Revision as of 02:24, 15 August 2020 editTastyPoutine (talk | contribs)Extended confirmed users21,289 editsmNo edit summary← Previous edit | Latest revision as of 05:12, 6 December 2024 edit undoInternetArchiveBot (talk | contribs)Bots, Pending changes reviewers5,380,202 edits Rescuing 1 sources and tagging 0 as dead.) #IABot (v2.0.9.5) (Pancho507 - 22020 | ||
(22 intermediate revisions by 15 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Railroad line in Ohio, U.S.}} | |||
⚫ | The '''Cincinnati District''' is a ] line owned by the ] and operated by Cincinnati Eastern Railroad in the ] of ].<ref>http://cinrail.com/</ref> The line runs from ] southeast to ] along a former ] line. Its southeast end is at the ] near ], while |
||
{{Cleanup bare URLs|date=August 2022}} | |||
⚫ | The '''Cincinnati District''' is a ] line owned by the ] and operated by Cincinnati Eastern Railroad in the ] of ].<ref>{{Cite web|url=http://cinrail.com/|title=Cincinnati Eastern Railroad}}</ref> The line runs from ], southeast to ], along a former ] line. Its southeast end is at the ] near ], while its northwest end is in ], where it meets the ]'s ] and ]'s ]. | ||
{{Use mdy dates|date=April 2017}} | {{Use mdy dates|date=April 2017}} | ||
Line 5: | Line 7: | ||
|name = Cincinnati District | |name = Cincinnati District | ||
|type = ] | |type = ] | ||
|status = Active (Clare Yard to ]<br> Inactive (] to Vera Junction) | |status = Active (Clare Yard to ]<br /> Inactive (] to Vera Junction) | ||
|locale = ] | |locale = ] | ||
|start = ] in ] | |start = ] in ] | ||
Line 11: | Line 13: | ||
|routes = | |routes = | ||
|daily_ridership = | |daily_ridership = | ||
|open = |
|open = {{start date and age|1876|p=y}}<br />to present | ||
|owner = ] | |owner = ] | ||
|operator = Cincinnati, Batavia and Williamsburg Railroad (1876–1887)<br>Ohio and Northwestern Railroad (1887–1890)<br>Cincinnati, Portsmouth and Virginia Railroad (1891–1901)<br>] (1901–1982)<br>] (1982–2014)<br>] (2014–present) | |operator = Cincinnati, Batavia and Williamsburg Railroad (1876–1887)<br />Ohio and Northwestern Railroad (1887–1890)<br />Cincinnati, Portsmouth and Virginia Railroad (1891–1901)<br />] (1901–1982)<br />] (1982–2014)<br />] (2014–present) | ||
|stock = | |stock = | ||
|linelength = {{convert|96.20|mi|km|1|abbr=on}} | |linelength = {{convert|96.20|mi|km|1|abbr=on}} | ||
|tracklength = | |tracklength = | ||
|tracks = 1 <br>]s: 12 (8 active) | |tracks = 1 <br />]s: 12 (8 active) | ||
|gauge = Current: {{RailGauge|4ft8.5in|allk=on}}<br> |
|gauge = Current: {{RailGauge|4ft8.5in|allk=on}}<br />Original: {{RailGauge|3ft|lk=on}}}} | ||
==Pre-1900 History== | ==Pre-1900 History== | ||
Connecting the cities of ] and ], the '''Cincinnati, Batavia & Williamsburg Railway''' (CB&W) was chartered on January 11, 1876.<ref>Hilton, George Woodman. |
Connecting the cities of ] and ], the '''Cincinnati, Batavia & Williamsburg Railway''' (CB&W) was chartered on January 11, 1876.<ref name="auto">Hilton, George Woodman. "Cincinnati & Eastern Railway." American Narrow Gauge Railroads. Stanford: Stanford University Press, 1990. 464-465.</ref> The name was changed to the '''Cincinnati & Eastern Railroad''' (C&E) and the eastern terminus was changed to ] by May. The main reason behind building the C&E is that it was projected to become a primary coal-hauling route from the ] coalfields. Construction began almost immediately on the C&E and by October 18, 1876, the route was open for {{convert|15|mi}} between Batavia Junction and ].<ref>Stewart, Ken. "The Cincinnati & Eastern Railway and The Cincinnati, New Richmond & Ohio River Railroad." The Fractured Frog 2.10 (May 1985): 11-13. Newsletter of the Queen City Division Railroad Enthusiasts.</ref> By August 4, 1877, the line had reached ], a distance of {{convert|48|mi}}. The C&E opened {{convert|5|mi|spell=in}} of a branch towards ] from the Cincinnati, Georgetown & Portsmouth Railway at Richmond Junction to Tobasco on March 1, 1878.<ref>"Lebanon's Railroad." pg. 15-28. 4b. "The Little Giant." pg. 48-66.</ref> | ||
A 5 |
A {{convert|5.5|mi|adj=on}} western extension of the C&E to the Miami Valley Railroad (MV) was completed in June.<ref>Hauck, John W. Narrow Gauge in Ohio: The Cincinnati, Lebanon & Northern Railway. Boulder: Pruett Publishing Company, 1986</ref> The MV had proposed a narrow-gauge connection to Cincinnati via a tunnel through the Deer Creek valley, but after the Deer Creek tunnel project ran into financial difficulties, the C&E found that its connection to ] was useless thereby forcing the carrier to enter into bankruptcy on January 27, 1879.<ref name="auto"/> Nonetheless, the New Richmond branch was extended to ] by early 1880 and to ] on March 1, a distance of {{convert|14|mi}}. Excited by the prospects of connecting the C&E with the vast coal reserves of the southern part of the state, shareholders voted to increase the capital stock from $500,000 to $2 million and authorized a bond issue to finish the railroad from Winchester to Portsmouth, and to then build an extension to ] on November 21, 1880.<ref name="auto"/> | ||
The C&E exited receivership on March 1, 1881.<ref |
The C&E exited receivership on March 1, 1881.<ref name="auto"/> In February 1882, the railroad signed an agreement with the Cincinnati Northern to use {{convert|3.8|mi}} of its line between ] and Court Street via the Deer Creek valley to provide the C&E with a direct connection to its Court Street depot in downtown Cincinnati. The C&E began operations with daily runs to ], ], and ] from Court Street on April 4, 1882. The C&E mainline had been finished to ] by the close of the year, to ] by May 1883, and to the Scioto Valley Railway at Vera Junction just north of ] in August 1884, which included the erection of a 1,000-foot crossing of the ].<ref>"Corporate Timeline of the Norfolk & Western Railway." Norfolk & Western Historical Society. 14 Dec. 2008 Article.</ref> The high expense of the bridge and building an alignment through the Scioto Brush Creek valley caused the C&E to enter bankruptcy again on September 14. | ||
The C&E began preparation to convert its route from narrow-gauge to standard-gauge shortly after the completion of its railroad to Portsmouth. |
The C&E began preparation to convert its route from narrow-gauge to standard-gauge shortly after the completion of its railroad to Portsmouth.<ref name="auto"/> However, by February 1885, its finances had not improved and another receiver was appointed for the railroad. The C&E east of Winchester to Vera Junction had been converted to ] by May, but no money had been appropriated for ] cars. A court authorized receiver approved the expenditure of $180,000 to convert the line west of Winchester to standard gauge, but the collapse of the 800-foot Nineveh trestle on the ] branch on August 8 scuttled those plans. The disaster greatly aggravated the railroad's financial issues and another receiver was appointed who felt it was necessary to reconvert the ] from Winchester to ] back to ] in order for the line to generate a profit. | ||
By early 1886, the C&E was once again ]. The railroad was sold to a representative of the Cincinnati, Hamilton & Dayton (CH&D) on September 1, however, it defaulted on payments and the railroad was resold on January 5, 1887, to H.B. Morehead who formed the '''Ohio & Northwestern Railroad (O&NW)'''. Separately, the New Richmond branch was sold to William P. DeVou on September 1, 1886, who reorganized it as the Cincinnati, New Richmond & Ohio River Railroad (CNR&OR). DeVou planned to extend the CNR&OR east to ] but the line had ceased operations by July 1889. | By early 1886, the C&E was once again ]. The railroad was sold to a representative of the Cincinnati, Hamilton & Dayton (CH&D) on September 1, however, it defaulted on payments and the railroad was resold on January 5, 1887, to H.B. Morehead who formed the '''Ohio & Northwestern Railroad (O&NW)'''. Separately, the New Richmond branch was sold to William P. DeVou on September 1, 1886, who reorganized it as the Cincinnati, New Richmond & Ohio River Railroad (CNR&OR). DeVou planned to extend the CNR&OR east to ] but the line had ceased operations by July 1889. | ||
The O&NW moved immediately to ] the ex-C&E mainline between Cincinnati to Portsmouth which was completed by November 1887. |
The O&NW moved immediately to ] the ex-C&E mainline between Cincinnati to Portsmouth which was completed by November 1887.<ref>Ohio Railway Report. Annual Report of the Commissioner of Railroads and Telegraphs:Part II: History of the Railroads of Ohio. Comp. J. C. Morris. 1902. Transportation History Sources. 14 Dec. 2008</ref> The O&NW then shifted its western terminus from the Cincinnati Northern depot to the Little Miami Railroad depot. Like its predecessors, the O&NW became insolvent and went into receivership on June 15, 1888.<ref name="auto"/> Under receivership, the O&NW completed {{convert|5|mi|spell=in}} of its long-awaited Gallipolis extension between Portsmouth and Sciotoville in February 1889.<ref name="auto"/> The O&NW was sold on March 13, 1890, and reorganized as the '''Cincinnati, Portsmouth & Virginia Railroad''' (CP&V) on June 24, 1891.The ] merged with the CP&V in October 1901, and the ] to ] segment becoming the N&W Cincinnati Division with the nickname of the Peavine.<ref>name=], 26 Val. Rep. 255: Valuation Docket No. 343, Norfolk and Western Railway Company (1929)</ref> | ||
==Subsequent History to Current Day== | ==Subsequent History to Current Day== | ||
The Scioto River crossing at Vera Junction was replaced with new multi-span truss bridges fabricated by the American Bridge Company in 1913. The mainline between was realigned in 1947 when a quarry opened along Plum Run required the line to be rerouted, which included the erection of a new trestle above Cedar Fork and the laying of several miles of new track. The quarry became the primary source of ballast for the ] and added a significant amount of traffic to the Portsmouth Branch until the mid-1980s. Because of the Portsmouth |
The Scioto River crossing at Vera Junction was replaced with new multi-span truss bridges fabricated by the American Bridge Company in 1913. The mainline between was realigned in 1947 when a quarry opened along Plum Run required the line to be rerouted, which included the erection of a new trestle above Cedar Fork and the laying of several miles (km) of new track. The quarry became the primary source of ballast for the ] and added a significant amount of traffic to the Portsmouth Branch until the mid-1980s. Because of the Portsmouth Branch's sharp curves, steep grades, and a lack of customers, ] ] the Peavine between ] and Vera Junction in 2003.<ref>Corporate Timeline of the Norfolk & Western Railway." Norfolk & Western Historical Society. 14 Dec. 2008</ref> On March 21, 2014, the CCET, a subsidiary of ] operating under the trade name '''Cincinnati East Terminal Railway''' (CCET)<ref>https://www.govinfo.gov/content/pkg/GOVPUB-RR-f1fd7e3e997d88a4d967b4bb8963723e/pdf/GOVPUB-RR-f1fd7e3e997d88a4d967b4bb8963723e.pdf {{Bare URL PDF|date=March 2022}}</ref> filed with the Surface Transportation Board (STB) to lease and operate the Portsmouth Branch between Clare (Mariemont) and Williamsburg. CCET took over operations on April 27. | ||
In late 2016, the CCET filed with the STB to lease and operate more of the Portsmouth Branch between Williamsburg and Plum Run east of Peebles for the storage of cars. The railroad filed with the STB to extend the lease with the goal of restarting railroad operations at the Plum Run quarry.<ref>Re: Docket No. FD 36370. |
In late 2016, the CCET renamed itself the '''Cincinnati Eastern Railroad''' and filed with the STB to lease and operate more of the Portsmouth Branch between Williamsburg and Plum Run east of Peebles for the storage of cars. The railroad filed with the STB to extend the lease with the goal of restarting railroad operations at the Plum Run quarry in 2019.<ref>Re: Docket No. FD 36370." Received by Cynthia T. Brown, 10 Dec. 2019.</ref> | ||
== Further reading == | == Further reading == | ||
* at Abandoned | * at Abandoned | ||
* at Western Ohio Railway | * {{Webarchive|url=https://web.archive.org/web/20200728022714/http://league-office.com/wo/peavine/realpeavine-about.asp?usn=0/ |date=July 28, 2020 }} at Western Ohio Railway | ||
* at Cincinnati Eastern Railroad | * at Cincinnati Eastern Railroad | ||
==References== | ==References== | ||
{{reflist}} | {{reflist}} |
Latest revision as of 05:12, 6 December 2024
Railroad line in Ohio, U.S.This article uses bare URLs, which are uninformative and vulnerable to link rot. Please consider converting them to full citations to ensure the article remains verifiable and maintains a consistent citation style. Several templates and tools are available to assist in formatting, such as reFill (documentation) and Citation bot (documentation). (August 2022) (Learn how and when to remove this message) |
The Cincinnati District is a railroad line owned by the Norfolk Southern Railway and operated by Cincinnati Eastern Railroad in the U.S. state of Ohio. The line runs from Cincinnati, Ohio, southeast to Portsmouth, Ohio, along a former Norfolk and Western Railway line. Its southeast end is at the Columbus District near Portsmouth, while its northwest end is in Mariemont, Ohio, where it meets the Indiana and Ohio Railway's Midland Subdivision and Norfolk Southern's Dayton District.
Cincinnati District | |
---|---|
Overview | |
Status | Active (Clare Yard to Peebles) Inactive (Peebles to Vera Junction) |
Owner | Norfolk Southern |
Locale | Southern Ohio |
Termini | |
Service | |
Type | Freight rail |
Operator(s) | Cincinnati, Batavia and Williamsburg Railroad (1876–1887) Ohio and Northwestern Railroad (1887–1890) Cincinnati, Portsmouth and Virginia Railroad (1891–1901) Norfolk and Western Railway (1901–1982) Norfolk Southern Railway (1982–2014) Cincinnati Eastern Railroad (2014–present) |
History | |
Opened | 1876 (148 years ago) (1876) to present |
Technical | |
Line length | 96.20 mi (154.8 km) |
Number of tracks | 1 passing sidings: 12 (8 active) |
Track gauge | Current: 4 ft 8+1⁄2 in (1,435 mm) standard gauge Original: 3 ft (914 mm) |
Pre-1900 History
Connecting the cities of Cincinnati and Williamsburg, the Cincinnati, Batavia & Williamsburg Railway (CB&W) was chartered on January 11, 1876. The name was changed to the Cincinnati & Eastern Railroad (C&E) and the eastern terminus was changed to Portsmouth by May. The main reason behind building the C&E is that it was projected to become a primary coal-hauling route from the Jackson County coalfields. Construction began almost immediately on the C&E and by October 18, 1876, the route was open for 15 miles (24 km) between Batavia Junction and Batavia. By August 4, 1877, the line had reached Winchester, a distance of 48 miles (77 km). The C&E opened five miles (8.0 km) of a branch towards New Richmond from the Cincinnati, Georgetown & Portsmouth Railway at Richmond Junction to Tobasco on March 1, 1878.
A 5.5-mile (8.9 km) western extension of the C&E to the Miami Valley Railroad (MV) was completed in June. The MV had proposed a narrow-gauge connection to Cincinnati via a tunnel through the Deer Creek valley, but after the Deer Creek tunnel project ran into financial difficulties, the C&E found that its connection to Cincinnati was useless thereby forcing the carrier to enter into bankruptcy on January 27, 1879. Nonetheless, the New Richmond branch was extended to Blairsville by early 1880 and to New Richmond on March 1, a distance of 14 miles (23 km). Excited by the prospects of connecting the C&E with the vast coal reserves of the southern part of the state, shareholders voted to increase the capital stock from $500,000 to $2 million and authorized a bond issue to finish the railroad from Winchester to Portsmouth, and to then build an extension to Gallipolis on November 21, 1880.
The C&E exited receivership on March 1, 1881. In February 1882, the railroad signed an agreement with the Cincinnati Northern to use 3.8 miles (6.1 km) of its line between Idlewild and Court Street via the Deer Creek valley to provide the C&E with a direct connection to its Court Street depot in downtown Cincinnati. The C&E began operations with daily runs to Irvington, Winchester, and New Richmond from Court Street on April 4, 1882. The C&E mainline had been finished to Peebles by the close of the year, to Rarden by May 1883, and to the Scioto Valley Railway at Vera Junction just north of Portsmouth in August 1884, which included the erection of a 1,000-foot crossing of the Scioto River. The high expense of the bridge and building an alignment through the Scioto Brush Creek valley caused the C&E to enter bankruptcy again on September 14.
The C&E began preparation to convert its route from narrow-gauge to standard-gauge shortly after the completion of its railroad to Portsmouth. However, by February 1885, its finances had not improved and another receiver was appointed for the railroad. The C&E east of Winchester to Vera Junction had been converted to standard gauge by May, but no money had been appropriated for standard gauge cars. A court authorized receiver approved the expenditure of $180,000 to convert the line west of Winchester to standard gauge, but the collapse of the 800-foot Nineveh trestle on the New Richmond branch on August 8 scuttled those plans. The disaster greatly aggravated the railroad's financial issues and another receiver was appointed who felt it was necessary to reconvert the standard gauge from Winchester to Portsmouth back to narrow gauge in order for the line to generate a profit.
By early 1886, the C&E was once again narrow gauge. The railroad was sold to a representative of the Cincinnati, Hamilton & Dayton (CH&D) on September 1, however, it defaulted on payments and the railroad was resold on January 5, 1887, to H.B. Morehead who formed the Ohio & Northwestern Railroad (O&NW). Separately, the New Richmond branch was sold to William P. DeVou on September 1, 1886, who reorganized it as the Cincinnati, New Richmond & Ohio River Railroad (CNR&OR). DeVou planned to extend the CNR&OR east to Aberdeen but the line had ceased operations by July 1889.
The O&NW moved immediately to standard gauge the ex-C&E mainline between Cincinnati to Portsmouth which was completed by November 1887. The O&NW then shifted its western terminus from the Cincinnati Northern depot to the Little Miami Railroad depot. Like its predecessors, the O&NW became insolvent and went into receivership on June 15, 1888. Under receivership, the O&NW completed five miles (8.0 km) of its long-awaited Gallipolis extension between Portsmouth and Sciotoville in February 1889. The O&NW was sold on March 13, 1890, and reorganized as the Cincinnati, Portsmouth & Virginia Railroad (CP&V) on June 24, 1891.The Norfolk and Western Railway merged with the CP&V in October 1901, and the Cincinnati to Portsmouth segment becoming the N&W Cincinnati Division with the nickname of the Peavine.
Subsequent History to Current Day
The Scioto River crossing at Vera Junction was replaced with new multi-span truss bridges fabricated by the American Bridge Company in 1913. The mainline between was realigned in 1947 when a quarry opened along Plum Run required the line to be rerouted, which included the erection of a new trestle above Cedar Fork and the laying of several miles (km) of new track. The quarry became the primary source of ballast for the N&W and added a significant amount of traffic to the Portsmouth Branch until the mid-1980s. Because of the Portsmouth Branch's sharp curves, steep grades, and a lack of customers, Norfolk Southern railbanked the Peavine between Peebles and Vera Junction in 2003. On March 21, 2014, the CCET, a subsidiary of Frontier Rail operating under the trade name Cincinnati East Terminal Railway (CCET) filed with the Surface Transportation Board (STB) to lease and operate the Portsmouth Branch between Clare (Mariemont) and Williamsburg. CCET took over operations on April 27.
In late 2016, the CCET renamed itself the Cincinnati Eastern Railroad and filed with the STB to lease and operate more of the Portsmouth Branch between Williamsburg and Plum Run east of Peebles for the storage of cars. The railroad filed with the STB to extend the lease with the goal of restarting railroad operations at the Plum Run quarry in 2019.
Further reading
- Cincinnati & Eastern Railway at Abandoned
- ABOUT THE REAL PEAVINE Archived July 28, 2020, at the Wayback Machine at Western Ohio Railway
- Cincinnati Eastern Railroad at Cincinnati Eastern Railroad
References
- "Cincinnati Eastern Railroad".
- ^ Hilton, George Woodman. "Cincinnati & Eastern Railway." American Narrow Gauge Railroads. Stanford: Stanford University Press, 1990. 464-465.
- Stewart, Ken. "The Cincinnati & Eastern Railway and The Cincinnati, New Richmond & Ohio River Railroad." The Fractured Frog 2.10 (May 1985): 11-13. Newsletter of the Queen City Division Railroad Enthusiasts.
- "Lebanon's Railroad." pg. 15-28. 4b. "The Little Giant." pg. 48-66.
- Hauck, John W. Narrow Gauge in Ohio: The Cincinnati, Lebanon & Northern Railway. Boulder: Pruett Publishing Company, 1986
- "Corporate Timeline of the Norfolk & Western Railway." Norfolk & Western Historical Society. 14 Dec. 2008 Article.
- Ohio Railway Report. Annual Report of the Commissioner of Railroads and Telegraphs:Part II: History of the Railroads of Ohio. Comp. J. C. Morris. 1902. Transportation History Sources. 14 Dec. 2008
- name=Interstate Commerce Commission, 26 Val. Rep. 255: Valuation Docket No. 343, Norfolk and Western Railway Company (1929)
- Corporate Timeline of the Norfolk & Western Railway." Norfolk & Western Historical Society. 14 Dec. 2008
- https://www.govinfo.gov/content/pkg/GOVPUB-RR-f1fd7e3e997d88a4d967b4bb8963723e/pdf/GOVPUB-RR-f1fd7e3e997d88a4d967b4bb8963723e.pdf
- Re: Docket No. FD 36370." Received by Cynthia T. Brown, 10 Dec. 2019.