Misplaced Pages

Dalanzadgad New Wastewater Treatment Plant: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editContent deleted Content addedVisualWikitext
Revision as of 06:30, 17 December 2024 editChongkian (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users373,754 edits typo← Previous edit Latest revision as of 07:15, 17 December 2024 edit undoChongkian (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users373,754 edits add background history 
(4 intermediate revisions by the same user not shown)
Line 70: Line 70:
| floor_area = | floor_area =
| elevator_count = | elevator_count =
| grounds_area = | grounds_area = 1.8 hectares
| architect = | architect =
| architecture_firm = | architecture_firm =
Line 99: Line 99:
}} }}


The '''Darkhan New Wastewater Treatment Plant''' ({{langx|mn|Даланзадгад хотын шинэ цэвэрлэх байгууламж}}) is a ] in ], ], ]. The '''Dalanzadgad New Wastewater Treatment Plant''' ({{langx|mn|Даланзадгад хотын шинэ цэвэрлэх байгууламж}}) is a ] in ], ], ].


==History== ==History==
The groundbreaking ceremony for the construction of the plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.<ref name="O., Onon, 4 January 2018">{{cite news|last=O.|first=Onon|date=4 January 2018|url=https://www.montsame.mn/en/read/132980|title=Construction of Wastewater Treatment Plant in Dalanzadgad begins|work=Mongolian National News Agency|access-date=17 December 2024}}</ref> Due to the overcapacity of the ], a new treatment plant should be constructed. The groundbreaking ceremony for the construction of the new plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.<ref name="O., Onon, 4 January 2018">{{cite news|last=O.|first=Onon|date=4 January 2018|url=https://www.montsame.mn/en/read/132980|title=Construction of Wastewater Treatment Plant in Dalanzadgad begins|work=Mongolian National News Agency|access-date=17 December 2024}}</ref>

==Architecture==
The plant stands at a total ground area of 1.8 hectares.<ref>{{cite news|last=D.|first=Mishigsuren|date=13 June 2018|url=https://montsame.mn/mn/read/92697|title=Даланзадгадад шинэ цэвэрлэх байгууламж барьж байна|work=Mongolian National News Agency|trans-title=A New Wastewater Treatment Plant is being Built in Dalanzadgad|language=mn|access-date=17 December 2024}}</ref>


==Technical specifications== ==Technical specifications==
The plant has a water processing capacity of 3,000 m<sup>2</sup> per day.<ref name="O., Onon, 4 January 2018"/> The plant has a water processing capacity of 3,000 m<sup>2</sup> per day.<ref name="O., Onon, 4 January 2018"/><ref>{{cite news|date=12 May 2019|url=https://news.mn/r/2132599/|title=Даланзадгад сумын шинэ цэвэрлэх байгууламж намар ашиглалтад орно|work=News.mn|trans-title=New Wastewater Treatment Plant in Dalanzadgad Sum to be Commissioned in Autumn|language=mn|access-date=17 December 2024}}</ref>


==Finance== ==Finance==
Line 120: Line 123:
] ]
] ]
] ]
]





Latest revision as of 07:15, 17 December 2024

Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia

Dalanzadgad New Wastewater Treatment Plant
Даланзадгад хотын шинэ цэвэрлэх байгууламж
General information
Typewastewater treatment plant
Town or cityDalanzadgad, Ömnögovi
CountryMongolia
Coordinates43°36′50.1″N 104°29′00.7″E / 43.613917°N 104.483528°E / 43.613917; 104.483528
Groundbreaking4 January 2018
OpenedJune 2020
CostUS$21.17 million
Grounds1.8 hectares
Design and construction
Main contractorN A.B, S&A Trade, San and Baiguulamj

The Dalanzadgad New Wastewater Treatment Plant (Mongolian: Даланзадгад хотын шинэ цэвэрлэх байгууламж) is a wastewater treatment in Dalanzadgad, Ömnögovi Province, Mongolia.

History

Due to the overcapacity of the existing old treatment plant, a new treatment plant should be constructed. The groundbreaking ceremony for the construction of the new plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.

Architecture

The plant stands at a total ground area of 1.8 hectares.

Technical specifications

The plant has a water processing capacity of 3,000 m per day.

Finance

The plant was constructed with a cost of US$21.17 million. About 92% of the funding was provided by a loan from Asian Development Bank and the remaining 8% was provided by the Government of Mongolia.

See also

References

  1. ^ O., Onon (4 January 2018). "Construction of Wastewater Treatment Plant in Dalanzadgad begins". Mongolian National News Agency. Retrieved 17 December 2024.
  2. D., Mishigsuren (13 June 2018). "Даланзадгадад шинэ цэвэрлэх байгууламж барьж байна" [A New Wastewater Treatment Plant is being Built in Dalanzadgad]. Mongolian National News Agency (in Mongolian). Retrieved 17 December 2024.
  3. "Даланзадгад сумын шинэ цэвэрлэх байгууламж намар ашиглалтад орно" [New Wastewater Treatment Plant in Dalanzadgad Sum to be Commissioned in Autumn]. News.mn (in Mongolian). 12 May 2019. Retrieved 17 December 2024.


Stub icon

This article about a building or structure in Mongolia is a stub. You can help Misplaced Pages by expanding it.

Categories: