Misplaced Pages

Inner Ring Line: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 23:26, 13 December 2024 editShreyasvashistha (talk | contribs)164 edits stationTags: Mobile edit Mobile web edit← Previous edit Revision as of 11:30, 27 December 2024 edit undoFooty2000 (talk | contribs)Extended confirmed users16,047 edits Proposed stationsTags: Mobile edit Mobile web edit Advanced mobile editNext edit →
(47 intermediate revisions by 9 users not shown)
Line 1: Line 1:
{{More sources|date=December 2024}}
{{Short description|Proposed line of Bengaluru's Namma Metro}} {{Short description|Proposed loop metro line in Karnataka, India}}
{{Use dmy dates|date=November 2021}}
{{Use Indian English|date=November 2021}} {{Use dmy dates|date=December 2024}}
{{Use Indian English|date=December 2024}}
{{Infobox rail line {{Infobox rail line
| color =
| name = Inner Ring Line
| other_name =
| box_width = | box_width =
| name = Inner Ring Road Line
| color = {{rcr|Noida Metro|Aqua}}
| logo = | logo =
| logo_width = 150 | logo_width =
| logo_alt = | logo_alt =
| image = | image =
Line 13: Line 15:
| image_alt = | image_alt =
| caption = | caption =
| other_name =
| native_name = | native_name =
| native_name_lang = | native_name_lang =
| type = ] | type = ]
| system = ] | system = ]
| status = Planned | status = Proposed
| locale = ], ], India | locale = ], ], India
| start = {{stl|Namma Metro|Yeshwanthpur}} | start = {{stl|Namma Metro|Yeshwanthpur}} (proposed)
| end | end =
| connectinglines = '''''Operational''''' (1) {{rcb|Namma Metro|Purple|croute}} <br>'''''Upcoming''''' (3):</br>{{rcb|Namma Metro|Pink|croute}} {{rcb|Namma Metro|Green|croute}} {{rcb|Namma Metro|Red|croute}}{{rcb|Namma Metro|Grey|croute}} | connectinglines = '''''Operational''''' (1) {{rcb|Namma Metro|Purple|croute}} <br>'''''Upcoming''''' (3):<br />{{rcb|Namma Metro|Pink|croute}} {{rcb|Namma Metro|Green|croute}} {{rcb|Namma Metro|Red|croute}}{{rcb|Namma Metro|Grey|croute}}
| stations = 22 | stations = 22 (proposed)
| routes = | routes =
| daily_ridership = | daily_ridership =
Line 62: Line 63:
| elevation = | elevation =
| racksystem = | racksystem =
| routenumber = | routenumber =
| map = | map =
| map_state = collapsed | map_state = collapsed
Line 68: Line 69:
}} }}


The '''Inner Ring Line''' is a proposed ] ] for the ]'s network in the city of ], ], ]. The proposed loop line features 22 stations and Six to Eight interchanges with other lines. A study by ] (IISc) has projected that the loop line would increase the overall ridership of Namma Metro by 77 percent.<ref>{{Cite web |title=Bengaluru traffic: IISc bats for Inner Ring underground Metro over DKS’ tunnel road plan |url=https://www.moneycontrol.com/news/business/bengaluru-traffic-iisc-bats-for-inner-ring-underground-metro-over-dks-tunnel-road-plan-11612841.html |archive-url=http://web.archive.org/web/20241209173933/https://www.moneycontrol.com/news/business/bengaluru-traffic-iisc-bats-for-inner-ring-underground-metro-over-dks-tunnel-road-plan-11612841.html |archive-date=2024-12-09 |access-date=2024-12-15 |website=Moneycontrol |language=en-US}}</ref>
The '''Inner ring Road Line''' is a proposed ] ] that will become part of ]'s network in the city of ], ], ]. Namma Metro has been planned to become operational around the year 2030.


IISC has recommended the loop line as a better alternative for ]'s proposal of city wide tunnel roads.<ref>{{Cite web |title=Bengaluru traffic: IISc bats for Inner Ring underground Metro over DKS’ tunnel road plan |url=https://www.moneycontrol.com/news/business/bengaluru-traffic-iisc-bats-for-inner-ring-underground-metro-over-dks-tunnel-road-plan-11612841.html |archive-url=http://web.archive.org/web/20241209173933/https://www.moneycontrol.com/news/business/bengaluru-traffic-iisc-bats-for-inner-ring-underground-metro-over-dks-tunnel-road-plan-11612841.html |archive-date=2024-12-09 |access-date=2024-12-15 |website=Moneycontrol |language=en-US}}</ref>
== See also ==
* ]
** ]
** ]
** ]
** ]
** ]
** ]
** ]
* ]
* ]


==Funding== == Funding ==
The proposal to build Metro along the city's ] was mentioned in the government's Comprehensive Mobility Plan (CMP) 2031. It is unclear if the 34-km underground line, which is expected to cost about ₹ 10,000 crore, will be a part of Namma Metro’s upcoming Phase III expansions. The Bangalore Metro Rail Corporation Ltd (BMRCL) is yet to finalise the new lines including the Inner Ring Line.<ref>{{Cite web|first=Naveen |last=Menezes |title=On the horizon? A 34-km Metro line on Inner Ring Road |url=https://bangaloremirror.indiatimes.com/bangalore/others/on-the-horizon-a-34-km-metro-line-on-inner-ring-road/articleshow/74260938.cms |access-date=2024-12-15 |website=Bangalore Mirror |language=en}}</ref>


== Proposed stations ==
==station==
{|class="wikitable" style="text-align: center;" width="65%" {|class="wikitable" style="text-align: center;" width="65%"
|- |-
! colspan="5" align="center" style="background:#{{rcr|Noida Metro|Aqua}};" |<span style="color:Black;">'''Inner Ring Road'''</span> ! colspan="5" align="center" style="background:#;" |'''Inner Ring Line'''
|- |-
! rowspan="2"|# ! rowspan="2"|#
Line 97: Line 89:
|- |-
|1 |1
|Yeshwanthpura TTMC |]
|'''ಯಶವಂತಪುರ ಟಿಟಿಎಂಸಿ''' |]
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Green|croute}}{{rint|bus}}Yeshwanthpura |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Green|croute}}{{rint|bus}}Yeshwanthpura
|Underground |Underground
|- |-
|2 |2
|Indian Institute Of Science
|Sadashivnagara
|'''ಭಾರತೀಯ ವಿಜ್ಞಾನ ಸಂಸ್ಥೆ'''
|'''ಸದಾಶಿವನಗರ'''
| |
|Underground |Underground
Line 115: Line 107:
|- |-
|4 |4
|Jaya Chamarajendra nagara |Jaya Chamarajendra Nagara
|'''ಜಯ ಚಾಮರಾಜೇಂದ್ರ ನಗರ''' |'''ಜಯ ಚಾಮರಾಜೇಂದ್ರ ನಗರ'''
| |
Line 121: Line 113:
|- |-
|5 |5
|Jayamahal (Nandi durga road) |Jayamahal (Nandi Durga Road)
|'''ಜಯಮಹಲ್ (ನಂದಿದುರ್ಗಾ ರಸ್ತೆ)''' |'''ಜಯಮಹಲ್ (ನಂದಿದುರ್ಗಾ ರಸ್ತೆ)'''
| |
Line 127: Line 119:
|- |-
|6 |6
|Cantonment Railway Station ||]
|'''ದಂಡು ರೈಲು ನಿಲ್ದಾಣ''' |]
|{{rint|bengaluru|metro}} |{{rint|bengaluru|metro}}
{{rcb|Namma Metro|Pink|croute}} {{rcb|Namma Metro|Pink|croute}}
Line 146: Line 138:
|- |-
|9 |9
||]||]
|Indranagara
|'''ಇಂದಿರಾನಗರ'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Purple|croute}} |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Purple|croute}}
|Elevated |Elevated
Line 164: Line 155:
|- |-
|12 |12
|Ejipura
|'''ಈಜಿಪುರ'''
|
|Elevated
|-
|13
|St John's Hospital |St John's Hospital
|'''ಸೇಂಟ್ ಜಾನ್ಸ್ ಆಸ್ಪತ್ರೆ''' |'''ಸೇಂಟ್ ಜಾನ್ಸ್ ಆಸ್ಪತ್ರೆ'''
Line 169: Line 166:
|Elevated |Elevated
|- |-
|13 |14
|Forum Mall |Forum Mall
|'''ಪುರಂ ಮಾಲು''' |'''ಪುರಂ ಮಾಲು'''
Line 175: Line 172:
|Elevated |Elevated
|- |-
|14 |15
|Dairy Circle ||{{stl|Namma Metro|Dairy Circle}}
|]
|'''ಹೈನುಗಾರಿಕೆ ವೃತ್ತ'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Pink|croute}} |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Pink|croute}}<br>{{rcb|Namma Metro|Red|croute}}<br />
|Elevated |Elevated
|- |-
|15 |16
|Wilson Garden |Wilson Garden
|'''ವಿಲ್ಸನ್ ಗಾರ್ಡನ್''' |'''ವಿಲ್ಸನ್ ಗಾರ್ಡನ್'''
Line 187: Line 184:
|Elevated |Elevated
|- |-
|16 |17
||]|| ]
|Lalbagh
|'''ಲಾಲ್ಬಗ್'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Green|croute}} |{{rint|bengaluru|metro}} {{rcb|Namma Metro|Green|croute}}
|Elevated |Elevated
|- |-
|17 |18
|Basavanagudi |Basavanagudi
|'''ಬಸವನಗುಡಿ''' |'''ಬಸವನಗುಡಿ'''
Line 199: Line 195:
|Underground |Underground
|- |-
|18 |19
|Gavipura Extension |Gavipura Extension
|'''ಗವಿಪುರ ವಿಸ್ತರಣೆ''' |'''ಗವಿಪುರ ವಿಸ್ತರಣೆ'''
Line 205: Line 201:
|Underground |Underground
|- |-
|19 |20
|Gopalan mall sirsi circle |Gopalan mall sirsi circle
|'''ಗೋಪಾಲನ್ ಮಾಲ್ ಸಿರ್ಸಿ ವೃತ''' |'''ಗೋಪಾಲನ್ ಮಾಲ್ ಸಿರ್ಸಿ ವೃತ'''
| |
|Underground |Underground
|-
|20
|Hosahalli Toll gate
|'''ಹೊಸಹಳ್ಳಿ ಟೋಲ್ ಗೇಟ್'''
||{{rint|bengaluru|metro}} {{rcb|Namma Metro|Purple|croute}}<br>{{rcb|Namma Metro|Grey|croute}}</br>
|Elevated
|- |-
|21 |21
|]
|]
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Purple|croute}}<br>{{rcb|Namma Metro|Grey|croute}}<br />
|Underground
|-
|22
|Dhobi ghat junction |Dhobi ghat junction
|'''ದೋಭಿ ಘಾಟ್ ಜಂಕ್ಷನ್''' |'''ದೋಭಿ ಘಾಟ್ ಜಂಕ್ಷನ್'''
| |
|Underground
|Elevated
|- |-
|22 |23
|]|| |]
|Iskcon Temple(Mahalaksmi)
|'''ಇಸ್ಕಾನ್ ದೇವಾಲಯ (ಮಹಾಲಕ್ಷ್ಮಿ)'''
||{{rint|bengaluru|metro}} {{rcb|Namma Metro|Green|croute}} ||{{rint|bengaluru|metro}} {{rcb|Namma Metro|Green|croute}}
|Underground
|Elevated
|} |}

== See also ==
* ]
** ]
** ]
** ]
** ]
** ]
** ]
** ]
* ]
* ]

==References==
{{Reflist}}
{{Namma Metro|all=yes}}

]
]

Revision as of 11:30, 27 December 2024

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Inner Ring Line" – news · newspapers · books · scholar · JSTOR (December 2024) (Learn how and when to remove this message)
Proposed loop metro line in Karnataka, India

Inner Ring Line
Overview
StatusProposed
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
TerminiYeshwanthpur (proposed)
Connecting linesOperational (1) Purple Line
Upcoming (3):
Pink Line Green Line Red LineGrey Line
Stations22 (proposed)
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
Depot(s)(TBC)
History
Planned opening2030; 5 years' time (2030) (TBC)
Technical
Line length34 km (21 mi)
Number of tracks2
Character(TBC)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail

The Inner Ring Line is a proposed metro rail line for the Namma Metro's network in the city of Bangalore, Karnataka, India. The proposed loop line features 22 stations and Six to Eight interchanges with other lines. A study by Indian Institute of Science (IISc) has projected that the loop line would increase the overall ridership of Namma Metro by 77 percent.

IISC has recommended the loop line as a better alternative for Government of Karnataka's proposal of city wide tunnel roads.

Funding

The proposal to build Metro along the city's Inner Ring Road was mentioned in the government's Comprehensive Mobility Plan (CMP) 2031. It is unclear if the 34-km underground line, which is expected to cost about ₹ 10,000 crore, will be a part of Namma Metro’s upcoming Phase III expansions. The Bangalore Metro Rail Corporation Ltd (BMRCL) is yet to finalise the new lines including the Inner Ring Line.

Proposed stations

Inner Ring Line
# Station name Connections Station layout
(TBC)
English Kannada
1 Yeshwanthpura TTMC ಯಶವಂತಪುರ ಟಿಟಿಎಂಸಿ Green LineBus interchangeYeshwanthpura Underground
2 Indian Institute Of Science ಭಾರತೀಯ ವಿಜ್ಞಾನ ಸಂಸ್ಥೆ Underground
3 Mekhri Circle ಮೇಖ್ರಿ ವೃತ್ತ Red Line Underground
4 Jaya Chamarajendra Nagara ಜಯ ಚಾಮರಾಜೇಂದ್ರ ನಗರ Underground
5 Jayamahal (Nandi Durga Road) ಜಯಮಹಲ್ (ನಂದಿದುರ್ಗಾ ರಸ್ತೆ) Underground
6 Cantonment Railway Station ದಂಡು ರೈಲ್ವೇ ನಿಲ್ದಾಣ

Pink Line

Elevated
7 Halasuru lake ಹಲಸೂರು ಕೆರೆ Elevated
8 Indranagara BDA Complex ಇಂದಿರಾನಗರ ಬಿಡಿಎ ಕಾಂಪ್ಲೆಕ್ಸ್ Elevated
9 Indiranagar ಇಂದಿರಾನಗರ Purple Line Elevated
10 Domaluru ದೊಮ್ಮಲೂರು Elevated
11 Embassy Golf Link ಎಮ್ಬಿಸಿ ಗರ್ಲ್ಸ್ ಲಿಂಕ್ Elevated
12 Ejipura ಈಜಿಪುರ Elevated
13 St John's Hospital ಸೇಂಟ್ ಜಾನ್ಸ್ ಆಸ್ಪತ್ರೆ Elevated
14 Forum Mall ಪುರಂ ಮಾಲು Elevated
15 Dairy Circle ಡೈರಿ ಸರ್ಕಲ್ Pink Line
Red Line
Elevated
16 Wilson Garden ವಿಲ್ಸನ್ ಗಾರ್ಡನ್ Elevated
17 Lalbagh ಲಾಲ್ಬಾಗ್ Green Line Elevated
18 Basavanagudi ಬಸವನಗುಡಿ Underground
19 Gavipura Extension ಗವಿಪುರ ವಿಸ್ತರಣೆ Underground
20 Gopalan mall sirsi circle ಗೋಪಾಲನ್ ಮಾಲ್ ಸಿರ್ಸಿ ವೃತ Underground
21 Hosahalli Toll Gate ಹೊಸಹಳ್ಳಿ ಟೋಲ್ ಗೇಟ್ Purple Line
Grey Line
Underground
22 Dhobi ghat junction ದೋಭಿ ಘಾಟ್ ಜಂಕ್ಷನ್ Underground
23 Iskcon Temple (Mahalakshmi) ಇಸ್ಕಾನ್ ದೇವಾಲಯ (ಮಹಾಲಕ್ಷ್ಮಿ) Green Line Underground

See also

References

  1. "Bengaluru traffic: IISc bats for Inner Ring underground Metro over DKS' tunnel road plan". Moneycontrol. Archived from the original on 9 December 2024. Retrieved 15 December 2024.
  2. "Bengaluru traffic: IISc bats for Inner Ring underground Metro over DKS' tunnel road plan". Moneycontrol. Archived from the original on 9 December 2024. Retrieved 15 December 2024.
  3. Menezes, Naveen. "On the horizon? A 34-km Metro line on Inner Ring Road". Bangalore Mirror. Retrieved 15 December 2024.
  4. Vivan, Sridhar (15 October 2024). "Green signal for Namma Metro phase 3A project". Bangalore Mirror. Retrieved 15 October 2024.
Namma Metro
Purple Line 1
Green Line 2
Yellow Line 3
Awaiting
Trainsets
Planned
  • Narayana Hospital
  • Chandapura
  • Attibele Industrial Area
  • Attibele
  • Zuzuvadi
  • Hosur SIPCOT Park 1
  • Hosur Bus Terminal Interchange
  • Hosur SIPCOT Park 2
Pink Line 4
Phase-2
Phase-1
Blue Line 5
Phase-2A
Phase-2B
Not In scope
  • ** Line(s) and stations which are approved & under construction
Orange Line 6 **
ORR-West Line
Hosahalli-Kadabagere Line
Red Line 7 **
  • Hebbala
  • Ganga Nagar
  • Veterinary College
  • Mekhri Circle
  • Guttahalli Palace
  • Bengaluru Golf Course
  • Basaveshwara Circle
  • KR Circle
  • Town Hall
  • Shanthinagar
  • NIMHANS
  • Dairy Circle
  • Koramangala II Block
  • Koramangala Ill Block
  • Jakkasandra
  • Agara
  • Ibbaluru
  • Bellandur Gate
  • Kaikondrahalli
  • Doddakannelli
  • Carmelaram
  • Ambedkar Nagar
  • Kodathi Gate
  • Muthanalluru Cross
  • Dommasandra
  • Sompura
  • Kada Agrahara Road
  • Sarjapura
Depot(s)
  • Kadugodi & Challaghatta (U/C)
  • Peenya
  • Silk Institute (Anjanapura) (U/C)
  • Hebbagodi
  • Kothanur
  • Baiyappanahalli & Doddajala
  • Sumanahalli (TBC)
  • Sarjapura (TBC)
See also
*Stations in italics are Under Construction
Categories: