Misplaced Pages

Sepulveda Transit Corridor: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editContent deleted Content addedVisualWikitext
Revision as of 17:03, 31 January 2024 editSteelersDiclonious (talk | contribs)Extended confirmed users1,926 editsm Pre-Development← Previous edit Latest revision as of 06:18, 18 December 2024 edit undoDracaenaGuianensis (talk | contribs)496 edits refactor: move polls and opinions from project dev section 
(31 intermediate revisions by 13 users not shown)
Line 1: Line 1:
{{Short description|Proposed transit corridor}} {{Short description|Proposed transit corridor in Los Angeles, California}}
{{Use mdy dates|date=August 2023}} {{Use American English|date=July 2024}}
{{Use mdy dates|date=July 2024}}
{{Infobox rail line {{Infobox rail line
|name = {{LACMTA link logo}} Sepulveda Transit Corridor Project   |name = {{LACMTA link logo}} Sepulveda Transit Corridor
|type = ] or ]
|logo = |logo =
|logo_width = |logo_width =
Line 10: Line 10:
|caption = Sepulveda Pass and ], as seen from the ] in 2008 |caption = Sepulveda Pass and ], as seen from the ] in 2008
|locale = ] <br /> ] |locale = ] <br /> ]
|type = ] or ]
|system = ] |system = ]
|status = Planned |status = Planned
|map = {{Sepulveda Transit Corridor}} |map = {{Sepulveda Transit Corridor|inline=yes}}
|map_state = collapsed |map_state = collapsed
|planopen = 2033–2035 |planopen = 2033–2035
}} }}


The '''Sepulveda Transit Corridor Project''' is a two-phased planned transit corridor project that aims to connect the ] to the ] through ] in ], ], by supplementing the existing ] freeway through the pass. The corridor would partly parallel I-405, and proposed alternatives include heavy rail ] (a subway) or a ] line connecting the ] in the Valley to the ] and ] on the ], and the ] near ].<ref name=released>{{cite news|url=https://thesource.metro.net/2018/06/07/rail-concepts-released-for-sepulveda-transit-corridor/ |title=Rail concepts released for Sepulveda Transit Corridor project|publisher=Metro}}</ref> The '''Sepulveda Transit Corridor''' is a two-phased planned transit corridor in ], ]. Its first phase aims to connect the ] to the ] through the ]. A second phase would further extend the line southwards to connect with ]. The corridor is intended to relieve the heavily congested I-405 freeway through Sepulveda Pass and provide a fast public transit option on this North-South link. Proposed alternatives include heavy rail ] (a subway) or a ] line connecting the ] in the Valley to the ] and ] on the ], and the ] near ].<ref name=released>{{cite news|url=https://thesource.metro.net/2018/06/07/rail-concepts-released-for-sepulveda-transit-corridor/ |title=Rail concepts released for Sepulveda Transit Corridor project|publisher=Metro}}</ref> As of December 2024, the project is in the ] phase of planning and construction is expected to be funded via a combination of local ] revenue and applications to federal grants. Pending these two requirements, the first phase is projected to open in 2033-2035.


== Current traffic situation ==
I-405 over Sepulveda Pass between ] and ], which the proposed transit line will run parallel to, is the busiest highway corridor in the United States, serving 379,000 vehicles per day.<ref>{{cite web|title=I-405 In LA Named Busiest Interstate In Any U.S. City|url=http://losangeles.cbslocal.com/2013/08/20/i-405-in-la-named-busiest-interstate-in-any-us-city/|website=CBS Los Angeles|date=August 20, 2013 |publisher=CBS Broadcasting Inc.|access-date=7 July 2017}}</ref>


The proposed transit line will traverse the Sepulveda Pass largely parallel to the existing ] freeway, which connects ] to its North in the ] with ] to its South in the ]. I-405 is the busiest highway corridor in the United States, serving 379,000 vehicles per day.<ref>{{cite web|title=I-405 In LA Named Busiest Interstate In Any U.S. City|url=http://losangeles.cbslocal.com/2013/08/20/i-405-in-la-named-busiest-interstate-in-any-us-city/|website=CBS Los Angeles|date=August 20, 2013 |publisher=CBS Broadcasting Inc.|access-date=7 July 2017}}</ref> A five-year construction project to widen the I-405 at the cost of $1.6 billion was completed in 2014, but its impact on reducing congestion remains disputed.<ref name="nyt i-405 worth it?">{{cite news |last1=Nagourney |first1=Adam |title=Los Angeles Drivers on the 405 Ask: Was $1.6 Billion Worth It? |url=https://www.nytimes.com/2016/12/20/us/los-angeles-drivers-on-the-405-ask-was-1-6-billion-worth-it.html |access-date=16 December 2024 |work=New York Times |date=20 December 2016 |archive-url=https://web.archive.org/web/20161222042142/https://www.nytimes.com/2016/12/20/us/los-angeles-drivers-on-the-405-ask-was-1-6-billion-worth-it.html |archive-date=22 December 2016}}</ref>
Currently, LA Metro services the Sepulveda Pass corridor (which is essentially phase 1 of the Sepulveda Transit corridor) with bus Route 761, which uses ] to traverse Sepulveda Pass. Its southern terminus is ] on the E Line, and connects to the G Line at its ] and Amtrak and Metrolink at their ], before terminating at ]. It takes about an hour to connect the E and G Lines.<ref>{{Cite web |title=Maps & Schedules |url=https://www.metro.net/riding/schedules/ |access-date=2023-08-21 |website=LA Metro |language=en-US}}</ref> Route 233 serves Sepulveda Pass at night.<ref>{{Cite web |title=Maps & Schedules |url=https://www.metro.net/riding/schedules/ |access-date=2023-08-21 |website=LA Metro |language=en-US}}</ref>


Currently, what is essentially phase 1 of the project is being serviced by LA Metro with bus Route 761, which uses ] to traverse the Sepulveda Pass. Its southern terminus is ] on the E Line, and connects to the G Line at its ] and Amtrak and Metrolink at their ], before terminating at ]. It takes about an hour to connect the E and G Lines.<ref>{{Cite web |title=Maps & Schedules |url=https://www.metro.net/riding/schedules/ |access-date=2023-08-21 |website=LA Metro |language=en-US}}</ref> Route 233 serves Sepulveda Pass at night.<ref>{{Cite web |title=Maps & Schedules |url=https://www.metro.net/riding/schedules/ |access-date=2023-08-21 |website=LA Metro |language=en-US}}</ref>
What is currently designated as phase 2 of the project is served by ] lines 6 and Rapid 6 via ], with the latter only operating weekdays. The lines' northern terminus is the ] Gateway Plaza (Westwood/Strathmore) Both lines 6 and Rapid 6 meet the aforementioned ] in ] at the Westwood Blvd/Weyburn Ave intersection and at the 761's southern terminus, the Metro E Line's ]. The southern terminus is the ] C line station. As such, the lines indirectly serve ], requiring a transfer to a free shuttle bus that serves the station and LAX terminals. They will be rerouted to the ] station once it is open,<ref>{{Cite web |title=About LAX/Metro Transit Center Station – Metro K Line |url=https://kline.metro.net/about-transit-center/ |access-date=2024-01-18 |language=en-US}}</ref> as the station will feature bus bays and direct connections to the LAX terminals by way of the ].<ref>{{Cite web |title=LAX/Metro Transit Center Station |url=https://www.metro.net/projects/airport-metro-connector/ |access-date=17 January 2024 |website=Metro}}</ref> Rapid 6 is unique in that it has traffic intersection signal priority in the City of Los Angeles,<ref>{{Cite web |title=Line 6 - Sepulveda Blvd |url=https://www.culvercitybus.com/Bus-Schedules/Line-6-Sepulveda-Blvd |access-date=2024-01-18 |website=www.culvercitybus.com |language=en-US}}</ref> whereas most agencies do not have signal priority outside of their base city. Line 6 completes its run as scheduled in 1 hour 4 minutes with average traffic while the Rapid 6 completes its run with 15 minute headways in 54 minutes as scheduled with average traffic.


What is currently designated as phase 2 of the project is served by ] lines 6 and Rapid 6 via ], with the latter only operating weekdays. The lines' northern terminus is the ] Gateway Plaza (Westwood/Strathmore). Both lines 6 and Rapid 6 meet the aforementioned ] in ] at the Westwood Blvd/Weyburn Ave intersection and at the 761's southern terminus, the Metro E Line's ]. The southern terminus is the ] C line station. As such, the lines indirectly serve ], requiring a transfer to a free shuttle bus that serves the station and LAX terminals. They will be rerouted to the ] station once it is open,<ref>{{Cite web |title=About LAX/Metro Transit Center Station – Metro K Line |url=https://kline.metro.net/about-transit-center/ |access-date=2024-01-18 |language=en-US}}</ref> as the station will feature bus bays and direct connections to the LAX terminals by way of the ].<ref>{{Cite web |title=LAX/Metro Transit Center Station |url=https://www.metro.net/projects/airport-metro-connector/ |access-date=17 January 2024 |website=Metro}}</ref> Rapid 6 is unique in that it has traffic intersection signal priority in the City of Los Angeles,<ref>{{Cite web |title=Line 6 - Sepulveda Blvd |url=https://www.culvercitybus.com/Bus-Schedules/Line-6-Sepulveda-Blvd |access-date=2024-01-18 |website=www.culvercitybus.com |language=en-US}}</ref> whereas most agencies do not have signal priority outside of their base city. Line 6 completes its run as scheduled in 1 hour 4 minutes with average traffic while the Rapid 6 completes its run with 15 minute headways in 54 minutes as scheduled with average traffic.
Total transit time from the Aviation/LAX C Line station to the Van Nuys G Line Station with the aforementioned bus service is about 2 hours plus transfer time. The completion of both phases of this project is estimated to return a total transit time through the whole line of about 45 minutes.

Total transit time from the Aviation/LAX C Line station to the Van Nuys G Line Station with the current bus service is about 2 hours plus transfer time. The completion of both phases of this project is estimated to reduce total transit time through the whole line to about 45 minutes.

== History ==


==Overview==
] ]

The line is a long-established goal in Los Angeles transit planning. ], which imposed a half-cent sales tax in ] to fund a regional transit system, was passed in 1980, and a Sepulveda Pass line was in the project map that was part of the proposition's documentation. The line is a long-established goal in Los Angeles transit planning. ], which imposed a half-cent sales tax in ] to fund a regional transit system, was passed in 1980, and a Sepulveda Pass line was in the project map that was part of the proposition's documentation.


Line 50: Line 55:
The feasibility study for both phases was completed and presented in November 2019,<ref>http://media.metro.net/projects_studies/sfv-405/images/Feasibility%20Report.pdf {{Bare URL PDF|date=March 2022}}</ref> with no significant refinement from the July 2019 presentation. The study said that additional research was needed on whether the project would need to relocate or maneuver around a nine-foot wide ] water pipe called the "Sepulveda Feeder."<ref>{{cite web | url=https://www.clui.org/newsletter/summer-1997/metropolitan-water-districts-sepulveda-canyon-facility | title=The Center for Land Use Interpretation }}</ref> Additional studies were also called for on general station locations, tunnel design configuration, rider transfer patterns, and the identification of costs and cost reductions. The study also called for more information to be gathered on the impact of the Santa Monica Fault near Santa Monica Boulevard. The Metro Board then commenced the ] and ] scoping process. The feasibility study for both phases was completed and presented in November 2019,<ref>http://media.metro.net/projects_studies/sfv-405/images/Feasibility%20Report.pdf {{Bare URL PDF|date=March 2022}}</ref> with no significant refinement from the July 2019 presentation. The study said that additional research was needed on whether the project would need to relocate or maneuver around a nine-foot wide ] water pipe called the "Sepulveda Feeder."<ref>{{cite web | url=https://www.clui.org/newsletter/summer-1997/metropolitan-water-districts-sepulveda-canyon-facility | title=The Center for Land Use Interpretation }}</ref> Additional studies were also called for on general station locations, tunnel design configuration, rider transfer patterns, and the identification of costs and cost reductions. The study also called for more information to be gathered on the impact of the Santa Monica Fault near Santa Monica Boulevard. The Metro Board then commenced the ] and ] scoping process.


Two engineering firms were chosen to prepare pre-development materials for the two potential modes. Monorail proposals were developed by ] LA SkyRail Express, while heavy rail (HRT) work proposals were prepared by ].<ref>{{cite press release |last1=Sotero |first1=Dave |title=L.A. Metro Releases its Recommendation to Contract with Two Private Sector Teams for Pre-Development Work on the Sepulveda Transit Corridor Project |url=https://thesource.metro.net/2021/02/12/l-a-metro-releases-its-recommendation-to-contract-with-two-private-sector-teams-for-pre-development-work-on-the-sepulveda-transit-corridor-project/ |access-date=14 February 2021 |agency=] |publisher=The Source |date=12 February 2021}}</ref> By December 2021, six alternatives had been prepared for further consideration: three heavy rail and three monorail (one of which included a separate ] to serve UCLA).<ref>{{cite news |last1=Sharp |first1=Steven |title=Metro kicks off EIR for Sepulveda Pass rail line |url=https://urbanize.city/la/post/metro-kicks-eir-sepulveda-pass-rail-line |access-date=6 December 2021 |agency=Urbanize.LA |date=December 3, 2021}}</ref> Two consortia were chosen to prepare pre-development materials for the two potential modes. Monorail proposals are being developed by ] LA SkyRail Express, while heavy rail (HRT) work proposals are being by ].<ref>{{cite press release |last1=Sotero |first1=Dave |title=L.A. Metro Releases its Recommendation to Contract with Two Private Sector Teams for Pre-Development Work on the Sepulveda Transit Corridor Project |url=https://thesource.metro.net/2021/02/12/l-a-metro-releases-its-recommendation-to-contract-with-two-private-sector-teams-for-pre-development-work-on-the-sepulveda-transit-corridor-project/ |access-date=14 February 2021 |agency=] |publisher=The Source |date=12 February 2021}}</ref> By December 2021, six alternatives had been prepared for further consideration: three heavy rail options and three monorail options (one of which included a separate ] to serve UCLA).<ref>{{cite news |last1=Sharp |first1=Steven |title=Metro kicks off EIR for Sepulveda Pass rail line |url=https://urbanize.city/la/post/metro-kicks-eir-sepulveda-pass-rail-line |access-date=6 December 2021 |agency=Urbanize.LA |date=December 3, 2021}}</ref>


==Phase One: ''Valley–Westside''== == Phase One: ''Valley–Westside'' ==
===Initial alternatives analysis===
In November 2021, the ] notice for the project alternatives was released, with an environmental scoping period to begin in February 2022. Rail options were refined to three monorail and three heavy rail alternatives. Monorail options 1 and 2 did not include a station on the ] campus and proposed connecting transit options instead. The new alternatives are being considered for the Draft ]<ref name="thesource.metro.net">https://thesource.metro.net/wp-content/uploads/2019/01/Refined-Concepts.jpg {{Bare URL image|date=March 2022}}</ref> north to south routes from the Valley to E Line were as follows:


=== Status Overview ===
{| class="wikitable"

As of December 2024, Metro is in the environmental review stage of planning of the first phase, to traverse Sepulveda Pass. This involves the development of an environmental impact report (EIR) under the ] (CEQA), and subsequently, an ] (EIS) under the ] (NEPA). The Draft EIR will evaluate project alternatives representing a range of rail transit modes, alignments, and station locations for the Sepulveda Transit Corridor Project. Once the draft EIR has been completed and circulated for public comment, Metro staff will recommend a locally preferred alternative (LPA) to the board of directors. After the LPA is identified, the final EIR, draft EIS, and final EIS will be prepared to complete the environmental review process.<ref>https://www.appropriations.senate.gov/imo/media/doc/Division%20L%20-%20THUD%20Statement%20FY23.pdf {{Bare URL PDF|date=August 2024}}</ref> Environmental review is followed by detailed engineering and design, and then construction. Revenue service is projected to start in 2033-2035 if environmental review and funding proceed according to plan.

=== Current project alternatives ===

As of December 2024, LA Metro is considering five project alternatives to connect the San Fernando Valley to the Los Angeles Basin through the Sepulveda Pass,<ref>{{cite web |title=Sepulveda Transit Corridor Fact Sheet |url=https://www.dropbox.com/scl/fi/amkgv92r0xfafno7thq1v/Winter-2024_Sepulveda-Transit-Corridor_Fact-Sheet_ENG-Final4.1.pdf?rlkey=pzvzbg2js1yg4wyezhf3u8z9i&e=1&dl=0 |website=www.metro.net |publisher=LA Metro |access-date=16 December 2024}}</ref> all of which are developed in a partnership with private consortia: Alternatives 1 and 3 are based around a ] system that would be built along the existing I-405 freeway for substantial parts. They are developed by ''LA SkyRail Express'' (LASRE). Alternatives 4 and 5 are based around ] and a new rail tunnel under ]. They are being developed by ''Sepulveda Transit Corridor Partners'' (STCP). Alternative 6 is based on driver-operated heavy rail, as implemented on the ] and ]. As required under ], a no-build alternative is also being evaluated. Alternative 2 was dropped in July 2024.

<gallery>
File:Sepulveda Pass Corridor Project Alternative 1.png | Alternative 1: Aerial Monorail

File:Sepulveda Pass Corridor Project Alternative 2.png | Alternative 2 (eliminated): Aerial Monorail

File:Sepulveda Pass Corridor Project Alternative 3.png | Alternative 3: Aerial Monorail with partial tunneling

File:Sepulveda Pass Corridor Project Alternative 4.png | Alternative 4: Automated heavy rail, partially aerial in Van Nuys

File:Sepulveda Pass Corridor Project Alternative 5.png | Alternative 5: Automated heavy rail, fully tunneled until Van Nuys

File:Sepulveda Pass Corridor Project Alternative 6.png | Alternative 6: Driver-operated heavy rail
</gallery>

=== Project development history ===

In March 2021, ] awarded contracts to two consortia to develop alternatives to separately advance the project via different modes. Plans for an ] ] are being developed by ''Sepulveda Corridor Transit Partners'' (SCTP), a consortium led by construction firm ], along with other partners including the European rail vehicle and systems firms ] and ], engineering firms ] and ], and French transit operator ].<ref name="STCP team website">{{cite web |title=Team |url=https://www.sepulvedatransit.com/team |website=Sepulveda Transit Corridor Partners |access-date=16 December 2024}}</ref> The rival design approach is a ] as planned by ''LA SkyRail Express'' (LASRE), a consortium led by British infrastructure investor ] along with other partners including Chinese EV manufacturer ], Swedish construction firm ], and French transit operator ].<ref name="LA SkyRail Express project team">{{cite web |title=About LA SkyRail |url=https://laskyrailexpress.com/about/ |website=LA SkyRail Express |access-date=16 December 2024 |archive-url=https://web.archive.org/web/20241121214639/https://laskyrailexpress.com/about/ |archive-date=21 November 2024}}</ref><ref>{{cite news |first=Dave |last=Sotero |title=Contracts for Pre-Development Work on Sepulveda Transit Project approved by Metro Board |url=https://thesource.metro.net/2021/03/25/contracts-for-pre-development-on-sepulveda-transit-project-approved-by-metro-board/ |publisher=The Source |agency=Metro |date=March 25, 2021 |access-date=March 26, 2020}}</ref>

In April 2021, Metro advanced five routes to the next study stage, including three routes selected as part of Metro's ] solicitation for the line. The P3 proposals came from ] and ], with Bechtel submitting the same heavy rail alignment and station proposals as HRT-4, and BYD submitting two monorail proposals that differed from the original MRT-1 alternative studied by Metro.<ref>{{cite web | url=https://thesource.metro.net/2021/04/15/here-are-five-route-alternatives-that-will-be-studied-for-sepulveda-transit-corridor/ | title=Here are five route alternatives that will be studied for Sepulveda Transit Corridor | date=15 April 2021 }}</ref>

In November 2021, the ] notice for the project alternatives was released, with an environmental scoping period to begin in February 2022. Rail options were refined to three monorail and three heavy rail alternatives. Monorail options 1 and 2 did not include a station on the ] campus and proposed connecting transit options instead. The alternatives considered for the Draft ]<ref name="thesource.metro.net">https://thesource.metro.net/wp-content/uploads/2019/01/Refined-Concepts.jpg {{Bare URL image|date=March 2022}}</ref> north to south routes from the Valley to E Line are in the following table:

{| class="wikitable mw-collapsible mw-collapsed"
! colspan = 3 | Alternatives in the November 2021 CEQA notice
|- |-
! DEIR Alternative<ref name=NewRefined /> ! DEIR Alternative<ref name=NewRefined />
! Description ! Description
! Ridership<br />(daily)<ref>{{Cite web |title=Fall 2023 FINAL Presentation for Upload.pdf |url=https://www.dropbox.com/scl/fi/945dhzn47cdoklvja6cgz/Fall-2023-FINAL-Presentation-for-Upload.pdf?dl=0&rlkey=d9t17zg7bq0g00aehgfv1rgnr |access-date=2023-12-12 |website=Dropbox |language=en}}</ref> ! Ridership<br />(daily)<ref>{{Cite web |title=Fall 2023 FINAL Presentation for Upload.pdf |url=https://www.dropbox.com/scl/fi/945dhzn47cdoklvja6cgz/Fall-2023-FINAL-Presentation-for-Upload.pdf?dl=0&rlkey=d9t17zg7bq0g00aehgfv1rgnr |access-date=2023-12-12 |website=Dropbox |language=en}}</ref>
! Estimated cost<br />(billions)
|- |-
|'''Alternative-1: MRT w/ Aerial I-405 alignment'''<ref name=June2018Community>{{cite report|url=https://www.scribd.com/document/381310519/Sepulveda-Transit-Corridor-Community-Presentation#download&from_embed|title=Next stop: exploring alternatives to the 405|publisher=Metro|date=June 2018|access-date=19 August 2019}}</ref> |'''Alternative-1: MRT w/ Aerial I-405 alignment'''<ref name=June2018Community>{{cite report|url=https://www.scribd.com/document/381310519/Sepulveda-Transit-Corridor-Community-Presentation#download&from_embed|title=Next stop: exploring alternatives to the 405|publisher=Metro|date=June 2018|access-date=19 August 2019}}</ref>
| A monorail line heading west from the ] then heads south on Sepulveda Boulevard. Eight total aerial station stops, similar to Metro C line stations on the center medians of a freeway. Stops include ], ], the Getty Center freeway entrance, I-405 station with a bus to UCLA, a station near ] (with a bus to UCLA) and at ] before terminating at the ]. A 19-minute ride. | A monorail line heading west from the ] then heads south on Sepulveda Boulevard. Eight total aerial station stops, similar to Metro C line stations on the center medians of a freeway. Stops include ], ], the Getty Center freeway entrance, I-405 station with a bus to UCLA, a station near ] (with a bus to UCLA) and at ] before terminating at the ]. A 19-minute ride.
| align="right" | 64,798 | align="right" | 64,798
| align="right" |$<ref name="2019-0724">{{cite report |url=https://www.scribd.com/document/381310519/Sepulveda-Transit-Corridor-Community-Presentation#download&from_embed |title=Next stop: exploring alternatives to the 405 |date=July 2019 |publisher=Metro |access-date=19 August 2019}}</ref>
|- |-
|'''Alternative-2: MRT w/ Aerial I-405 alignment'''<ref name=NewRefined /> |'''Alternative-2: MRT w/ Aerial I-405 alignment'''<ref name=NewRefined />
| Similar to Alt-1, A monorail line heading west from the ] then heads south on Sepulveda Boulevard. Eight total aerial station stops, similar to Metro C line stations on the center medians of a freeway. Stops include ], ], and the Getty Center freeway entrance. Last three stations at Wilshire/I-405 (w/ APM to UCLA), ]/I-405 and terminating at the ]. All along I-405. A 19-minute ride. | Similar to Alt-1, A monorail line heading west from the ] then heads south on Sepulveda Boulevard. Eight total aerial station stops, similar to Metro C line stations on the center medians of a freeway. Stops include ], ], and the Getty Center freeway entrance. Last three stations at Wilshire/I-405 (w/ APM to UCLA), ]/I-405 and terminating at the ]. All along I-405. A 19-minute ride.
| align="right" | 69,985 | align="right" | 69,985
| align="right" |$
|- |-
|'''Alternative-3: MRT w/ I-405 alignment'''<ref name=NewRefined /> |'''Alternative-3: MRT w/ I-405 alignment'''<ref name=NewRefined />
| Similar to Alt-1 except with a tunnel, A monorail line heading west from the ] then heads south on Sepulveda Boulevard. Nine total stops, including the ], ], and the Getty Center freeway entrance. A 3.3-mile underground tunnel between the Getty Center/I-405 station with a station at UCLA and at Wilshire boulevard. Returning to aerial south of Wilshire Boulevard. Last two stations at ]/I-405 before terminating at the ]. A 19-minute ride. | Similar to Alt-1 except with a tunnel, A monorail line heading west from the ] then heads south on Sepulveda Boulevard. Nine total stops, including the ], ], and the Getty Center freeway entrance. A 3.3-mile underground tunnel between the Getty Center/I-405 station with a station at UCLA and at Wilshire boulevard. Returning to aerial south of Wilshire Boulevard. Last two stations at ]/I-405 before terminating at the ]. A 19-minute ride.
| align="right" |86,013 | align="right" |86,013
| align="right" |$
|- |-
|'''Alternative-4: HRT Sepulveda Blvd alignment'''<ref name=June2018Community /> |'''Alternative-4: HRT Sepulveda Blvd alignment'''<ref name=June2018Community />
| A Heavy Rail Transit line on Sepulveda Blvd., aerial in the San Fernando Valley and underground south of the Santa Monica Mountains. Eight total stations, Four aerial in the Valley and four underground in the Westside area. Includes a station on the UCLA campus. Would make direct transfer stations out of Wilshire/Westwood Station on the D Line and at Expo/Sepulveda station on the E Line. A 14-minute ride. | A Heavy Rail Transit line on Sepulveda Blvd., aerial in the San Fernando Valley and underground south of the Santa Monica Mountains. Eight total stations, Four aerial in the Valley and four underground in the Westside area. Includes a station on the UCLA campus. Would make direct transfer stations out of Wilshire/Westwood Station on the D Line and at Expo/Sepulveda station on the E Line. A 14-minute ride.
| align="right" |120,546 | align="right" |120,546
| align="right" |$
|- |-
|'''Alternative-5: HRT Sepulveda Blvd alignment'''<ref name=June2018Community /> |'''Alternative-5: HRT Sepulveda Blvd alignment'''<ref name=June2018Community />
| A Heavy Rail Transit line on Sepulveda Blvd., same Alignment as Alt: 4, all underground except northern terminus ]. Seven total stations before terminating at the ]. It would be a 14-minute ride. | A Heavy Rail Transit line on Sepulveda Blvd., same Alignment as Alt: 4, all underground except northern terminus ]. Seven total stations before terminating at the ]. It would be a 14-minute ride.
| align="right" |121,624 | align="right" |121,624
| align="right" |$
|- |-
|'''Alternative-6: HRT All Underground Van Nuys Blvd alignment'''<ref name=June2018Community /> |'''Alternative-6: HRT All Underground Van Nuys Blvd alignment'''<ref name=June2018Community />
| A Heavy Rail Transit line down Van Nuys Blvd., Heads south from ], all underground. Three stations in the Valley and four on the west side. The southern terminus would be ]. Direct stations within UCLA, Wilshire/Westwood D line station. Seven total stations. It would be a 14-minute ride. | A Heavy Rail Transit line down Van Nuys Blvd., Heads south from ], all underground. Three stations in the Valley and four on the west side. The southern terminus would be ]. Direct stations within UCLA, Wilshire/Westwood D line station. Seven total stations. It would be a 14-minute ride.
| align="right" |107,096 | align="right" |107,096
| align="right" |$
|} |}


In October of 2023, Metro released ridership estimates for the six Sepulveda Line options, with the results greatly favoring the heavy rail option. Estimates showed that the heavy rail alternatives (4-6) not only had higher ridership than the monorail alternatives (1-3) by between 21,000 to 57,000 daily riders, but the heavy rail alternatives also were 8-14 minutes faster and had quicker connections to other lines in the LA Metro system, such as the ] and ] lines.<ref>{{cite tweet |user=numble |title=October 2023 LA Metro presentation on Sepulveda Transit Corridor. Monorail options have 21k-57k fewer riders, are 8-14 minutes slower, and have longer travel times when connecting to other lines. Heavy rail options 4-5 have ~15k more riders than option 6.|number=1717246984812220909}}</ref>
In April 2021, Metro advanced five routes to the next study stage, including three routes selected as part of Metro's ] solicitation for the line. The P3 proposals came from ] and ], with Bechtel submitting the same heavy rail alignment and station proposals as HRT-4, and BYD submitting two monorail proposals that differed from the original MRT-1 alternative studied by Metro.<ref>{{cite web | url=https://thesource.metro.net/2021/04/15/here-are-five-route-alternatives-that-will-be-studied-for-sepulveda-transit-corridor/ | title=Here are five route alternatives that will be studied for Sepulveda Transit Corridor | date=15 April 2021 }}</ref>

On July 3, 2024, Metro formally eliminated Alternative 2. This follows a request from LASRE for its elimination, along with Metro's independent review and public input in May 2024.<ref>{{cite web |title=July 3, 2024 |url=https://boardarchives.metro.net/BoardBox/2024/240703_Sepulveda_Transit_Corridor_Alternative_2_Update.pdf |website=] |access-date=July 9, 2024}}</ref>

=== Alternative details ===


The following table shows all potential metro stations and the alternatives for which they apply: The following table shows all potential metro stations and the alternatives for which they apply:
Line 118: Line 149:
| Van Nuys | Van Nuys
|- |-
| ''']\Sherman Way''' | ''']\]'''
| style="background: #bbffbb; text-align:center;" | {{tick|20}} | style="background: #bbffbb; text-align:center;" | {{tick|20}}
| style="background: #bbffbb; text-align:center;" | {{tick|20}} | style="background: #bbffbb; text-align:center;" | {{tick|20}}
Line 127: Line 158:
| Van Nuys | Van Nuys
|- |-
| ''']\Sherman Way''' | ''']\]'''
| style="background: #ffbbbb; text-align:center;" | - | style="background: #ffbbbb; text-align:center;" | -
| style="background: #ffbbbb; text-align:center;" | - | style="background: #ffbbbb; text-align:center;" | -
Line 275: Line 306:


;MSF Locations ;MSF Locations
Three Maintenance and Storage Facility (MSF) options are being proposed.<ref name=2019-0724 /> Three Maintenance and Storage Facility (MSF) options are being proposed.<ref name="2019-0724">{{cite report |url=https://www.scribd.com/document/381310519/Sepulveda-Transit-Corridor-Community-Presentation#download&from_embed |title=Next stop: exploring alternatives to the 405 |date=July 2019 |publisher=Metro |access-date=19 August 2019}}</ref>
:Monorail Maintenance and Storage Facility above existing Metro G Line Sepulveda Station Parking Lot. MRT 1, 2, and 3. *Monorail Maintenance and Storage Facility above existing Metro G Line Sepulveda Station Parking Lot. MRT 1, 2, and 3.
:Van Nuys at Arminta. HRT 6. *Van Nuys at Arminta. HRT 6.
:Woodman at Van Nuys Metrolink Station. HRT 4 & 5. *Woodman at Van Nuys Metrolink Station. HRT 4 & 5.

=== Controversy and public opinion ===

The planned project has sparked a vigorous debate that centers on the two different proposed modes: the aerial monorail following ] or heavy rail in a subway tunnel under ].


Supporters of the heavy rail option include ],<ref name="ucla endorsement tunnel">{{cite web |title=UCLA advocates for campus station on Metro’s proposed Sepulveda rail line |url=https://newsroom.ucla.edu/releases/ucla-advocates-for-campus-station-sepulveda-rail-line |website=ucla.edu |publisher=UCLA |access-date=18 December 2024 |date=24 February 2022}}</ref> which would be served with direct station access on campus under all heavy rail options.
=== Pre-Development ===
In March 2021, Metro awarded contracts to two firms to develop two alternatives to advance the project. A plan for conventional heavy rail (HRT) is being developed by ]. The rival design is a monorail as planned by ] LA SkyRail Express.<ref>{{cite news |first=Dave |last=Sotero |title=Contracts for Pre-Development Work on Sepulveda Transit Project approved by Metro Board |url=https://thesource.metro.net/2021/03/25/contracts-for-pre-development-on-sepulveda-transit-project-approved-by-metro-board/ |publisher=The Source |agency=Metro |date=March 25, 2021 |access-date=March 26, 2020}}</ref>


A scoping process carried out by Metro from November 2021 to February 2022 showed a majority of the public favoring heavy rail over monorail, 93% to 7% respectively.<ref>{{Cite web |last=Scauzillo |first=Steve |date=June 21, 2022 |title=Public says: 93% favor rail tunnels, not an overhead monorail, for mega Sepulveda Pass project |url=https://www.dailynews.com/2022/06/20/public-says-93-favor-rail-tunnels-not-an-overhead-monorail-for-mega-sepulveda-pass-project/ |website=Los Angeles Daily News}}</ref> Heavy rail alternatives were cited by comments as having better transfer options to other lines, faster travel times, and more familiarity with the Los Angeles Metro Rail system.<ref>{{cite tweet |user=numble |title=LA Metro June 2022 update on Sepulveda rail project. 93% of comments in scoping period supported heavy rail, and 7% supported monorail. Connection to UCLA was the most mentioned topic. The next update in the Fall would be an update on alignments and stations.|number=1537617110263689217}}</ref> Results of an official public opinion survey conducted by Metro during July and August 2022 to gauge public opinions about the Sepulveda Transit Corridor Project were released in December 2022. After describing details of both rail types were presented to residents, an HRT underground option stood at 71% approval, with respondents citing shorter travel time and fewer surface impacts.<ref>{{cite web | url=https://drive.google.com/file/d/1wJGBPqlQJsdw1L0lo0CMp_DrZjSGvVeO/view | title=20221207_Sepulveda_Transit_Corridor_Project_Survey.PDF }}</ref> A scoping process carried out by Metro from November 2021 to February 2022 showed a majority of the public favoring heavy rail over monorail, 93% to 7% respectively.<ref>{{Cite web |last=Scauzillo |first=Steve |date=June 21, 2022 |title=Public says: 93% favor rail tunnels, not an overhead monorail, for mega Sepulveda Pass project |url=https://www.dailynews.com/2022/06/20/public-says-93-favor-rail-tunnels-not-an-overhead-monorail-for-mega-sepulveda-pass-project/ |website=Los Angeles Daily News}}</ref> Heavy rail alternatives were cited by comments as having better transfer options to other lines, faster travel times, and more familiarity with the Los Angeles Metro Rail system.<ref>{{cite tweet |user=numble |title=LA Metro June 2022 update on Sepulveda rail project. 93% of comments in scoping period supported heavy rail, and 7% supported monorail. Connection to UCLA was the most mentioned topic. The next update in the Fall would be an update on alignments and stations.|number=1537617110263689217}}</ref> Results of an official public opinion survey conducted by Metro during July and August 2022 to gauge public opinions about the Sepulveda Transit Corridor Project were released in December 2022. After describing details of both rail types were presented to residents, an HRT underground option stood at 71% approval, with respondents citing shorter travel time and fewer surface impacts.<ref>{{cite web | url=https://drive.google.com/file/d/1wJGBPqlQJsdw1L0lo0CMp_DrZjSGvVeO/view | title=20221207_Sepulveda_Transit_Corridor_Project_Survey.PDF }}</ref>


State assemblywoman ], chair of the ] Transportation Committee, implied her support the heavy rail alternatives, citing the monorail alternatives having their stations located in I-405 as well as the need for a station at UCLA.<ref>{{cite tweet |user=numble |title=Sherman Oaks Homeowners Association asks Laura Friedman (California Assembly Transportation Chair) about LA Metro's Sepulveda project. She says it should go to UCLA, is rider-centric, does not have people stand in middle of highway. She wants to build consensus on the project.|number=1715074629771915411}}</ref>
The Project is currently in the environmental review phase involving the development of an ] (EIR) under the ] (CEQA), and subsequently an ] (EIS) under the ] (NEPA). The Draft EIR will evaluate Project alternatives representing a range of rail transit modes, alignments, and station locations for the Sepulveda Transit Corridor Project. Once the Draft EIR has been completed and circulated for public comment, a ] (LPA) will be recommended to the Metro Board of Directors. After the LPA is identified, the Final EIR, Draft EIS, and Final EIS will be prepared to complete the environmental review process.<ref>https://www.appropriations.senate.gov/imo/media/doc/Division%20L%20-%20THUD%20Statement%20FY23.pdf</ref>


The heavy rail option is summarily rejected by a group of homeowners in the affluent ] neighborhood, under which the subway tunnel would be built. An organized effort against this option is primarily led by ], the former CEO of ] and leader of opposition group ''Keep Bel Air Beautiful''. Jamie Meyer, president of the ''Bel Air Association'', called the proposal a "mind boggling expensive and potentially dangerous subway under our community". Local congressman ], who is seen as pivotal in the debate due to his position for lobbing for federal funding, sent a letter to Metro with the local homeowners' concerns, though he declined to take a side himself until the environmental review is complete.<ref name="la daily news tunnel debate">{{cite news |last1=Scauzillo |first1=Steve |title=Rep. Brad Sherman jumps into debate over proposed Metro tunnels in Bel Air |url=https://www.dailynews.com/2022/12/17/rep-brad-sherman-jumps-into-debate-over-proposed-metro-tunnels-in-bel-air/ |access-date=18 December 2024 |work=Los Angeles Daily News |date=19 December 2022 |archive-url=http://web.archive.org/web/20221222022726/https://www.dailynews.com/2022/12/17/rep-brad-sherman-jumps-into-debate-over-proposed-metro-tunnels-in-bel-air/ |archive-date=22 December 2022}}</ref> Main concerns brought forth by the heavy rail opponents are worries about noise issues and traffic disruptions during construction, as well as vibrations during operation. Metro dismisses all these claims. Further points include fiscal sustainability in light of the high upfront costs and Metro's record of cost overruns. The opponent group threatens to litigate their claims. Supporters criticize that litigation is unlikely to succeed, but may contribute to increasing costs and lead to delays.<ref name="hollywood reporter tunnel controversy">{{cite news |last1=Baum |first1=Gary |title=Train Wreck? A Mogul’s Battle Against The Bel-Air Subway |url=https://www.hollywoodreporter.com/business/business-news/fred-rosen-battle-bel-air-subway-1235807662/ |access-date=18 December 2024 |work=The Hollwood Reporter |date=29 January 2024 |archive-url=http://web.archive.org/web/20240407135211/https://www.hollywoodreporter.com/business/business-news/fred-rosen-battle-bel-air-subway-1235807662/ |archive-date=7 April 2024}}</ref>
In October of 2023, LA Metro released ridership estimates for the six Sepulveda Line options, with the results greatly favoring the heavy rail option. Estimates showed that the heavy rail alternatives (4-6) not only had higher ridership than the monorail alternatives (1-3) by between 21,000 to 57,000 daily riders, but the heavy rail alternatives also were 8-14 minutes faster and had quicker connections to other lines in the LA Metro system, such as the ] and ].<ref>{{cite tweet |user=numble |title=October 2023 LA Metro presentation on Sepulveda Transit Corridor. Monorail options have 21k-57k fewer riders, are 8-14 minutes slower, and have longer travel times when connecting to other lines. Heavy rail options 4-5 have ~15k more riders than option 6.|number=1717246984812220909}}</ref> In addition, state assemblywoman ], chair of the ] Transportation Committee, implied her support the heavy rail alternatives, citing the monorail alternatives having their stations located in I-405 as well as the need for a station at UCLA.<ref>{{cite tweet |user=numble |title=Sherman Oaks Homeowners Association asks Laura Friedman (California Assembly Transportation Chair) about LA Metro's Sepulveda project. She says it should go to UCLA, is rider-centric, does not have people stand in middle of highway. She wants to build consensus on the project.|number=1715074629771915411}}</ref>


==Phase Two: ''Westside–LAX''== ==Phase Two: ''Westside–LAX''==
===Initial alternatives analysis=== ===Initial alternatives analysis===
Early concepts for phase two from E Line to the (at the time unbuilt but now operational) ] were released in 2019, with detailed connections to the under-construction ].<ref name=released /> Metro hopes to complete the feasibility study by 2019 and begin an environmental impact review along with phase one. Early concepts for phase two from E Line to the (at the time unbuilt but now operational) ] were released in 2019, with detailed connections to the under-construction ].<ref name=released /> Metro hopes to complete the feasibility study by 2019 and begin an environmental impact review along with phase one.{{update inline|date=July 2024}}


There are two main modes for phase two of the corridor. Five proposed concepts begin at either ] or ], contingent on the terminus of the first phase of the project. All routes terminate at the ], which is currently under construction as part of the ]. This terminus station will offer transfers to the ] and LAX Automated People Mover.<ref name=NewRefined /> There are two main modes for phase two of the corridor. Five proposed concepts begin at either ] or ], contingent on the terminus of the first phase of the project. All routes terminate at the ], which is currently under construction as part of the ]. This terminus station will offer transfers to the ] and LAX Automated People Mover.<ref name=NewRefined />


Concepts include routing south along Sepulveda Boulevard, Overland Boulevard, Centinela Boulevard, and ], with possible intermediate stops at Venice Boulevard, Culver City Transit Center, the Howard Hughes Center, and Sepulveda Boulevard at Manchester Boulevard. The Sepulveda Boulevard route option would be completed as below-grade ], while the I-405 option could be completed as either a combination of elevated and below-grade ] or a combination of elevated and below-grade ].<ref name="media.metro.net">https://media.metro.net/projects_studies/sfv-405/images/presentation_Sepulveda_HNTB_2019-01.pdf {{Bare URL PDF|date=March 2022}}</ref> Concepts include routing south along Sepulveda Boulevard, Overland Avenue, Centinela Avenue, and ], with possible intermediate stops at Venice Boulevard, Culver City Transit Center, the Howard Hughes Center, and Sepulveda Boulevard at Manchester Boulevard. The Sepulveda Boulevard route option would be completed as below-grade ], while the I-405 option could be completed as either a combination of elevated and below-grade ] or a combination of elevated and below-grade ].<ref name="media.metro.net">https://media.metro.net/projects_studies/sfv-405/images/presentation_Sepulveda_HNTB_2019-01.pdf {{Bare URL PDF|date=March 2022}}</ref>


Metro's July 2019 updated concepts for Phase 2 added a stop along Santa Monica Boulevard per public popular demand. They added the fifth concept, extending the east/west ] terminus south towards LAX. A one-boarding HRT trip from LAX to Downtown Los Angeles along Centinela Blvd.<ref name="thesource.metro.net"/> Metro's July 2019 updated concepts for Phase 2 added a stop along Santa Monica Boulevard per public popular demand. They added the fifth concept, extending the east/west ] terminus south towards LAX, creating a one-seat HRT trip from LAX to Downtown Los Angeles along Centinela Avenue.<ref name="thesource.metro.net"/>


All north-to-south routes from the E Line to LAX are: All north-to-south routes from the E Line to LAX are:
Line 305: Line 339:
! Description ! Description
! Ridership<br />(daily) ! Ridership<br />(daily)
! Estimated cost<br />(billions)
|- |-
|'''Alternative 1: HRT or MRT I-405 route'''<ref name=June2018Community /> |'''Alternative 1: HRT or MRT I-405 route'''<ref name=June2018Community />
| A ] (HRT) line heading south from the ] on the ] median with an aerial stop at Venice Blvd/I-405. Leaves the aerial route and continues underground with stations on Centinela/Sepulveda and Manchester/Sepulveda near LAX. The southern terminus station is at ].<ref name=2019-0724 /> A 38-minute ride. | A ] (HRT) line heading south from the ] on the ] median with an aerial stop at Venice Blvd/I-405. Leaves the aerial route and continues underground with stations on Centinela/Sepulveda and Manchester/Sepulveda near LAX. The southern terminus station is at ].<ref name=2019-0724 /> A 38-minute ride.
| align="left" |MRT: 173,000 HRT: 228,000<ref name=2019-0724 /> | align="left" |MRT: 173,000 HRT: 228,000<ref name=2019-0724 />
| align="right" |
|- |-
|'''Alternative 2: ] route'''<ref name=June2018Community /> |'''Alternative 2: ] route'''<ref name=June2018Community />
| A ] (HRT) line heading south underground from either ] or ] with stops at Venice/Centinela, Culver/Centinela, Jefferson/Centinela, and Manchester/Sepulveda with its southern terminus station at ].<ref name=2019-0724 /> A 31-minute ride. | A ] (HRT) line heading south underground from either ] or ] with stops at Venice/Centinela, Culver/Centinela, Jefferson/Centinela, and Manchester/Sepulveda with its southern terminus station at ].<ref name=2019-0724 /> A 31-minute ride.
| align="right" | 229,000<ref name=2019-0724 /> | align="right" | 229,000<ref name=2019-0724 />
| align="right" |
|- |-
|'''Alternative 3: HRT ] route'''<ref name=June2018Community /> |'''Alternative 3: HRT ] route'''<ref name=June2018Community />
| A ] (HRT) line heading south underground from the ] along Sepulveda Boulevard with stops at Venice/Sepulveda, Jefferson/Sepulveda and Manchester/Sepulveda near LAX. The southern terminus station is at ].<ref name=2019-0724 /> A 30-minute ride. | A ] (HRT) line heading south underground from the ] along Sepulveda Boulevard with stops at Venice/Sepulveda, Jefferson/Sepulveda and Manchester/Sepulveda near LAX. The southern terminus station is at ].<ref name=2019-0724 /> A 30-minute ride.
| align="right" |236,000<ref name=2019-0724 /> | align="right" |236,000<ref name=2019-0724 />
| align="right" |
|- |-
|'''Alternative 4: HRT ] route'''<ref name=June2018Community /> |'''Alternative 4: HRT ] route'''<ref name=June2018Community />
| A ] (HRT) line heading south underground from the ] to Overland Avenue. Stations located on Overland/Venice Blvd. and Overland/Jefferson Blvd, Jefferson/Sepulveda, and Manchester/Sepulveda near LAX. The southern terminus station is at ].<ref name=2019-0724 /> A 31-minute ride. | A ] (HRT) line heading south underground from the ] to Overland Avenue. Stations located on Overland/Venice Blvd. and Overland/Jefferson Blvd, Jefferson/Sepulveda, and Manchester/Sepulveda near LAX. The southern terminus station is at ].<ref name=2019-0724 /> A 31-minute ride.
| align="right" |233,000<ref name=2019-0724 /> | align="right" |233,000<ref name=2019-0724 />
| align="right" |
|- |-
|'''Alternative 5: D Line Extension routes'''<ref name=June2018Community /> |'''Alternative 5: D Line Extension routes'''<ref name=June2018Community />
| A ] (HRT) extension south of the under-construction D Line extension terminus station of ] or ], a stop on Santa Monica Boulevard and then follow the Centinela Ave route alternative (alt 2) as underground HRT. The southern terminus station is at ].<ref name=2019-0724 /> A 31-minute ride. | A ] (HRT) extension south of the under-construction D Line extension terminus station of ] or ], a stop on Santa Monica Boulevard and then follow the Centinela Ave route alternative (alt 2) as underground HRT. The southern terminus station is at ].<ref name=2019-0724 /> A 31-minute ride.
| align="right" |275,000<ref name=2019-0724 /> | align="right" |275,000<ref name=2019-0724 />
| align="right" |


|} |}


===Alternative details===
The following table shows all potential metro stations and the alternatives for which they apply: The following table shows all potential metro stations and the alternatives for which they apply:


Line 353: Line 382:
| style="background: #ffbbbb; text-align:center;" | - | style="background: #ffbbbb; text-align:center;" | -
| style="background: #bbffbb; text-align:center;" | {{tick|20}} | style="background: #bbffbb; text-align:center;" | {{tick|20}}
| {{LACMTA icon|D|showtext=yes}} (by 2027) | {{LACMTA icon|D|showtext=yes}} ({{abbr|NET|No Earlier Than}} 2027)
| Westwood | Westwood
|- |-
Line 461: Line 490:
| style="background: #bbffbb; text-align:center;" | {{tick|20}} | style="background: #bbffbb; text-align:center;" | {{tick|20}}
| style="background: #bbffbb; text-align:center;" | {{tick|20}} | style="background: #bbffbb; text-align:center;" | {{tick|20}}
|] (by 2023)<br />{{LACMTA icon|Crenshaw|showtext="yes"}}(by 2024) |] (2025)<br />{{LACMTA icon|Crenshaw|showtext="yes"}} (2024)
| Westchester | Westchester
|- |-
Line 496: Line 525:
] ]
] ]
]

Latest revision as of 06:18, 18 December 2024

Proposed transit corridor in Los Angeles, California

 Sepulveda Transit Corridor
Sepulveda Pass and I-405, as seen from the Getty Center Tram in 2008
Overview
StatusPlanned
LocaleSan Fernando Valley
Westside
Service
TypeRapid transit or Monorail
SystemMetro
History
Planned opening2033–2035
Route map

Legend
Alternative 1 (MRT)
East Valley Light Rail
Amtrak Metrolink (California)
Van Nuys/Metrolink Parking
to Van Nuys Metro Station
Sherman Way
Maintenance facility
Sepulveda Parking G Line
US 101
I-405 (1961).svg I-405
Santa Monica Mountains
Getty Center Getty Center Tram
Westwood/VA Hospital D Line (Bus interchange to UCLA)
Santa Monica Boulevard
Expo/Sepulveda Parking E Line
Alternative 3 (MRT)
East Valley Light Rail
Amtrak Metrolink (California)
Van Nuys/Metrolink Parking
to Van Nuys Metro Station
Sherman Way
Maintenance facility
Sepulveda Parking G Line
US 101
I-405 (1961).svg I-405
Santa Monica Mountains
Getty Center Getty Center Tram
UCLA
Westwood/UCLA D Line
Santa Monica Boulevard
Expo/Sepulveda Parking E Line
Alternative 4 (HRT)
East Valley Light Rail
Amtrak Metrolink (California)
Van Nuys/Metrolink Parking
to Van Nuys Metro Station
Sherman Way
Sepulveda Parking G Line
US 101 (1961 cutout).svg US 101
Ventura/Sepulveda
Santa Monica Mountains
UCLA
Westwood/UCLA D Line
Santa Monica Boulevard
Expo/Sepulveda Parking E Line
Phase 2
Alternative 5 (HRT)
East Valley Light Rail
Amtrak Metrolink (California)
Van Nuys/Metrolink
to Van Nuys Metro Station
Sherman Way
Sepulveda Parking G Line
US 101 (1961 cutout).svg US 101
Ventura/Sepulveda
Santa Monica Mountains
UCLA
Westwood/UCLA D Line
Santa Monica Boulevard
Expo/Sepulveda Parking E Line
Phase 2
Alternative 6 (HRT)
East Valley Light Rail
Van Nuys/Metrolink Parking Amtrak Metrolink (California)
Van Nuys Metro Station Parking G Line
US 101 (1961 cutout).svg US 101
Ventura/Van Nuys
Santa Monica Mountains
UCLA
Westwood/UCLA D Line
I-405 (1961).svg I-405
Santa Monica Boulevard
Expo/Bundy Parking E Line
Phase 2

Handicapped/disabled access All stations are accessible
This diagram:

The Sepulveda Transit Corridor is a two-phased planned transit corridor in Los Angeles, California. Its first phase aims to connect the San Fernando Valley to the Los Angeles Basin through the Sepulveda Pass. A second phase would further extend the line southwards to connect with Los Angeles International Airport. The corridor is intended to relieve the heavily congested I-405 freeway through Sepulveda Pass and provide a fast public transit option on this North-South link. Proposed alternatives include heavy rail rapid transit (a subway) or a monorail line connecting the G Line in the Valley to the D Line and E Line on the Westside, and the K Line near Los Angeles International Airport. As of December 2024, the project is in the environmental review phase of planning and construction is expected to be funded via a combination of local Measure M revenue and applications to federal grants. Pending these two requirements, the first phase is projected to open in 2033-2035.

Current traffic situation

The proposed transit line will traverse the Sepulveda Pass largely parallel to the existing I-405 freeway, which connects US 101 to its North in the San Fernando Valley with I-10 to its South in the L.A. Westside. I-405 is the busiest highway corridor in the United States, serving 379,000 vehicles per day. A five-year construction project to widen the I-405 at the cost of $1.6 billion was completed in 2014, but its impact on reducing congestion remains disputed.

Currently, what is essentially phase 1 of the project is being serviced by LA Metro with bus Route 761, which uses Sepulveda Boulevard to traverse the Sepulveda Pass. Its southern terminus is Expo/Sepulveda station on the E Line, and connects to the G Line at its Van Nuys station and Amtrak and Metrolink at their Van Nuys station, before terminating at Sylmar/San Fernando station. It takes about an hour to connect the E and G Lines. Route 233 serves Sepulveda Pass at night.

What is currently designated as phase 2 of the project is served by Culver CityBus lines 6 and Rapid 6 via Sepulveda Boulevard, with the latter only operating weekdays. The lines' northern terminus is the UCLA Gateway Plaza (Westwood/Strathmore). Both lines 6 and Rapid 6 meet the aforementioned Metro 761 in Westwood Village at the Westwood Blvd/Weyburn Ave intersection and at the 761's southern terminus, the Metro E Line's Expo/Sepulveda station. The southern terminus is the Aviation/LAX C line station. As such, the lines indirectly serve LAX, requiring a transfer to a free shuttle bus that serves the station and LAX terminals. They will be rerouted to the LAX Metro Transit center station once it is open, as the station will feature bus bays and direct connections to the LAX terminals by way of the LAX Automated People Mover. Rapid 6 is unique in that it has traffic intersection signal priority in the City of Los Angeles, whereas most agencies do not have signal priority outside of their base city. Line 6 completes its run as scheduled in 1 hour 4 minutes with average traffic while the Rapid 6 completes its run with 15 minute headways in 54 minutes as scheduled with average traffic.

Total transit time from the Aviation/LAX C Line station to the Van Nuys G Line Station with the current bus service is about 2 hours plus transfer time. The completion of both phases of this project is estimated to reduce total transit time through the whole line to about 45 minutes.

History

Rail system map included in the official 1980 Proposition A election pamphlet, including the Sepulveda Transit Corridor

The line is a long-established goal in Los Angeles transit planning. Proposition A, which imposed a half-cent sales tax in Los Angeles County to fund a regional transit system, was passed in 1980, and a Sepulveda Pass line was in the project map that was part of the proposition's documentation.

The Los Angeles County Metropolitan Transportation Authority (Metro) has $10 billion in funds available for construction planned to begin in 2026. The plan included in the Measure M transportation funding measure is to build improvements in three stages: additional lanes to be used for express bus service to open by 2028, an 8.8-mile (14.2 km) transit project between the G Line's Van Nuys Station and the D Line Extension’s Wilshire/Westwood Station by 2035, and a planned extension to LAX with a 2059 completion date. In April 2017, Metro issued a request for proposal to study alternatives, and several companies sent unsolicited proposals to accelerate the project via public-private partnerships. The project's timeline could be accelerated under the Twenty-eight by '28 initiative.

Initial proposed routings and modes

In June 2018, Metro released its initial six alternative rail concepts for the corridor. All of the proposals provided connections between the G Line (at Sepulveda, Van Nuys, or both) and the E Line (at Expo/Sepulveda or Expo/Bundy), as well as to the D Line Extension, currently under construction, and to the East San Fernando Valley Light Rail Transit Project, currently being planned. The proposals fell into four categories:

  • A standalone heavy rail (HRT) line, primarily underground but possibly with some elevated sections in the Valley.
  • A continuation of the East San Fernando Valley Light Rail Transit Project, primarily underground but with a possible elevated spur to Sepulveda station.
  • A monorail or rubber-tired metro line, underground on the Westside, elevated in the Valley, and running at grade or elevated along the 405.
  • An further extension of the heavy rail D Line, with a wye that would allow direct connections between the Valley and the E Line as well as from both to downtown. This option would be mostly underground but could include elevated sections in the Valley.

In January 2019, Metro released a refined second set of rail concepts for the corridor, eliminating light rail and rubber-tired metro technology from consideration and narrowing it down to four concepts:

  • Three routings for a heavy rail line, primarily underground but possibly with some elevated sections in the Valley.
  • A monorail, underground on the Westside, elevated in the Valley along Sepulveda Boulevard, and running at grade or elevated along the 405, terminating at the Van Nuys Metrolink station.

In July 2019, Metro released a third refined rail concept after community input. These mainly covered the same routes but with a station added at Santa Monica Boulevard Station in reaction to public feedback. Both costs and ridership projections were higher for these proposals.

The feasibility study for both phases was completed and presented in November 2019, with no significant refinement from the July 2019 presentation. The study said that additional research was needed on whether the project would need to relocate or maneuver around a nine-foot wide DWP water pipe called the "Sepulveda Feeder." Additional studies were also called for on general station locations, tunnel design configuration, rider transfer patterns, and the identification of costs and cost reductions. The study also called for more information to be gathered on the impact of the Santa Monica Fault near Santa Monica Boulevard. The Metro Board then commenced the NEPA and CEQA scoping process.

Two consortia were chosen to prepare pre-development materials for the two potential modes. Monorail proposals are being developed by BYD LA SkyRail Express, while heavy rail (HRT) work proposals are being by Bechtel. By December 2021, six alternatives had been prepared for further consideration: three heavy rail options and three monorail options (one of which included a separate automated people mover to serve UCLA).

Phase One: Valley–Westside

Status Overview

As of December 2024, Metro is in the environmental review stage of planning of the first phase, to traverse Sepulveda Pass. This involves the development of an environmental impact report (EIR) under the California Environmental Quality Act (CEQA), and subsequently, an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA). The Draft EIR will evaluate project alternatives representing a range of rail transit modes, alignments, and station locations for the Sepulveda Transit Corridor Project. Once the draft EIR has been completed and circulated for public comment, Metro staff will recommend a locally preferred alternative (LPA) to the board of directors. After the LPA is identified, the final EIR, draft EIS, and final EIS will be prepared to complete the environmental review process. Environmental review is followed by detailed engineering and design, and then construction. Revenue service is projected to start in 2033-2035 if environmental review and funding proceed according to plan.

Current project alternatives

As of December 2024, LA Metro is considering five project alternatives to connect the San Fernando Valley to the Los Angeles Basin through the Sepulveda Pass, all of which are developed in a partnership with private consortia: Alternatives 1 and 3 are based around a monorail system that would be built along the existing I-405 freeway for substantial parts. They are developed by LA SkyRail Express (LASRE). Alternatives 4 and 5 are based around automated heavy rail and a new rail tunnel under Bel Air. They are being developed by Sepulveda Transit Corridor Partners (STCP). Alternative 6 is based on driver-operated heavy rail, as implemented on the B- and D-Line. As required under CEQA, a no-build alternative is also being evaluated. Alternative 2 was dropped in July 2024.

  • Alternative 1: Aerial Monorail Alternative 1: Aerial Monorail
  • Alternative 2 (eliminated): Aerial Monorail Alternative 2 (eliminated): Aerial Monorail
  • Alternative 3: Aerial Monorail with partial tunneling Alternative 3: Aerial Monorail with partial tunneling
  • Alternative 4: Automated heavy rail, partially aerial in Van Nuys Alternative 4: Automated heavy rail, partially aerial in Van Nuys
  • Alternative 5: Automated heavy rail, fully tunneled until Van Nuys Alternative 5: Automated heavy rail, fully tunneled until Van Nuys
  • Alternative 6: Driver-operated heavy rail Alternative 6: Driver-operated heavy rail

Project development history

In March 2021, Metro awarded contracts to two consortia to develop alternatives to separately advance the project via different modes. Plans for an automated heavy rail are being developed by Sepulveda Corridor Transit Partners (SCTP), a consortium led by construction firm Bechtel, along with other partners including the European rail vehicle and systems firms Stadler Rail and Siemens Mobility, engineering firms Systra and T.Y. Lin, and French transit operator RATP Dev. The rival design approach is a monorail as planned by LA SkyRail Express (LASRE), a consortium led by British infrastructure investor John Laing plc along with other partners including Chinese EV manufacturer BYD, Swedish construction firm Skanska, and French transit operator Keolis.

In April 2021, Metro advanced five routes to the next study stage, including three routes selected as part of Metro's public-private partnership solicitation for the line. The P3 proposals came from Bechtel and BYD Company, with Bechtel submitting the same heavy rail alignment and station proposals as HRT-4, and BYD submitting two monorail proposals that differed from the original MRT-1 alternative studied by Metro.

In November 2021, the CEQA notice for the project alternatives was released, with an environmental scoping period to begin in February 2022. Rail options were refined to three monorail and three heavy rail alternatives. Monorail options 1 and 2 did not include a station on the UCLA campus and proposed connecting transit options instead. The alternatives considered for the Draft Environmental Impact Report north to south routes from the Valley to E Line are in the following table:

Alternatives in the November 2021 CEQA notice
DEIR Alternative Description Ridership
(daily)
Alternative-1: MRT w/ Aerial I-405 alignment A monorail line heading west from the Van Nuys Metrolink station then heads south on Sepulveda Boulevard. Eight total aerial station stops, similar to Metro C line stations on the center medians of a freeway. Stops include Van Nuys G Line station, US-101 freeway, the Getty Center freeway entrance, I-405 station with a bus to UCLA, a station near Westwood D Line station (with a bus to UCLA) and at Santa Monica Boulevard before terminating at the Expo/Sepulveda station E Line. A 19-minute ride. 64,798
Alternative-2: MRT w/ Aerial I-405 alignment Similar to Alt-1, A monorail line heading west from the Van Nuys Metrolink station then heads south on Sepulveda Boulevard. Eight total aerial station stops, similar to Metro C line stations on the center medians of a freeway. Stops include Van Nuys G Line station, US-101 freeway, and the Getty Center freeway entrance. Last three stations at Wilshire/I-405 (w/ APM to UCLA), Santa Monica Boulevard/I-405 and terminating at the Expo/Sepulveda station E Line. All along I-405. A 19-minute ride. 69,985
Alternative-3: MRT w/ I-405 alignment Similar to Alt-1 except with a tunnel, A monorail line heading west from the Van Nuys Metrolink station then heads south on Sepulveda Boulevard. Nine total stops, including the Van Nuys G Line station, US-101 freeway, and the Getty Center freeway entrance. A 3.3-mile underground tunnel between the Getty Center/I-405 station with a station at UCLA and at Wilshire boulevard. Returning to aerial south of Wilshire Boulevard. Last two stations at Santa Monica Boulevard/I-405 before terminating at the Expo/Sepulveda station E Line. A 19-minute ride. 86,013
Alternative-4: HRT Sepulveda Blvd alignment A Heavy Rail Transit line on Sepulveda Blvd., aerial in the San Fernando Valley and underground south of the Santa Monica Mountains. Eight total stations, Four aerial in the Valley and four underground in the Westside area. Includes a station on the UCLA campus. Would make direct transfer stations out of Wilshire/Westwood Station on the D Line and at Expo/Sepulveda station on the E Line. A 14-minute ride. 120,546
Alternative-5: HRT Sepulveda Blvd alignment A Heavy Rail Transit line on Sepulveda Blvd., same Alignment as Alt: 4, all underground except northern terminus Van Nuys Metrolink station. Seven total stations before terminating at the Expo/Sepulveda station E Line. It would be a 14-minute ride. 121,624
Alternative-6: HRT All Underground Van Nuys Blvd alignment A Heavy Rail Transit line down Van Nuys Blvd., Heads south from Van Nuys Metrolink station, all underground. Three stations in the Valley and four on the west side. The southern terminus would be Expo/Bundy station. Direct stations within UCLA, Wilshire/Westwood D line station. Seven total stations. It would be a 14-minute ride. 107,096

In October of 2023, Metro released ridership estimates for the six Sepulveda Line options, with the results greatly favoring the heavy rail option. Estimates showed that the heavy rail alternatives (4-6) not only had higher ridership than the monorail alternatives (1-3) by between 21,000 to 57,000 daily riders, but the heavy rail alternatives also were 8-14 minutes faster and had quicker connections to other lines in the LA Metro system, such as the D and E lines.

On July 3, 2024, Metro formally eliminated Alternative 2. This follows a request from LASRE for its elimination, along with Metro's independent review and public input in May 2024.

Alternative details

The following table shows all potential metro stations and the alternatives for which they apply:

Station Options Alt. 1
MRT
Alt. 2
MRT
Alt. 3
MRT
Alt. 4 / 5
HRT
Alt. 6
HRT
Connecting
rail services
Community
Van Nuys (Metrolink) checkY checkY checkY checkY checkY Amtrak Amtrak: Pacific Surfliner & Coast Starlight
Metrolink (California) Metrolink:Metrolink (California) Line
Future station of the East San Fernando Valley Light Rail Transit Project.
Van Nuys
I-405\Sherman Way checkY checkY checkY - - Van Nuys
Sepulveda Boulevard\Sherman Way - - - checkY - Van Nuys
Sepulveda Boulevard (w/ G Line) - - - checkY - G Line G Line Van Nuys
Van Nuys (Future Metro Station) - - - - checkY G Line G Line

Future southern terminus station of the East San Fernando Valley Light Rail Transit Project.

Van Nuys
I-405\G Line checkY checkY checkY - - G Line G Line Van Nuys
I-405\US 101 checkY checkY checkY - - Sherman Oaks
Ventura Boulevard/Van Nuys Boulevard - - - - checkY Sherman Oaks
Ventura Boulevard/Sepulveda Boulevard - - - checkY - Sherman Oaks
Getty Center checkY checkY checkY - - Pass Area
Westwood/VA Hospital station - - - - - D LineD Line (by 2027). Electric Bus per MRT 1, 2, and 3. Westwood
UCLA - - checkY checkY checkY Westwood
Westwood/UCLA - - checkY checkY checkY D LineD Line (by 2027) Westwood
I-405\Wilshire Blvd checkY checkY - - - W/ Bus or people mover to UCLA. Westwood
Santa Monica Boulevard checkY checkY checkY checkY checkY West Los Angeles
Expo/Sepulveda - - - checkY - E Line E Line West Los Angeles
Expo/Bundy - - - - checkY E Line E Line West Los Angeles
Expo/I-405 checkY checkY checkY - - West Los Angeles
MSF Locations

Three Maintenance and Storage Facility (MSF) options are being proposed.

  • Monorail Maintenance and Storage Facility above existing Metro G Line Sepulveda Station Parking Lot. MRT 1, 2, and 3.
  • Van Nuys at Arminta. HRT 6.
  • Woodman at Van Nuys Metrolink Station. HRT 4 & 5.

Controversy and public opinion

The planned project has sparked a vigorous debate that centers on the two different proposed modes: the aerial monorail following I-405 or heavy rail in a subway tunnel under Bel Air.

Supporters of the heavy rail option include UCLA, which would be served with direct station access on campus under all heavy rail options.

A scoping process carried out by Metro from November 2021 to February 2022 showed a majority of the public favoring heavy rail over monorail, 93% to 7% respectively. Heavy rail alternatives were cited by comments as having better transfer options to other lines, faster travel times, and more familiarity with the Los Angeles Metro Rail system. Results of an official public opinion survey conducted by Metro during July and August 2022 to gauge public opinions about the Sepulveda Transit Corridor Project were released in December 2022. After describing details of both rail types were presented to residents, an HRT underground option stood at 71% approval, with respondents citing shorter travel time and fewer surface impacts.

State assemblywoman Laura Friedman, chair of the California State Assembly Transportation Committee, implied her support the heavy rail alternatives, citing the monorail alternatives having their stations located in I-405 as well as the need for a station at UCLA.

The heavy rail option is summarily rejected by a group of homeowners in the affluent Bel Air neighborhood, under which the subway tunnel would be built. An organized effort against this option is primarily led by Fred Rosen, the former CEO of Ticketmaster and leader of opposition group Keep Bel Air Beautiful. Jamie Meyer, president of the Bel Air Association, called the proposal a "mind boggling expensive and potentially dangerous subway under our community". Local congressman Brad Sherman, who is seen as pivotal in the debate due to his position for lobbing for federal funding, sent a letter to Metro with the local homeowners' concerns, though he declined to take a side himself until the environmental review is complete. Main concerns brought forth by the heavy rail opponents are worries about noise issues and traffic disruptions during construction, as well as vibrations during operation. Metro dismisses all these claims. Further points include fiscal sustainability in light of the high upfront costs and Metro's record of cost overruns. The opponent group threatens to litigate their claims. Supporters criticize that litigation is unlikely to succeed, but may contribute to increasing costs and lead to delays.

Phase Two: Westside–LAX

Initial alternatives analysis

Early concepts for phase two from E Line to the (at the time unbuilt but now operational) K Line were released in 2019, with detailed connections to the under-construction LAX Automated People Mover. Metro hopes to complete the feasibility study by 2019 and begin an environmental impact review along with phase one.

There are two main modes for phase two of the corridor. Five proposed concepts begin at either Expo/Bundy station or Expo/Sepulveda station, contingent on the terminus of the first phase of the project. All routes terminate at the LAX/Metro Transit Center station, which is currently under construction as part of the Crenshaw/LAX Transit Corridor Project. This terminus station will offer transfers to the K Line and LAX Automated People Mover.

Concepts include routing south along Sepulveda Boulevard, Overland Avenue, Centinela Avenue, and I-405, with possible intermediate stops at Venice Boulevard, Culver City Transit Center, the Howard Hughes Center, and Sepulveda Boulevard at Manchester Boulevard. The Sepulveda Boulevard route option would be completed as below-grade heavy rail, while the I-405 option could be completed as either a combination of elevated and below-grade heavy rail or a combination of elevated and below-grade monorail.

Metro's July 2019 updated concepts for Phase 2 added a stop along Santa Monica Boulevard per public popular demand. They added the fifth concept, extending the east/west Purple Line Extension terminus south towards LAX, creating a one-seat HRT trip from LAX to Downtown Los Angeles along Centinela Avenue.

All north-to-south routes from the E Line to LAX are:

DEIR Alternative Description Ridership
(daily)
Alternative 1: HRT or MRT I-405 route A heavy rail transit (HRT) line heading south from the Expo/Sepulveda station on the I-405 median with an aerial stop at Venice Blvd/I-405. Leaves the aerial route and continues underground with stations on Centinela/Sepulveda and Manchester/Sepulveda near LAX. The southern terminus station is at LAX/Metro Transit Center station. A 38-minute ride. MRT: 173,000 HRT: 228,000
Alternative 2: Centinela route A heavy rail transit (HRT) line heading south underground from either Expo/Bundy station or Expo/Sepulveda station with stops at Venice/Centinela, Culver/Centinela, Jefferson/Centinela, and Manchester/Sepulveda with its southern terminus station at LAX/Metro Transit Center station. A 31-minute ride. 229,000
Alternative 3: HRT Sepulveda route A heavy rail transit (HRT) line heading south underground from the Expo/Sepulveda station along Sepulveda Boulevard with stops at Venice/Sepulveda, Jefferson/Sepulveda and Manchester/Sepulveda near LAX. The southern terminus station is at LAX/Metro Transit Center station. A 30-minute ride. 236,000
Alternative 4: HRT Overland Avenue route A heavy rail transit (HRT) line heading south underground from the Expo/Sepulveda station to Overland Avenue. Stations located on Overland/Venice Blvd. and Overland/Jefferson Blvd, Jefferson/Sepulveda, and Manchester/Sepulveda near LAX. The southern terminus station is at LAX/Metro Transit Center station. A 31-minute ride. 233,000
Alternative 5: D Line Extension routes A heavy rail transit (HRT) extension south of the under-construction D Line extension terminus station of Westwood/VA Hospital station or Westwood/UCLA station, a stop on Santa Monica Boulevard and then follow the Centinela Ave route alternative (alt 2) as underground HRT. The southern terminus station is at LAX/Metro Transit Center station. A 31-minute ride. 275,000

Alternative details

The following table shows all potential metro stations and the alternatives for which they apply:

Station Options Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Connecting
rail services
Community
Westwood/UCLA or Westwood/VA Hospital (Under Construction as HRT) - - - - checkY  D Line (NET 2027) Westwood
Expo/Bundy or Expo/Sepulveda (Already Built as LRT) checkY checkY checkY checkY checkY  E Line West Los Angeles
Venice Boulevard/I-405 checkY - - - - Mar Vista/Westdale
Venice Boulevard/Overland Avenue - checkY - - checkY Mar Vista
Venice Boulevard/Sepulveda Boulevard - - checkY - - Mar Vista/Westdale
Venice Boulevard/Overland Avenue - - - checkY - Washington Culver
Jefferson Boulevard/Overland Avenue - - - checkY - Studio Village
Culver Boulevard - checkY - - checkY Del Rey/Culver West
Slauson Avenue/Sepulveda Boulevard - - checkY checkY - Fox Hills
Jefferson Boulevard/Centinela Avenue - checkY - - checkY Playa Vista
Howard Hughes Center checkY - - - - Westchester/Fox Hills
Manchester Avenue/Sepulveda Boulevard checkY checkY checkY checkY checkY Westchester
LAX/Metro Transit Center (Under Construction as LRT) checkY checkY checkY checkY checkY LAX Automated People Mover (2025)
 K Line (2024)
Westchester

Alternative 5's concept for the Westside-LAX phase of the Sepulveda Transit Corridor Project would extend the Purple Line subway south down Centinela Ave along the same route as the other proposed Centinela Ave concepts (Alt 2). This concept would provide a one-seat ride from the LAX Automated People Mover to Downtown Los Angeles but would require passengers from the San Fernando Valley to transfer at Westwood/UCLA station to travel further south.

The second phase of the Sepulveda Transit Corridor Project is not due to break ground until 2048.

Advocacy

Transit advocates have proposed combining the East San Fernando Valley Light Rail Transit Project and the Sepulveda Transit Corridor Project into a single study to connect Sylmar, Van Nuys, the G Line, Sherman Oaks, UCLA, and the future Westwood/UCLA D Line station. Metro studies declined the LRT merge option and stated HRT would provide faster times and more occupancy on trains. Future extension phases south to the E Line, LAX, South Bay, or beyond are also being advocated and proposed. Metro proposed a Centinela Avenue route to LAX or thru Sepulveda Boulevard. No studies have been allocated funds.

Phase 1 of the project is part of Metro's Twenty-eight by '28 initiative, which aims to complete its list of expansions in time for the 2028 Summer Olympics. Metro is looking into a public/private partnership to accelerate the opening.

References

  1. ^ "Rail concepts released for Sepulveda Transit Corridor project". Metro.
  2. "I-405 In LA Named Busiest Interstate In Any U.S. City". CBS Los Angeles. CBS Broadcasting Inc. August 20, 2013. Retrieved July 7, 2017.
  3. Nagourney, Adam (December 20, 2016). "Los Angeles Drivers on the 405 Ask: Was $1.6 Billion Worth It?". New York Times. Archived from the original on December 22, 2016. Retrieved December 16, 2024.
  4. "Maps & Schedules". LA Metro. Retrieved August 21, 2023.
  5. "Maps & Schedules". LA Metro. Retrieved August 21, 2023.
  6. "About LAX/Metro Transit Center Station – Metro K Line". Retrieved January 18, 2024.
  7. "LAX/Metro Transit Center Station". Metro. Retrieved January 17, 2024.
  8. "Line 6 - Sepulveda Blvd". www.culvercitybus.com. Retrieved January 18, 2024.
  9. ^ "Here are the four new refined concepts for Sepulveda Transit Corridor". Metro. January 29, 2019. Retrieved August 19, 2020.
  10. Hymon, Steve (April 26, 2017). "Of monorails, Measure M and the Sepulveda Pass; How We Roll, June 14". LACMTA. Retrieved July 1, 2017.
  11. "Metro Seeks Mass Transit Solution For Sepulveda Pass". CBS Los Angeles. CBS Broadcasting. April 26, 2017. Retrieved August 1, 2017.
  12. Sotero, Dave (April 26, 2017). "Metro releases RFP to study Sepulveda Pass transit options". LACMTA. Retrieved July 1, 2017.
  13. Sharp, Steven (November 27, 2018). "Here are the 28 Projects that Metro Could Complete Before the 2028 Olympics". Urbanize. Retrieved July 2, 2018.
  14. Grigoryants, Olga (June 9, 2018). "LA Metro releases concepts for a rail line through, over, or under Sepulveda Pass. Take your pick". Los Angeles Daily News. Retrieved July 2, 2018.
  15. http://media.metro.net/projects_studies/sfv-405/images/Feasibility%20Report.pdf
  16. "The Center for Land Use Interpretation".
  17. Sotero, Dave (February 12, 2021). "L.A. Metro Releases its Recommendation to Contract with Two Private Sector Teams for Pre-Development Work on the Sepulveda Transit Corridor Project" (Press release). The Source. Los Angeles County Metropolitan Transportation Authority. Retrieved February 14, 2021.
  18. Sharp, Steven (December 3, 2021). "Metro kicks off EIR for Sepulveda Pass rail line". Urbanize.LA. Retrieved December 6, 2021.
  19. https://www.appropriations.senate.gov/imo/media/doc/Division%20L%20-%20THUD%20Statement%20FY23.pdf
  20. "Sepulveda Transit Corridor Fact Sheet" (PDF). www.metro.net. LA Metro. Retrieved December 16, 2024.
  21. "Team". Sepulveda Transit Corridor Partners. Retrieved December 16, 2024.
  22. "About LA SkyRail". LA SkyRail Express. Archived from the original on November 21, 2024. Retrieved December 16, 2024.
  23. Sotero, Dave (March 25, 2021). "Contracts for Pre-Development Work on Sepulveda Transit Project approved by Metro Board". The Source. Metro. Retrieved March 26, 2020.
  24. "Here are five route alternatives that will be studied for Sepulveda Transit Corridor". April 15, 2021.
  25. ^ https://thesource.metro.net/wp-content/uploads/2019/01/Refined-Concepts.jpg
  26. "Fall 2023 FINAL Presentation for Upload.pdf" (PDF). Dropbox. Retrieved December 12, 2023.
  27. ^ Next stop: exploring alternatives to the 405 (Report). Metro. June 2018. Retrieved August 19, 2019.
  28. @numble (October 25, 2023). "October 2023 LA Metro presentation on Sepulveda Transit Corridor. Monorail options have 21k-57k fewer riders, are 8-14 minutes slower, and have longer travel times when connecting to other lines. Heavy rail options 4-5 have ~15k more riders than option 6" (Tweet) – via Twitter.
  29. "July 3, 2024" (PDF). Metro. Retrieved July 9, 2024.
  30. "We're exploring alternatives to the 405. Sepulveda Transit Corridor Project". Los Angeles County Metropolitan Transportation Authority. Retrieved January 8, 2022.
  31. "Bus and Rail System Map" (PDF). Los Angeles County Metropolitan Transportation Authority. Retrieved December 3, 2018.
  32. ^ Next stop: exploring alternatives to the 405 (Report). Metro. July 2019. Retrieved August 19, 2019.
  33. "UCLA advocates for campus station on Metro's proposed Sepulveda rail line". ucla.edu. UCLA. February 24, 2022. Retrieved December 18, 2024.
  34. Scauzillo, Steve (June 21, 2022). "Public says: 93% favor rail tunnels, not an overhead monorail, for mega Sepulveda Pass project". Los Angeles Daily News.
  35. @numble (June 17, 2022). "LA Metro June 2022 update on Sepulveda rail project. 93% of comments in scoping period supported heavy rail, and 7% supported monorail. Connection to UCLA was the most mentioned topic. The next update in the Fall would be an update on alignments and stations" (Tweet) – via Twitter.
  36. "20221207_Sepulveda_Transit_Corridor_Project_Survey.PDF".
  37. @numble (October 19, 2023). "Sherman Oaks Homeowners Association asks Laura Friedman (California Assembly Transportation Chair) about LA Metro's Sepulveda project. She says it should go to UCLA, is rider-centric, does not have people stand in middle of highway. She wants to build consensus on the project" (Tweet) – via Twitter.
  38. Scauzillo, Steve (December 19, 2022). "Rep. Brad Sherman jumps into debate over proposed Metro tunnels in Bel Air". Los Angeles Daily News. Archived from the original on December 22, 2022. Retrieved December 18, 2024.
  39. Baum, Gary (January 29, 2024). "Train Wreck? A Mogul's Battle Against The Bel-Air Subway". The Hollwood Reporter. Archived from the original on April 7, 2024. Retrieved December 18, 2024.
  40. ^ https://media.metro.net/projects_studies/sfv-405/images/presentation_Sepulveda_HNTB_2019-01.pdf
  41. "Bus and Rail System Map" (PDF). Los Angeles County Metropolitan Transportation Authority. Retrieved December 3, 2018.
  42. Reed, Bart. "Valley-Westside Rail Tunnel". The Transit Coalition. Retrieved April 12, 2011.

Notes

  1. Alternatives 4 and 5 only differ in how they treat the Sherman Way, G Line, and Ventura Boulevard stations. Alternative 4 has them as elevated stations, while Alternative 5 lists them as underground.

External links

Los Angeles County Metropolitan Transportation Authority (Metro)
Services
Metro Rail
Light rail
Rapid transit
Metro Busway
Metro Bus
Other
Stations
Bus lanes
Capital projects
Under construction
Planned
Fleet
Other information
Categories: