Revision as of 15:37, 26 October 2008 editTassedethe (talk | contribs)Autopatrolled, Administrators1,365,584 editsm Disambiguate Geoff Wilson to Geoff Wilson (Australian politician) using popups← Previous edit | Revision as of 00:30, 14 November 2008 edit undoPhanly (talk | contribs)Extended confirmed users1,291 edits added re greenhouse gas reduction targetsNext edit → | ||
Line 7: | Line 7: | ||
The fuel source is the Kogan Creek coal deposit, which is also owned by CS Energy and will provide 2.8 million tonnes of coal annually. <ref>. Retrieved on 23 November 2007.</ref> . The coal will be delivered to the power station via a 4 km long ]. The coal mine is operated by Golding Contractors, who has a contract to run the mine until 2018.<ref>. Golding Contractors. Retrieved on 6 April 2008.</ref> | The fuel source is the Kogan Creek coal deposit, which is also owned by CS Energy and will provide 2.8 million tonnes of coal annually. <ref>. Retrieved on 23 November 2007.</ref> . The coal will be delivered to the power station via a 4 km long ]. The coal mine is operated by Golding Contractors, who has a contract to run the mine until 2018.<ref>. Golding Contractors. Retrieved on 6 April 2008.</ref> | ||
The power station emits 4.33 million tonnes of greenhouse gases each year |
The power station emits 4.33 million tonnes of ] each year<ref>. Carbon Monitoring for Action. Retrieved on 23 November 2007</ref> as a result of burning ]. Greenhouse gases are responsible for ]. The ] says that developed countries should reduce greenhouse gas emissions by 25 to 40% by 2020 and by 80 to 95% by 2050. <ref> {{cite report|url=http://www.ipcc.ch/pdf/assessment-report/ar4/wg3/ar4-wg3-chapter13.pdf |author=, |title=IPCC Fourth Assessment Report Working Group III Report "Mitigation of Climate Change" |publisher=Intergovernmental Panel on Climate Change, Working Group III, p776 Ch13 Policies, Instruments and Co-operative Arrangements |accessdate=2008-11-14 |format=pdf}}</ref>. The Australian government has announced a target for reduction of greenhouse gas emissions of 60% from 2000 levels by 2050.<ref> | ||
{{cite web |url=http://www.climatechange.gov.au/international/kyoto/index.html |last = |first = |coauthors = |title = Kyoto Protocol |work = |accessdate=2008-11-14 |date= |publisher=Australian Government, Department of Climate Change}} | |||
</ref> because of the harmful ]. | |||
A 28 km, 275kV ] connects the power station to the ] where it provides power to ] and ]. | A 28 km, 275kV ] connects the power station to the ] where it provides power to ] and ]. | ||
Line 15: | Line 17: | ||
{{portal|Queensland}} | {{portal|Queensland}} | ||
*] | *] | ||
*] | |||
==References== | ==References== |
Revision as of 00:30, 14 November 2008
The Kogan Creek Power Station is a 785 megawatt coal fired power station owned by CS Energy on the Darling Downs in Queensland. The $1.2 billion plant is situated in the Surat Basin between Dalby and Chinchilla.
Kogan Creek is the largest single unit generator in Australia and was opened by the Queensland Premier Anna Bligh and Minister for Mines and Energy Geoff Wilson on 27 November 2007.
The power station uses supercritical steam technology and air cooled surface condensers which reduces water consumption. The plant consumes 90% less water when compared to conventional power stations through the use of dry cooling technology.
The fuel source is the Kogan Creek coal deposit, which is also owned by CS Energy and will provide 2.8 million tonnes of coal annually. . The coal will be delivered to the power station via a 4 km long conveyor belt. The coal mine is operated by Golding Contractors, who has a contract to run the mine until 2018.
The power station emits 4.33 million tonnes of greenhouse gases each year as a result of burning coal. Greenhouse gases are responsible for climate change. The IPCC says that developed countries should reduce greenhouse gas emissions by 25 to 40% by 2020 and by 80 to 95% by 2050. . The Australian government has announced a target for reduction of greenhouse gas emissions of 60% from 2000 levels by 2050. because of the harmful effects of global warming on Australia.
A 28 km, 275kV transmission line connects the power station to the National Electricity Market where it provides power to Queensland and New South Wales.
See also
References
- Drought proof generator powers Queensland growth. Ministerial Media Statement. 27 November 2007. Retrieved on 4 December 2007.
- Media Release. Kogan Creek Power Station Project Commences. CS Energy. 20 May 2004. Retrieved on 23 November 2007.
- Kogan Creek coal-fired power station, Queensland Australia. Retrieved on 23 November 2007.
- Golding Contractors Mining and Civil Construction Projects. Golding Contractors. Retrieved on 6 April 2008.
- Kogan Creek Power Plant: Plant overview. Carbon Monitoring for Action. Retrieved on 23 November 2007
- ,. IPCC Fourth Assessment Report Working Group III Report "Mitigation of Climate Change" (pdf) (Report). Intergovernmental Panel on Climate Change, Working Group III, p776 Ch13 Policies, Instruments and Co-operative Arrangements. Retrieved 2008-11-14.
{{cite report}}
:|author=
has numeric name (help)CS1 maint: extra punctuation (link) -
"Kyoto Protocol". Australian Government, Department of Climate Change. Retrieved 2008-11-14.
{{cite web}}
: Cite has empty unknown parameter:|coauthors=
(help)
Energy in Queensland | |
---|---|
Proposed power stations | |
Coal | |
Gas/kerosene | |
Major hydro | |
Minor hydro | |
Wind farms | |
Solar power stations | |
Companies | |
Regulators | |
Market operator | |
Historical | |
List of power stations in Queensland |
This article about an Australian power station is a stub. You can help Misplaced Pages by expanding it. |