Revision as of 07:29, 7 November 2024 editJJMC89 bot III (talk | contribs)Bots, Administrators3,666,242 editsm Moving Category:Buildings and structures demolished in 2022 to Category:Buildings and structures destroyed in 2022 per Misplaced Pages:Categories for discussion/Log/2024 October 29#Category:Buildings and structures by year of demolitionTag: Reverted← Previous edit | Latest revision as of 16:48, 23 December 2024 edit undoMackensen (talk | contribs)Autopatrolled, Administrators125,026 edits →External links: c/e | ||
(One intermediate revision by one other user not shown) | |||
Line 61: | Line 61: | ||
|bridge signs = ] | |bridge signs = ] | ||
|upstream = ] | |upstream = ] | ||
|upstream signs = |
|upstream signs = | ||
|downstream = ] | |downstream = ] | ||
|downstream signs = | |downstream signs = | ||
Line 67: | Line 67: | ||
] | ] | ||
] | ] | ||
] | ] | ||
] | ] |
Latest revision as of 16:48, 23 December 2024
Bridge in New Jersey, US
Wittpenn Bridge | |
---|---|
Current span of the bridge | |
Coordinates | 40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge) |
Carries | Route 7 Future East Coast Greenway |
Crosses | Hackensack River |
Locale | Jersey City and Kearny, New Jersey |
Official name | Wittpenn Bridge |
Other name(s) | Route 7 Bridge |
Maintained by | New Jersey Department of Transportation |
ID number | 0909150 |
Characteristics | |
Design | Lift bridge |
Total length | 2,169 feet (661 m) |
Width | 40 feet (12 m) |
Longest span | 83 feet (25 m) |
Clearance below | 35 feet (11 m) (lowered) 100 feet (30 m) (raised) |
History | |
Opened | November 5, 1930 (original bridge) October 2, 2021 (replacement bridge) |
Location | |
The Wittpenn Bridge is a vertical-lift bridge that carries New Jersey Route 7 over the Hackensack River in Jersey City and Kearny, in Hudson County, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge has an annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks. In 2005, the bridge was raised 80 times to accommodate boats passing underneath. The original span opened in 1930; its replacement opened in 2021.
Original structure
The original bridge carried four 10-foot-wide (3.0 m) lanes, extended 2,169 feet (661 m) and stood 35 feet (11 m) above mean high water with a 209-foot (64 m) main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. When raised, the bridge provided 100 feet (30 m) of clearance for ships. Raising the lift span required 15 minutes. Following the opening of the 2021 span, demolition work commenced on this span with work being substantially complete by March 2022.
Replacement
The New Jersey Department of Transportation (NJDOT) replaced the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011. The new span opened in 2021, and all associated project work is expected to be completed in 2022. The new bridge is situated just north of the existing bridge.
The reconstruction of the bridge was partially funded by the Port Authority of New York and New Jersey. In November 2018, the Federal Aviation Agency (FAA) investigated a complaint raised by United Airlines that the fees they were paying for Newark Airport use were being diverted to roadway and bridge projects such as the Wittpenn Bridge which are not owned or operated by the Port Authority.
In October 2020 the third and final section of the orthotropic bridge deck was hoisted into place, partially built on the former overpass that carried US US 1-9 truck, which now carries both routes instead. The bridge opened on October 2, 2021.
In addition to Route 7, the new span carries the East Coast Greenway, a long-distance biking and walking trail, and the Meadowlands Connector, a New Jersey biking and walking trail that links Hudson and Essex counties.
See also
References
- "Historic Bridge Survey (1991–1994)" (PDF). NJDOT. 2001. Retrieved March 26, 2013.
- ^ Franklin, Thomas E. (April 11, 2005). "Picture this: Drawbridge Operator". The Record. Archived from the original on March 8, 2006.
- Thomas, William (March 30, 2022). "Engineered Rigging overcomes bridge demolition challenges". Move It Magazine. Retrieved April 4, 2022.
- McDonald, Terrence T. (December 21, 2016). "5 years done, 6 to go for new $480M Wittpenn Bridge".
- Conti Group (2011). "Conti to Kick off Wittpenn Bridge Repairs" 2011-07-18.
- Higgs, Larry (May 14, 2015). "Another new bridge quietly rises in shadow of the Pulaski Skyway". NJ.com.
- Higgs, Larry (January 29, 2019). "Feds question Port Authority's use of airline fees to fund bridge projects". NJ.com.
- Higgs, Larry (October 11, 2020). "Section of new Wittpenn Bridge hoisted into place -- but it's not ready to open yet".
- Canessa Jr., Kevin (September 21, 2021). "New Wittpenn Bridge is opening Oct. 1 and it's welcome news for Hudson drivers". NJ.com. The Jersey Journal. Retrieved September 27, 2021.
- Strunsky, Steve (October 2, 2021). "New Wittpenn Bridge opens after 10 years and half a billion dollars". nj. Retrieved October 3, 2021.
- Strunsky, Steve (March 27, 2017). "New bike, walking trail would link N.J.'s 2 largest cities". Retrieved March 27, 2017.
External links
- Media related to Wittpenn Bridge at Wikimedia Commons
- Wittpenn Bridge at Bridges & Tunnels
- Wittpenn Bridge Replacement Project at New Jersey Department of Transportation
- Wittpenn Bridge at NYCroads.com
- Wittpenn Bridge at Structurae
Crossings of the Hackensack River | ||||
---|---|---|---|---|
|