corrib Gas Field Development |title = Corrib Gas Field Development
|publisher = Department of Communications, Energy and Natural Resources |publisher = Department of Communications, Energy and Natural Resources
|accessdate = 2010-08-08 |access-date = 2010-08-08
|archive-url = https://web.archive.org/web/20101024235316/http://www.dcenr.gov.ie/Natural/Petroleum+Affairs+Division/Corrib+Gas+Field+Development/ |archive-url = https://web.archive.org/web/20101024235316/http://www.dcenr.gov.ie/Natural/Petroleum+Affairs+Division/Corrib+Gas+Field+Development/
|archive-date = 24 October 2010 |archive-date = 24 October 2010
|url-status = dead |url-status = dead
}}</ref><ref name=rigzone1/> In 2018, Shell sold its share of the project to the ]. As part of the transaction, Vermilion Energy became the project's operator and expanded its ownership share to 20%.<ref>{{Cite web |last=Falconer |first=Kirk |url=https://www.pehub.com/shell-completes-1-3-bln-sale-of-corrib-gas-field-stake-to-cppib/ |title=Shell Completes $1.3 bln sale of Corrib gas field stake to CPPIB |publisher=PE Hub |date=3 December 2018 |access-date=1 January 2019}}</ref> In 2021, Vermilion acquired ]'s 36.5% stake for $434 million (€382 million), becoming the majority owner of the gas field.<ref>{{Cite web |url=https://www.oedigital.com/news/492431-equinor-exits-ireland-with-434m-sale-of-corrib-gas-field-stake-to-vermilion-energy |title=Equinor Exits Ireland with $434M Sale of Corrib Gas Field Stake to Vermilion Energy |publisher=Offshore Engineering |date=29 November 2021 |access-date=1 December 2021}}</ref>
|df = dmy-all
}}</ref><ref name=rigzone1/> In 2018, Shell sold its share of the project to the ]; as part of the transaction, Vermilion Energy became the project's operator and expanded its ownership share to 20%.<ref>{{Cite web |last=Falconer |first=Kirk |url=https://www.pehub.com/shell-completes-1-3-bln-sale-of-corrib-gas-field-stake-to-cppib/ |title=Shell Completes $1.3 bln sale of Corrib gas field stake to CPPIB |publisher=PE Hub |date=3 December 2018 |accessdate=1 January 2019}}</ref>


==Development== ==Development==
]
Royal Dutch Shell proposed to develop the Corrib field as a sub-sea production facility with onshore processing. This method of development is claimed by Shell to be in line with best industry practice for gas fields of this type. The project includes development of offshore operations including the wells and subsea facilities, construction of offshore and onshore pipelines, and construction of onshore processing plant at ].<ref name="SubseaIQ"/><ref name="hydrocarbons-technology.com"/> Royal Dutch Shell proposed to develop the Corrib field as a sub-sea production facility with onshore processing. The project included development of offshore installations, including the wells and subsea facilities, construction of offshore and onshore pipelines, and construction of onshore processing plant at ].<ref name="SubseaIQ"/><ref name="hydrocarbons-technology.com"/>


===Gas field=== ===Gas field===
The Corrib gas field is located about {{convert|83|km}} off ] in ] in an area known as the ] in water depths of {{convert|355|m}}.<ref name="hydrocarbons-technology.com"> The Corrib gas field is located about {{convert|83|km}} off ] in ], in an area known as the ] in water depths of {{convert|355|m}}.<ref name="hydrocarbons-technology.com">
{{Cite web {{Cite web
|url=http://www.hydrocarbons-technology.com/projects/shellcorribgasfield/ |url=http://www.hydrocarbons-technology.com/projects/shellcorribgasfield/
Line 100: Line 101:
|publisher=Net Resources International |publisher=Net Resources International
|work = Hydrocarbons Technology |work = Hydrocarbons Technology
|accessdate=2010-08-09}} |access-date=2010-08-09}}
</ref> The gas is originating from ] Sandstone reservoir {{convert|3000|m}} below the seabed.<ref name="SubseaIQ"/><ref name="hydrocarbons-technology.com"/> Reserves in the field are believed to be about {{convert|1|Tcuft}}, 70% the volume of the Kinsale field.<ref name="SubseaIQ"/> The natural gas in the Corrib Gas Field is a very pure form of gas, consisting of approximately 97% ] and ].<ref>{{Cite web |url=http://www.corribgaspipeline.com/index.php?page=what-s-in-the-gas |title=Gas Content |access-date=5 August 2009 |archive-url=https://web.archive.org/web/20160401211334/http://www.corribgaspipeline.com/index.php?page=what-s-in-the-gas |archive-date=1 April 2016 |url-status=dead |df=dmy-all }}</ref> The Corrib gas does not contain ] and ] makes up only 0.3% of the total amount of gas. </ref> Reserves in the field are believed to be about {{convert|1|Tcuft}}, 70% of the volume of the Kinsale field.<ref name="SubseaIQ"/> The gas originates from a ] Sandstone reservoir {{convert|3000|m}} below the seabed.<ref name="SubseaIQ"/><ref name="hydrocarbons-technology.com"/> The natural gas in the Corrib Gas Field is a very pure form of gas, consisting of approximately 97% ] and ].<ref>{{Cite web |url=http://www.corribgaspipeline.com/index.php?page=what-s-in-the-gas |title=Gas Content |access-date=5 August 2009 |archive-url=https://web.archive.org/web/20160401211334/http://www.corribgaspipeline.com/index.php?page=what-s-in-the-gas |archive-date=1 April 2016 |url-status=dead }}</ref> The Corrib gas does not contain ] and ] makes up only 0.3% of the total amount of gas.
<ref name="OnshorePipeline"> <ref name="OnshorePipeline">.
{{Cite web {{Cite web
|url = http://www.dcenr.gov.ie/NR/rdonlyres/B9AC68AF-2FF8-4F08-A78A-7A21EB1C3DB3/0/QRAVersionF.pdf |url = http://www.dcenr.gov.ie/NR/rdonlyres/B9AC68AF-2FF8-4F08-A78A-7A21EB1C3DB3/0/QRAVersionF.pdf
Line 108: Line 109:
|publisher = Department of Communications, Energy and Natural Resources |publisher = Department of Communications, Energy and Natural Resources
|work = Allseas Engineering BV |work = Allseas Engineering BV
|accessdate = 4 April 2014 |access-date = 4 April 2014
|url-status = dead |url-status = dead
|archiveurl = https://web.archive.org/web/20131013011945/http://www.dcenr.gov.ie/NR/rdonlyres/B9AC68AF-2FF8-4F08-A78A-7A21EB1C3DB3/0/QRAVersionF.pdf |archive-url = https://web.archive.org/web/20131013011945/http://www.dcenr.gov.ie/NR/rdonlyres/B9AC68AF-2FF8-4F08-A78A-7A21EB1C3DB3/0/QRAVersionF.pdf
|archivedate = 13 October 2013 |archive-date = 13 October 2013
|df = dmy-all
}} }}
</ref> </ref>
The subsea production system is delivered by ]. Production at the gas field will be remotely controlled from the Bellanaboy Bridge terminal. There are five production wells at the Corrib field drilled by ] Sedco 711 ] drilling rig. When in operation, each well is planned to have a so-called "christmas tree" structure above it that contains all control and monitoring equipment. Flexible individual flowlines will run from each well to a production manifold which will feed the gas into the main pipeline.<ref name="OnshorePipeline"/> There is no production platform installed in the field.<ref name="SubseaIQ"/> There are five production wells at the Corrib field, drilled by ] Sedco 711 ] drilling rig. Each well has a "christmas tree" structure above it that contains the control and monitoring equipment. This subsea production system was constructed by ], the offshore drilling and production supplier. Flexible individual flowlines will run from each well to a production manifold which will feed the gas into the main pipeline.<ref name="OnshorePipeline"/> There is no production platform installed in the field.<ref name="SubseaIQ"/> Production at the gas field is remotely controlled from the Bellanaboy Bridge terminal.

Corrib Gas is expected to run out in 2026 or 2027 as it's production peaked before 2020.<ref>{{Cite web|url=https://www.independent.ie/business/irish/europa-says-its-prospective-gas-field-located-off-mayo-coast-could-be-as-big-as-corrib/a1396396084.html|title=Europa says its prospective gas field located off Mayo coast could be as big as Corrib|date=3 October 2023|website=Irish Independent}}</ref>


===Pipeline=== ===Pipeline===
The pipeline from the Corrib field to the landfall at ] is planned to be approximately 90&nbsp;km in length.<ref name="hydrocarbons-technology.com"/> The pipeline has a diameter of {{convert|20|in}} and it will operate at pressures of {{convert|120|–|345|bar}}.<ref name="OnshorePipeline"/> Work on the offshore section occurred in summer 2009 and involved over 7,000&nbsp;lengths of pipe being welded together on board the ] pipelaying vessel.<ref name=times070609> The pipeline from the Corrib field to the landfall at ] is approximately 90&nbsp;km in length.<ref name="hydrocarbons-technology.com"/> The pipeline has a diameter of {{convert|20|in}} and it operates at pressures of {{convert|120|–|345|bar}}.<ref name="OnshorePipeline"/> Work on the offshore section took place in summer 2009 and involved over 7,000&nbsp;lengths of pipe being welded together on board the ] pipelaying vessel.<ref name=times070609>
{{Cite news {{Cite news
|title= Briefing: Corrib pipeline |title= Briefing: Corrib pipeline
Line 125: Line 127:
|newspaper=The Times |newspaper=The Times
|date=7 June 2009 |date=7 June 2009
|access-date=2010-08-09}}{{dead link|date=September 2024|bot=medic}}{{cbignore|bot=medic}}
|accessdate=2010-08-09}}
</ref><ref name=milestones> </ref><ref name=milestones>
{{Cite web {{Cite web
Line 131: Line 133:
|url= http://www.shell.ie/home/content/irl/aboutshell/shell_businesses/e_and_p/corrib/about/history/ |url= http://www.shell.ie/home/content/irl/aboutshell/shell_businesses/e_and_p/corrib/about/history/
|publisher= Shell E&P Ireland Ltd |publisher= Shell E&P Ireland Ltd
|accessdate= 2010-08-09 |access-date= 2010-08-09
}}{{dead link|date=August 2017 |bot=InternetArchiveBot |fix-attempted=yes }} }}{{dead link|date=August 2017 |bot=InternetArchiveBot |fix-attempted=yes }}
</ref> The onshore pipeline is still in the proposal phase but is expected to be some {{convert|9|km}} in length and run from landfall to the drying plant. </ref> The onshore pipeline is {{convert|9|km}} in length and runs from landfall to the processing plant.


===Processing plant=== ===Processing plant===
Gas will be processed at the processing plant {{convert|9|km}} inland near Bellanaboy Bridge. The purpose of the plant is to dry the gas and remove impurities. The plant has a capacity of 10&nbsp;million standard cubic metres of purified gas per day. Processed gas will be fed to the ] gas grid.<ref name="hydrocarbons-technology.com"/> Gas is processed at the processing plant inland, near Bellanaboy Bridge. The purpose of the plant is to dry the gas and remove impurities. The plant has a capacity of 10&nbsp;million standard cubic metres of purified gas per day. Processed gas is fed to the ] gas grid.<ref name="hydrocarbons-technology.com"/> The piping for the onshore processing plant was manufactured by Phoenix Pipes Limited in Slane, County Meath.

The piping for the Onshore Processing Plant is manufactured by Phoenix Pipes Limited in Slane, Co. Meath.


==Controversy== ==Controversy==
{{Main|Corrib gas controversy}} {{Main|Corrib gas controversy}}
] guard the Bellanaboy terminal site from occupation by protesters]] ] guard the Bellanaboy terminal site from occupation by protesters]]
Some opponents of the scheme cite concerns about the health, safety and environmental impact of the onshore aspects of the project. Others are concerned with alleged irregularities and precedents surrounding the project. Many groups, most notably the ] and ] campaigns, oppose the current plans for the project, which they regard as dangerous despite assurances from Shell. Some opponents of the scheme cited concerns about the health, safety and environmental impact of the onshore aspects of the project. Others were concerned with alleged irregularities and precedents surrounding the project. Many groups, most notably the ] and ] campaigns, opposed the current plans for the project, which they regarded as dangerous despite assurances from Shell.
<ref>http://www.vimeo.com/8668733</ref><ref>{{Dead link|date=November 2009}}</ref> A contrary position is taken by the group ].<ref>{{Cite web|url=http://www.mayonews.ie/index.php?option=com_content&task=view&id=2745&Itemid=38 |title=The Mayo News - Shell quarries vandalised |publisher=Mayonews.ie |date=13 November 2007 |accessdate=2009-11-12}}</ref> <ref>{{Cite web|url=http://www.vimeo.com/8668733|title = Pipe Down}}</ref><ref>{{Dead link|date=November 2009}}</ref> A contrary position is taken by the group ].<ref>{{Cite web|url=http://www.mayonews.ie/index.php?option=com_content&task=view&id=2745&Itemid=38 |title=The Mayo News Shell quarries vandalised |publisher=Mayonews.ie |date=13 November 2007 |access-date=2009-11-12}}</ref>


A film about the project, '']'' was released on 8 July 2010 at the Galway Film Festival.<ref> thepipethefilm.com</ref> A film about the project, '']'', was released on 8 July 2010 at the Galway Film Festival.<ref> thepipethefilm.com</ref>


===Safety and environmental concerns=== ===Safety and environmental concerns===


====Pipeline route==== ====Pipeline route====
The upstream high pressure gas pipeline that will connect the wells to the inland processing site is planned to run through the area of ], close to local residences. A report by Dr. Richard Kupriewicz concluded that "the terrain makes escape routes for the clustered population essentially impossible in the event of a rupture".<ref> {{webarchive |url=https://web.archive.org/web/20071120075511/http://www.village.ie/index2.php?option=com_content&do_pdf=1&id=2108 |date=20 November 2007 }}</ref> The upstream high pressure gas pipeline connecting the wells to the inland processing site runs through the area of ], close to local residences. A report by Dr. Richard Kupriewicz concluded that "the terrain makes escape routes for the clustered population essentially impossible in the event of a rupture".<ref> {{webarchive |url=https://web.archive.org/web/20071120075511/http://www.village.ie/index2.php?option=com_content&do_pdf=1&id=2108 |date=20 November 2007 }}</ref>


====Discharges from drying process==== ====Discharges from drying process====
] is the proposed area to discharge waste from the refining process<ref>{{Cite web|url=http://www.marinetimes.ie/Assets/_archive_2005/0105_news_06.html |title=Marine Times News |publisher=Marinetimes.ie |accessdate=2008-10-24 |url-status=dead |archiveurl=https://web.archive.org/web/20071220081251/http://www.marinetimes.ie/Assets/_archive_2005/0105_news_06.html |archivedate=20 December 2007 }}</ref> ] is the proposed area to discharge waste from the refining process<ref>{{Cite web|url=http://www.marinetimes.ie/Assets/_archive_2005/0105_news_06.html |title=Marine Times News |publisher=Marinetimes.ie |access-date=2008-10-24 |url-status=dead |archive-url=https://web.archive.org/web/20071220081251/http://www.marinetimes.ie/Assets/_archive_2005/0105_news_06.html |archive-date=20 December 2007 }}</ref>


===Planning problems=== ===Planning problems===
Planning permission was initially refused by the board of ] (the Irish planning authority). Senior planning inspector Kevin Moore’s report stated in part: "t is my submission that the proposed development of a large gas processing terminal at this rural, scenic, and unserviced area on a bogland hill some 8 kilometres inland from the Mayo coastland landfall location, with all its site development works difficulties, public safety concerns, adverse visual, ecological, and traffic impacts, and a range of other significant environmental impacts, defies any rational understanding of the term “sustainability”." In November 2009, An Bord Pleanála ordered Shell to redesign the pipeline and move its route away from homes saying it posed an "unacceptable risk".<ref>{{cite news|url=http://www.independent.ie/national-news/shell-is-ordered-to-reroute-risky-corrib-gas-pipeline-1932604.html|title=Shell is ordered to re-route 'risky' Corrib gas pipeline|date=4 November 2009|accessdate=2009-11-04}}</ref> Planning permission was initially refused by the board of ] (the Irish planning authority). Senior planning inspector Kevin Moore's report stated in part:
{{blockquote |It is my submission that the proposed development of a large gas processing terminal at this rural, scenic, and unserviced area on a bogland hill some 8 kilometres inland from the Mayo coastland landfall location, with all its site development works difficulties, public safety concerns, adverse visual, ecological, and traffic impacts, and a range of other significant environmental impacts, defies any rational understanding of the term "sustainability".}}
In November 2009, An Bord Pleanála ordered Shell to redesign the pipeline and move its route away from homes saying it posed an "unacceptable risk".<ref>{{cite news|url=http://www.independent.ie/national-news/shell-is-ordered-to-reroute-risky-corrib-gas-pipeline-1932604.html|title=Shell is ordered to re-route 'risky' Corrib gas pipeline|newspaper=]|date=4 November 2009|access-date=2009-11-04}}</ref>


==Tax== ==Tax==
Claims of a tax yield of some €1.7 billion over the life of the field have been made by the Irish government based on data about the field's size and 2008 gas prices.<ref>{{Cite web |url=http://www.dcenr.gov.ie/Press+Releases/2009/closing+of+the+Sale+of+Marathon%E2%80%99s+Corrib+Gas+Field+Shareholding.htm |title=Closing of the Sale of Marathon’s Corrib Gas Field Shareholding |publisher=Department of Communications, Energy and Natural Resources |date=6 August 2009 |accessdate=2010-09-23 |archive-url=https://web.archive.org/web/20110720001230/http://www.dcenr.gov.ie/Press+Releases/2009/closing+of+the+Sale+of+Marathon%E2%80%99s+Corrib+Gas+Field+Shareholding.htm |archive-date=20 July 2011 |url-status=dead |df=dmy-all }}</ref> Up to 2007, the Irish Petroleum Licensing Terms imposed a flat 25% income tax on gas production revenues. In August 2007, the top rate of tax on the most profitable fields was increased to 40%.<ref name="dcenr press release"> Claims of a tax yield of some €1.7 billion over the life of the field have been made by the Irish government, based on data about the field's size and 2008 gas prices.<ref>{{Cite web |url=http://www.dcenr.gov.ie/Press+Releases/2009/closing+of+the+Sale+of+Marathon%E2%80%99s+Corrib+Gas+Field+Shareholding.htm |title=Closing of the Sale of Marathon's Corrib Gas Field Shareholding |publisher=Department of Communications, Energy and Natural Resources |date=6 August 2009 |access-date=2010-09-23 |archive-url=https://web.archive.org/web/20110720001230/http://www.dcenr.gov.ie/Press+Releases/2009/closing+of+the+Sale+of+Marathon%E2%80%99s+Corrib+Gas+Field+Shareholding.htm |archive-date=20 July 2011 |url-status=dead }}</ref> Until 2007, the Irish Petroleum Licensing Terms imposed a flat 25% income tax on gas production revenues. In August 2007, the top rate of tax on the most profitable fields was increased to 40%.<ref name="dcenr press release">
{{Cite web |url=http://www.dcenr.gov.ie/Press+Releases/2007/Government+announces+new+round+of+licensing+for+oil+and+gas+exploration+under+new+licensing+terms.htm |title=Government announces new round of licensing for oil and gas exploration under new licensing terms |publisher=] |accessdate=2010-02-04 |last=Ryan |first=Eamon |work=Press Release |date=1 August 2007 |archive-url=https://web.archive.org/web/20110720000616/http://www.dcenr.gov.ie/Press+Releases/2007/Government+announces+new+round+of+licensing+for+oil+and+gas+exploration+under+new+licensing+terms.htm |archive-date=20 July 2011 |url-status=dead |df=dmy-all }} {{Cite web |url=http://www.dcenr.gov.ie/Press+Releases/2007/Government+announces+new+round+of+licensing+for+oil+and+gas+exploration+under+new+licensing+terms.htm |title=Government announces new round of licensing for oil and gas exploration under new licensing terms |publisher=] |access-date=2010-02-04 |last=Ryan |first=Eamon |work=Press Release |date=1 August 2007 |archive-url=https://web.archive.org/web/20110720000616/http://www.dcenr.gov.ie/Press+Releases/2007/Government+announces+new+round+of+licensing+for+oil+and+gas+exploration+under+new+licensing+terms.htm |archive-date=20 July 2011 |url-status=dead }}
</ref><ref>{{Cite web |url=http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib/security_supply/security_supply.html |title=Shell in Ireland |publisher=Shell.com |accessdate=2009-11-12 |url-status=dead |archiveurl=https://web.archive.org/web/20090905005302/http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib/security_supply/security_supply.html |archivedate=5 September 2009 |df=dmy-all }}</ref> </ref><ref>{{Cite web |url=http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib/security_supply/security_supply.html |title=Shell in Ireland |publisher=Shell.com |access-date=2009-11-12 |url-status=dead |archive-url=https://web.archive.org/web/20090905005302/http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib/security_supply/security_supply.html |archive-date=5 September 2009 }}</ref>
The new licensing terms called for changes to the tax imposed based upon fields ' profit ratios (equal to the ] less 25% divided by the accumulated level of capital investment). Where this ratio is greater than 4.5, an additional 15% tax was imposed, where it is between 3.0 and 4.5 an additional 10% was imposed and where the profit ratio is between 1.5 and 3.0, and additional 5% tax was added. Less profitable fields were not affected.<ref name="dcenr press release"/> The new licensing terms called for changes to the tax imposed based upon fields' profit ratios (equal to the ] less 25% divided by the accumulated level of capital investment). Where this ratio is greater than 4.5, an additional 15% tax was imposed, where it is between 3.0 and 4.5 an additional 10% was imposed and where the profit ratio is between 1.5 and 3.0, and additional 5% tax was added. Less profitable fields were not affected.<ref name="dcenr press release"/>


==Employment== ==Employment==
{{Update section|date=February 2020}} {{Update section|date=February 2020}}
The construction of the pipeline and plant was expected by Shell's economic consultants, Goodbody Economic Consultants, to create 800 temporary jobs <ref>{{Cite web |url=http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib/about/overview/overview.html |title=Shell in Ireland |publisher=Shell.com |accessdate=2009-11-12 |url-status=dead |archiveurl=https://web.archive.org/web/20091008185619/http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib/about/overview/overview.html |archivedate=8 October 2009 |df=dmy-all }}</ref> and boost the local Mayo economy by approximately €181 million. The plant was expected by Shell to employ approximately 55 workers when operational.<ref>{{Cite web |url=http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib |title=Shell in Ireland |publisher=Shell.com |date= |accessdate=2009-11-12 }}{{dead link|date=August 2017 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> The construction of the pipeline and plant was expected by Shell's economic consultants, Goodbody Economic Consultants, to create 800 temporary jobs<ref>{{Cite web |url=http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib/about/overview/overview.html |title=Shell in Ireland |publisher=Shell.com |access-date=2009-11-12 |url-status=dead |archive-url=https://web.archive.org/web/20091008185619/http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib/about/overview/overview.html |archive-date=8 October 2009 }}</ref> and boost the local Mayo economy by approximately €181 million. The plant was expected by Shell to employ approximately 55 workers when operational.<ref>{{Cite web |url=http://www.shell.com/home/content/ie-en/about_shell/shell_businesses/ep/corrib |title=Shell in Ireland |publisher=Shell.com |access-date=2009-11-12 }}{{dead link|date=August 2017 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>


==References== ==References==
{{Reflist}} {{Reflist}}

==Further reading==
* {{cite book |last1=Slevin |first1=Amanda |title=Gas, oil and the Irish state: Understanding the dynamics and conflicts of hydrocarbon management |date=2016 |publisher=Manchester University Press |isbn=978-1-5261-0096-2 |url=https://muse.jhu.edu/book/67316 |url-access=subscription |via=] |access-date=15 April 2020 |language=en}}


==External links== ==External links==
* *
* *
* *
* *
Line 182: Line 188:
* *
* *
* &mdash; ] news article on controversy * ] news article on controversy


{{Shell to Sea}} {{Shell to Sea}}
Line 193: Line 199:
] ]
] ]
] ]

Latest revision as of 12:47, 18 November 2024

Irish offshore natural gas field

Corrib gas field
Location of the Corrib gas field
CountryIreland
RegionSlyne Trough basin
Locationwest of the Mullet Peninsula, County Mayo
Block18/20; 18/25
Offshore/onshoreoffshore
OperatorVermilion Energy
PartnersVermilion Energy (56.5%)
Canada Pension Plan Investment Board (43.5%)
Field history
Discovery1996
Start of development2004
Start of production2015
Production
Estimated gas in place1,000×10^ cu ft (28×10^ m)
Recoverable gas594×10^ cu ft (16.8×10^ m)
Producing formationsTriassic Sandstones

The Corrib gas project (Irish: Tionscanamh Ghás Aiceanta na Coiribe) is a developed natural gas deposit located in the Atlantic Ocean, approximately 83 kilometres (52 mi) off the northwest coast of County Mayo, Ireland. The project includes a natural gas pipeline and an onshore gas processing plant, which commenced gas production in 2015. During its development, the project attracted considerable opposition.

The Corrib field is Ireland's only domestic source of natural gas production.

History

The deepwater exploration licence No. 2/93 covering four blocks in the Slyne Trough was granted on 1 January 1993 for a period of 11 years to Enterprise Oil and its partners Saga Petroleum Ireland Limited, Statoil Exploration (Ireland) Limited, and Marathon International Petroleum Hibernia Limited. The licence was issued under the licensing terms for offshore oil and gas exploration and development 1992. The Corrib natural gas field was discovered in 1996. It was the first reported commercial natural gas discovery in Ireland since the Kinsale Head gas field was discovered in 1971. The first appraisal well was drilled in 1997. A number of consents and approvals to develop the Corrib Project were issued in 2001.

In 2002, Enterprise Oil was acquired by Royal Dutch Shell who took over the operatorship of the project. Development of the project began in 2004, but it was delayed in 2005 when locals opposed the project. Shell announced the suspension of the project to facilitate further discussions with opposing parties. For a year, independent safety reviews were conducted to address various safety concerns in relation to the project.

In 1999, Saga Petroleum became a part of a Norsk Hydro and in 2007 a part of Statoil. In July 2009, Vermilion Energy acquired Marathon Oil's stake in the project.

Until 2018, Royal Dutch Shell was the operator of the project with a 45% ownership stake. In 2018, Shell sold its share of the project to the Canada Pension Plan Investment Board. As part of the transaction, Vermilion Energy became the project's operator and expanded its ownership share to 20%. In 2021, Vermilion acquired Equinor's 36.5% stake for $434 million (€382 million), becoming the majority owner of the gas field.

Development

Map of the Corrib Gas Offshore Pipeline

Royal Dutch Shell proposed to develop the Corrib field as a sub-sea production facility with onshore processing. The project included development of offshore installations, including the wells and subsea facilities, construction of offshore and onshore pipelines, and construction of onshore processing plant at Bellanaboy.

Gas field

The Corrib gas field is located about 83 kilometres (52 mi) off Erris Head in County Mayo, in an area known as the Slyne Trough in water depths of 355 metres (1,165 ft). Reserves in the field are believed to be about 1 trillion cubic feet (28×10^ m), 70% of the volume of the Kinsale field. The gas originates from a Triassic Sandstone reservoir 3,000 metres (9,800 ft) below the seabed. The natural gas in the Corrib Gas Field is a very pure form of gas, consisting of approximately 97% methane and ethane. The Corrib gas does not contain hydrogen sulfide and carbon dioxide makes up only 0.3% of the total amount of gas. There are five production wells at the Corrib field, drilled by Transocean Sedco 711 semi-submersible drilling rig. Each well has a "christmas tree" structure above it that contains the control and monitoring equipment. This subsea production system was constructed by Vetco, the offshore drilling and production supplier. Flexible individual flowlines will run from each well to a production manifold which will feed the gas into the main pipeline. There is no production platform installed in the field. Production at the gas field is remotely controlled from the Bellanaboy Bridge terminal.

Corrib Gas is expected to run out in 2026 or 2027 as it's production peaked before 2020.

Pipeline

The pipeline from the Corrib field to the landfall at Glengad is approximately 90 km in length. The pipeline has a diameter of 20 inches (510 mm) and it operates at pressures of 120–345 bars (12,000–34,500 kPa). Work on the offshore section took place in summer 2009 and involved over 7,000 lengths of pipe being welded together on board the Solitaire pipelaying vessel. The onshore pipeline is 9 kilometres (5.6 mi) in length and runs from landfall to the processing plant.

Processing plant

Gas is processed at the processing plant inland, near Bellanaboy Bridge. The purpose of the plant is to dry the gas and remove impurities. The plant has a capacity of 10 million standard cubic metres of purified gas per day. Processed gas is fed to the Bord Gáis gas grid. The piping for the onshore processing plant was manufactured by Phoenix Pipes Limited in Slane, County Meath.

Controversy

Main article: Corrib gas controversy
Gardaí guard the Bellanaboy terminal site from occupation by protesters

Some opponents of the scheme cited concerns about the health, safety and environmental impact of the onshore aspects of the project. Others were concerned with alleged irregularities and precedents surrounding the project. Many groups, most notably the Rossport Five and Shell to Sea campaigns, opposed the current plans for the project, which they regarded as dangerous despite assurances from Shell. A contrary position is taken by the group Pro Gas Mayo.

A film about the project, The Pipe, was released on 8 July 2010 at the Galway Film Festival.

Safety and environmental concerns

Pipeline route

The upstream high pressure gas pipeline connecting the wells to the inland processing site runs through the area of Rossport, close to local residences. A report by Dr. Richard Kupriewicz concluded that "the terrain makes escape routes for the clustered population essentially impossible in the event of a rupture".

Discharges from drying process

Broadhaven Bay is the proposed area to discharge waste from the refining process

Planning problems

Planning permission was initially refused by the board of An Bord Pleanála (the Irish planning authority). Senior planning inspector Kevin Moore's report stated in part:

It is my submission that the proposed development of a large gas processing terminal at this rural, scenic, and unserviced area on a bogland hill some 8 kilometres inland from the Mayo coastland landfall location, with all its site development works difficulties, public safety concerns, adverse visual, ecological, and traffic impacts, and a range of other significant environmental impacts, defies any rational understanding of the term "sustainability".

In November 2009, An Bord Pleanála ordered Shell to redesign the pipeline and move its route away from homes saying it posed an "unacceptable risk".

Tax

Claims of a tax yield of some €1.7 billion over the life of the field have been made by the Irish government, based on data about the field's size and 2008 gas prices. Until 2007, the Irish Petroleum Licensing Terms imposed a flat 25% income tax on gas production revenues. In August 2007, the top rate of tax on the most profitable fields was increased to 40%. The new licensing terms called for changes to the tax imposed based upon fields' profit ratios (equal to the rate of profit less 25% divided by the accumulated level of capital investment). Where this ratio is greater than 4.5, an additional 15% tax was imposed, where it is between 3.0 and 4.5 an additional 10% was imposed and where the profit ratio is between 1.5 and 3.0, and additional 5% tax was added. Less profitable fields were not affected.

Employment

This section needs to be updated. Please help update this article to reflect recent events or newly available information. (February 2020)

The construction of the pipeline and plant was expected by Shell's economic consultants, Goodbody Economic Consultants, to create 800 temporary jobs and boost the local Mayo economy by approximately €181 million. The plant was expected by Shell to employ approximately 55 workers when operational.

References

  1. Murtagh, Peter (30 December 2015). "Natural gas begins flowing from controversial Corrib field". The Irish Times. Retrieved 1 January 2020.
  2. "Ireland | Vermilion Energy". vermilionenergy.com.
  3. "Written Answers – Offshore Exploration". 509. Dáil Éireann. 20 October 1999. Archived from the original on 7 June 2011. Retrieved 12 November 2009. {{cite journal}}: Cite journal requires |journal= (help)
  4. "Ireland Offshore Potential". Irish Offshore Operators Association. Archived from the original on 7 April 2014. Retrieved 3 April 2014.
  5. "Irish Natural Gas Market". Archived from the original on 19 January 2012. Retrieved 3 April 2014.
  6. ^ "Corrib". SubseaIQ. Bishop Interactive. Archived from the original on 16 July 2011. Retrieved 9 August 2010.
  7. ^ "Corrib Gas Field Development". Department of Communications, Energy and Natural Resources. Archived from the original on 24 October 2010. Retrieved 8 August 2010.
  8. The Earthtimes. "Vermilion Energy Trust Closes Agreement to Acquire Working Interest in Corrib Field in Ireland". Earthtimes.org. Archived from the original on 29 July 2012. Retrieved 12 November 2009.
  9. ^ "Irish Minister Marks Vermilion's Entry into Corrib Gas Devt". Rigzone. Retrieved 12 November 2009.
  10. Falconer, Kirk (3 December 2018). "Shell Completes $1.3 bln sale of Corrib gas field stake to CPPIB". PE Hub. Retrieved 1 January 2019.
  11. "Equinor Exits Ireland with $434M Sale of Corrib Gas Field Stake to Vermilion Energy". Offshore Engineering. 29 November 2021. Retrieved 1 December 2021.
  12. ^ "Shell Corrib Gas Field". Hydrocarbons Technology. Net Resources International. Retrieved 9 August 2010.
  13. "Gas Content". Archived from the original on 1 April 2016. Retrieved 5 August 2009.
  14. ^ . "ONSHORE PIPELINE QUANTIFIED RISK ASSESSMENT" (PDF). Allseas Engineering BV. Department of Communications, Energy and Natural Resources. Archived from the original (PDF) on 13 October 2013. Retrieved 4 April 2014.
  15. "Europa says its prospective gas field located off Mayo coast could be as big as Corrib". Irish Independent. 3 October 2023.
  16. Burns, John (7 June 2009). "Briefing: Corrib pipeline". The Times. Retrieved 9 August 2010.
  17. "Key Milestones of the Corrib gas project". Shell E&P Ireland Ltd. Retrieved 9 August 2010.
  18. "Pipe Down".
  19. "The Mayo News – Shell quarries vandalised". Mayonews.ie. 13 November 2007. Retrieved 12 November 2009.
  20. The Pipe thepipethefilm.com
  21. Archived 20 November 2007 at the Wayback Machine
  22. "Marine Times News". Marinetimes.ie. Archived from the original on 20 December 2007. Retrieved 24 October 2008.
  23. "Shell is ordered to re-route 'risky' Corrib gas pipeline". Irish Independent. 4 November 2009. Retrieved 4 November 2009.
  24. "Closing of the Sale of Marathon's Corrib Gas Field Shareholding". Department of Communications, Energy and Natural Resources. 6 August 2009. Archived from the original on 20 July 2011. Retrieved 23 September 2010.
  25. ^ Ryan, Eamon (1 August 2007). "Government announces new round of licensing for oil and gas exploration under new licensing terms". Press Release. Department of Communications, Energy and Natural Resources. Archived from the original on 20 July 2011. Retrieved 4 February 2010.
  26. "Shell in Ireland". Shell.com. Archived from the original on 5 September 2009. Retrieved 12 November 2009.
  27. "Shell in Ireland". Shell.com. Archived from the original on 8 October 2009. Retrieved 12 November 2009.
  28. "Shell in Ireland". Shell.com. Retrieved 12 November 2009.

Further reading

External links

Shell to Sea
People
Media
  • Once Upon a Time in the West – The Corrib Gas Controversy
  • The Pipe
Related
Shell plc
Divisions and
subsidiaries
Current
Former
Joint ventures
Current
Former
Brands
Facilities
and places
Controversies
People
Related topics

Categories: