Misplaced Pages

Rail transport in Uruguay: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editContent deleted Content addedVisualWikitext
Revision as of 20:51, 16 December 2017 editCertes (talk | contribs)Extended confirmed users243,571 editsm Disambiguated: Salto GrandeSalto, Uruguay← Previous edit Latest revision as of 21:33, 8 December 2024 edit undoOvenschotel (talk | contribs)116 edits Updated mapTags: Mobile edit Mobile web edit 
(25 intermediate revisions by 21 users not shown)
Line 1: Line 1:
{{Short description|none}} <!-- "none" is a legitimate description when the title is already adequate; see ] -->
{{Expand Spanish|Ferrocarril en Uruguay|date=November 2022}}
{{Infobox rail network {{Infobox rail network
|name = Uruguay |name = Uruguay
Line 42: Line 44:
|lowelevation = |lowelevation =
|lowelat = |lowelat =
|map = ] |map = ]
|mapcaption = Uruguay's railway network in 2019. The light red lines are both passenger and freight services; the crimson lines are only available for freight services; the grey lines are out-of-service lines; the black points are open stations; the grey points are out-of-service stations.
|mapcaption = Uruguay's railway network in 2010
}} }}


The '''Uruguayan railway network''' has approximately {{convert|2900|km|0|comma=off|abbr=on}} of lines, all of {{RailGauge|1435mm}} gauge, ] traction with only {{convert|11|km|0|comma=off|abbr=on}} of double track. Only half of the network is currently active. All the Uruguayan lines start from ], connecting the cities of ], ], Rivera and Río Branco. The rest of the lines (closed) connected the capital city with ], Cuareim, Artigas, Km. 329, Melo, La Paloma and ]. The '''Uruguayan railway network''' has about {{convert|2900|km|0|comma=off|abbr=on}} of lines, all of {{RailGauge|1435mm}} gauge, ] traction with only {{convert|11|km|0|comma=off|abbr=on}} of double track. Only half of the network is currently active. All the Uruguayan lines start from ], connecting the cities of ], ], ] and ]. The rest of the lines (closed) connected the capital city with ], ], ], Km. 329, ], ] and ].


==History== ==History==
===Beginning=== ===Beginning===
] ]
The work of building the first railway line in Uruguay began on April 25, 1867, with the opening of a branch between Paso del Molino and Cerro which consisted of a horse-drawn train. The national "Ferrocarril Central" had obtained the concession for the laying of tracks to ], 205 km from ]. However, for more than a decade they had submitted projects to no avail. The first {{convert|18|km}} branch between Bella Vista and ], was inaugurated on 1 January 1869. The work of building the first railway line in Uruguay began on April 25, 1867, with the opening of a branch between Paso del Molino and Cerro which consisted of a horse-drawn train. The national "Ferrocarril Central" had obtained the concession for the laying of tracks to ], 205&nbsp;km from ]. However, for more than a decade they had submitted projects to no avail. The first {{convert|18|km}} branch between Bella Vista and ], was inaugurated on 1 January 1869.


To continue the extension of the line and due to lack of capital in the country, many loans were contracted in ], where, as a control, a directory was established. Due to financial problems and high costs of the national administration, the British acquired the majority stake. The ], the largest ] company operating in the country, was formally born on 1 January 1878. By this time, several companies had appeared, such as the ]. Although they were started by national capitals, they ended under British control as they were unable to find capital in the country to complete the works.<ref name=benoit> by Marcelo Benoit, 15 Sep 2009</ref> To continue the extension of the line and due to lack of capital in the country, many loans were contracted in ], where, as a control, a directory was established. Due to financial problems and high costs of the national administration, the British acquired the majority stake. The ], the largest ] company operating in the country, was formally born on 1 January 1878. By this time, several companies had appeared, such as the ]. Although they were started by national capitals, they ended under British control as they were unable to find capital in the country to complete the works.<ref name=benoit> by Marcelo Benoit, 15 Sep 2009</ref>
Line 57: Line 59:
=== Expansion === === Expansion ===
] was opened in 1897]] ] was opened in 1897]]
In 1884 the Government promulgated the "Ley de Trazado General de Ferrocarriles" (Railways General Routes Law) that designed and regulated the railway network in the country. That plan established a radial system, where all the lines joined in ], the main port of Uruguay by then. Concessions were granted to British companies for a period of 25 years. After that term of explotaition, the State was responsible for expropriating the railway lines if case of non-compliance by the concessionaries. In 1884 the Government promulgated the "Ley de Trazado General de Ferrocarriles" (Railways General Routes Law) that designed and regulated the railway network in the country. That plan established a radial system, where all the lines joined in ], the main port of Uruguay by then. Concessions were granted to British companies for a period of 25 years. After that term of exploitation, the State was responsible for expropriating the railway lines if case of non-compliance by the concessionaries.


Lines were assigned to the following companies:{{cn|date=July 2017}} Lines were assigned to the following companies:{{citation needed|date=July 2017}}
* Ferrocarril Central del Uruguay (Montevideo–Rivera with branches to Salto and Paysandú) * Ferrocarril Central del Uruguay (Montevideo–Rivera with branches to Salto and Paysandú)
* Ferrocarril de Montevideo a ] through Barra de Santa Lucia and Rosario * Ferrocarril de Montevideo a ] through Barra de Santa Lucia and Rosario
Line 77: Line 79:


=== Narrow gauge === === Narrow gauge ===
There were four big ] lines in Uruguay:{{cn|date=July 2017}} There were four big ] lines in Uruguay:{{citation needed|date=July 2017}}
*Puerto del Sauce (now Juan Lacaze) - Terminal: {{RailGauge|3ft|lk=on}}, (1901–1959) *Puerto del Sauce (now Juan Lacaze) Terminal: {{RailGauge|3ft|lk=on}}, (1901–1959)
*] - ]: {{RailGauge|750mm|lk=on}} (1903–1958) *] ]: {{RailGauge|750mm|lk=on}} (1903–1958)
*km 393-Arrozal 33: {{RailGauge|600mm|lk=on}} *km 393-Arrozal 33: {{RailGauge|600mm|lk=on}}
*km 110 - Cantera Burgueño: {{RailGauge|600mm}}. *km 110 Cantera Burgueño: {{RailGauge|600mm}}.


==Passenger services== ==Passenger services==
The Tacuarembó-Rivera rail line in northern Uruguay is currently the only section in Uruguay where passenger trains are in operation.
Regular passenger services are operated between ] and ] (63&nbsp;km) since August 26, 1993 (previously all regular passenger services were withdrawn on January 2, 1988). One daily train was extended to ] (96&nbsp;km from Montevideo) on January 15, 2007, and other was extended from Veinticinco de Agosto to ] (109&nbsp;km from Montevideo) on January 2, 2008. Another line, which operates between Montevideo and Estacion Ingeniero Victor Sudriers in ], was reopened on December 15, 2005 (44&nbsp;km).
]


== Renovation plans== == Renovation plans==
{{outdated|date=November 2022}}
The state railway administration ] has announced that starting January, 2010, 377&nbsp;km of track will be renewed on the Pintado - ] railway of the central main line. The contract for the repair of railways covers in particular the section from Pintado (]) and Chamberlain (]) based on the change of ], and from there to Rivera on the border with Brazil, part of the international branch located along the border with the city of ], in ], ] using rail supplied by Russia given in lieu of a debt and wooden ties imported from Paraguay. The programme will cost US$30m.<ref>{{cite web | url=http://www.railwaygazette.com/news/single-view/view//pointers-february-2009.html| work=]|title=Pointers February 2009 | date=2010-10-29}}</ref><ref>{{cite web | url=http://www.forestalweb.com/Noticias-nacionales/ayer-se-iniciaron-las-obras-en-la-linea-ferrea-pintado-rivera/|title=Ayer se iniciaron las obras en la línea férrea Pintado-Rivera | date=2010-10-30}} (in Spanish)</ref>
]
The state railway administration ] has announced that starting January, 2010, 377&nbsp;km of track will be renewed on the Pintado ] railway of the central main line. The contract for the repair of railways covers in particular the section from Pintado (]) and Chamberlain (]) based on the change of ], and from there to Rivera on the border with Brazil, part of the international branch located along the border with the city of ], in ], ] using rail supplied by Russia given in lieu of a debt and wooden ties imported from Paraguay. The programme will cost US$30m.<ref>{{cite web | url=http://www.railwaygazette.com/news/single-view/view//pointers-february-2009.html| work=]|title=Pointers February 2009 | date=2010-10-29}}</ref><ref>{{cite web | url=http://www.forestalweb.com/Noticias-nacionales/ayer-se-iniciaron-las-obras-en-la-linea-ferrea-pintado-rivera/|title=Ayer se iniciaron las obras en la línea férrea Pintado-Rivera | date=2010-10-30}} (in Spanish)</ref>


==International links== ==International links==
* {{Flagicon|Argentina}} ] - {{RailGauge|sg}} freight rail connection over the ]. ] was reinaugurated on this line on August 29, 2011,<ref name="yt_inaug">{{Cite video|url=https://www.youtube.com/watch?v=KENOVWVJC8o|title=Tren Argentina - Uruguay 29/08/2011|language=Spanish|accessdate=2011-10-29}}</ref><ref name="yt_ad">{{cite video|url=https://www.youtube.com/watch?v=CfzXd-h-4zQ|title=Nuevo Servicio ferroviario Argentina - Uruguay. El Tren de los Pueblos Libres - Spot Publicitario|accessdate=2011-10-29}}</ref> using second-hand ] ''Wadloper'' trains; it closed again on May 2012.{{fact|date=February 2016}} * {{Flagicon|Argentina}} ] {{RailGauge|sg}} freight rail connection over the ]. ] was reinaugurated on this line on August 29, 2011,<ref name="yt_inaug">{{Cite video|url=https://www.youtube.com/watch?v=KENOVWVJC8o |archive-url=https://ghostarchive.org/varchive/youtube/20211221/KENOVWVJC8o |archive-date=2021-12-21 |url-status=live|title=Tren Argentina Uruguay 29/08/2011|language=Spanish|accessdate=2011-10-29}}{{cbignore}}</ref><ref name="yt_ad">{{cite video|url=https://www.youtube.com/watch?v=CfzXd-h-4zQ|title=Nuevo Servicio ferroviario Argentina Uruguay. El Tren de los Pueblos Libres Spot Publicitario|accessdate=2011-10-29}}{{cbignore}}{{Dead Youtube links|date=February 2022}}</ref> using second-hand ] ''Wadloper'' trains; it closed again in May 2012.<ref>{{Cite web|url=https://10tv.com.ar/nota/1009472/dejo-de-circular-el-tren-de-los-pueblos-libres|title=Dejó de circular el "Tren de los Pueblos Libres"|website=10tv.com.ar}}</ref>
* {{Flagicon|Brazil}} ] - ], {{RailGauge|1435mm}} gauge (Uruguay) / {{RailGauge|1000mm|lk=on}} gauge (], Brazil). * {{Flagicon|Brazil}} ] ], {{RailGauge|1435mm}} gauge (Uruguay) / {{RailGauge|1000mm|lk=on}} gauge (], Brazil).


== See also == == See also ==
Line 105: Line 108:
{{commons category|Rail transport in Uruguay}} {{commons category|Rail transport in Uruguay}}


*{{citation |url=http://railwaywondersoftheworld.com/trains-uruguay.html |chapter=The trains of Uruguay |title=Railway Wonders of the World |year=1936 |pages=1251–1255 |editor-first=Clarence |editor-last=Winchester }} illustrated description of the development of railways in Uruguay *{{citation |chapter-url=http://railwaywondersoftheworld.com/trains-uruguay.html |chapter=The trains of Uruguay |title=Railway Wonders of the World |year=1936 |pages=1251–1255 |editor-first=Clarence |editor-last=Winchester }} illustrated description of the development of railways in Uruguay


{{South America in topic|Rail transport in}} {{South America in topic|Rail transport in}}
Line 111: Line 114:


] ]

]

Latest revision as of 21:33, 8 December 2024

You can help expand this article with text translated from the corresponding article in Spanish. (November 2022) Click for important translation instructions.
  • View a machine-translated version of the Spanish article.
  • Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Misplaced Pages.
  • Consider adding a topic to this template: there are already 1,149 articles in the main category, and specifying|topic= will aid in categorization.
  • Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
  • You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Spanish Misplaced Pages article at ]; see its history for attribution.
  • You may also add the template {{Translated|es|Ferrocarril en Uruguay}} to the talk page.
  • For more guidance, see Misplaced Pages:Translation.
Uruguay
Operation
National railwayAFE
System length
Total2835 km (1762 mi)
Track gauge
1,435 mm (4 ft 8+1⁄2 in)2835 km (1762 mi)
Map
Uruguay's railway network in 2019. The light red lines are both passenger and freight services; the crimson lines are only available for freight services; the grey lines are out-of-service lines; the black points are open stations; the grey points are out-of-service stations.

The Uruguayan railway network has about 2900 km (1802 mi) of lines, all of 1,435 mm (4 ft 8+1⁄2 in) gauge, diesel traction with only 11 km (7 mi) of double track. Only half of the network is currently active. All the Uruguayan lines start from Montevideo, connecting the cities of Paysandú, Salto, Rivera and Río Branco. The rest of the lines (closed) connected the capital city with Fray Bentos, Cuareim, Artigas, Km. 329, Melo, La Paloma and Colonia del Sacramento.

History

Beginning

Managers and technical staff of the Central Uruguay Railway (CUR) at Peñarol station, c. 1900

The work of building the first railway line in Uruguay began on April 25, 1867, with the opening of a branch between Paso del Molino and Cerro which consisted of a horse-drawn train. The national "Ferrocarril Central" had obtained the concession for the laying of tracks to Durazno, 205 km from Montevideo. However, for more than a decade they had submitted projects to no avail. The first 18 kilometres (11 mi) branch between Bella Vista and Las Piedras, was inaugurated on 1 January 1869.

To continue the extension of the line and due to lack of capital in the country, many loans were contracted in London, where, as a control, a directory was established. Due to financial problems and high costs of the national administration, the British acquired the majority stake. The Central Uruguay Railway, the largest British company operating in the country, was formally born on 1 January 1878. By this time, several companies had appeared, such as the Midland Uruguay Railway. Although they were started by national capitals, they ended under British control as they were unable to find capital in the country to complete the works.

Expansion

the Estación Central General Artigas was opened in 1897

In 1884 the Government promulgated the "Ley de Trazado General de Ferrocarriles" (Railways General Routes Law) that designed and regulated the railway network in the country. That plan established a radial system, where all the lines joined in Montevideo, the main port of Uruguay by then. Concessions were granted to British companies for a period of 25 years. After that term of exploitation, the State was responsible for expropriating the railway lines if case of non-compliance by the concessionaries.

Lines were assigned to the following companies:

  • Ferrocarril Central del Uruguay (Montevideo–Rivera with branches to Salto and Paysandú)
  • Ferrocarril de Montevideo a Colonia through Barra de Santa Lucia and Rosario
  • Ferrocarril del Oeste (25 de Agosto to Carmelo and Nueva Palmira via San José and branch to Mercedes)
  • Ferrocarril Nordeste (Montevideo–Artigas (today Río Branco) via San Ramón and Melo, with branch to Minas
  • Ferrocarril Uruguayo del Este (Montevideo–Laguna Merim via Pando, Maldonado, San Carlos and Rocha)
  • Ferrocarril de Salto a Santa Rosa (today Cuareim), with branch to San Eugenio (today Artigas)

State intervention

In 1915 the Government of Uruguay took over the Montevideo–Santiago Vázquez line, then making a similar procedure with other two broken lines. Therefore, the "Administración de Ferrocarriles y Tranvías del Estado" (FTE) was created. That State-owned company continued the expansion of the national railway network, although most of the projects were not carried out. The state services arrived in Montevideo running on Central Railway tracks. The government also built roads to compete with the British companies still operating in the country.

Nationalization

Main article: State Railways Administration of Uruguay
Canadian General Electric Locomotive C-18. The picture was taken during the renovation of existing level crossing at the San Martin Avenue in the city of Tacuarembó

Following what was then a worldwide trend, the private companies were nationalised in 1948, the parliament approved the projects for the acquisition of foreign railroads, charging and part of the debt of 17 million pounds that the United Kingdom had with Uruguay because of purchases made during the Second World War.

Narrow gauge

There were four big narrow gauge railway lines in Uruguay:

  • Puerto del Sauce (now Juan Lacaze) – Terminal: 3 ft (914 mm), (1901–1959)
  • PiriápolisPan de Azucar: 750 mm (2 ft 5+1⁄2 in) (1903–1958)
  • km 393-Arrozal 33: 600 mm (1 ft 11+5⁄8 in)
  • km 110 – Cantera Burgueño: 600 mm (1 ft 11+5⁄8 in).

Passenger services

The Tacuarembó-Rivera rail line in northern Uruguay is currently the only section in Uruguay where passenger trains are in operation.

Renovation plans

This article needs to be updated. Please help update this article to reflect recent events or newly available information. (November 2022)
Renovation work on the Pintado – Rivera line

The state railway administration AFE has announced that starting January, 2010, 377 km of track will be renewed on the Pintado – Rivera railway of the central main line. The contract for the repair of railways covers in particular the section from Pintado (Florida) and Chamberlain (Tacuarembó) based on the change of wooden ties, and from there to Rivera on the border with Brazil, part of the international branch located along the border with the city of Santana do Livramento, in Rio Grande do Sul, Brazil using rail supplied by Russia given in lieu of a debt and wooden ties imported from Paraguay. The programme will cost US$30m.

International links

See also

References

  1. Ferrocarriles del Uruguay by Marcelo Benoit, 15 Sep 2009
  2. "Pointers February 2009". Railway Gazette International. 2010-10-29.
  3. "Ayer se iniciaron las obras en la línea férrea Pintado-Rivera". 2010-10-30. (in Spanish)
  4. Tren Argentina – Uruguay 29/08/2011 (in Spanish). Archived from the original on 2021-12-21. Retrieved 2011-10-29.
  5. Nuevo Servicio ferroviario Argentina – Uruguay. El Tren de los Pueblos Libres – Spot Publicitario. Retrieved 2011-10-29.
  6. "Dejó de circular el "Tren de los Pueblos Libres"". 10tv.com.ar.

External links

  • Winchester, Clarence, ed. (1936), "The trains of Uruguay", Railway Wonders of the World, pp. 1251–1255 illustrated description of the development of railways in Uruguay
Rail transport in South America
Sovereign states
Dependencies and
other territories
Uruguay articles
History
Geography
Politics
Legal system
Legal issues
Military
Economy
Society
Culture
Category: