Misplaced Pages

Golan Heights wind farm: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 00:04, 2 May 2011 editNableezy (talk | contribs)Extended confirmed users, Page movers, Pending changes reviewers, Rollbackers56,155 edits Undid revision 426974740 by 128.36.69.134 (talk) uhh no← Previous edit Revision as of 06:49, 2 May 2011 edit undoCptnono (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers26,588 edits uhhh yeah. not reverting everything but the map is a concern as usualNext edit →
Line 6: Line 6:
| image_caption = | image_caption =
| image_alt = | image_alt =
| location_map = Golan | location_map =
| location_map_width = | location_map_width =
| location_map_text = | location_map_text =

Revision as of 06:49, 2 May 2011

Golan Heights Wind Farm
Country
Location
Coordinates33°05′N 35°50′E / 33.08°N 35.83°E / 33.08; 35.83
StatusOperational
Commission date1992
OwnerMey Eden
Wind farm
TypeOnshore
Power generation
Nameplate capacity
  • 6 MW
External links
CommonsRelated media on Commons
[edit on Wikidata]

The Golan Heights Wind Farm is an Israeli wind farm located 1050 m above sea level on Mount Bnei Rasan 5 km south of Quneitra in the Golan Heights. The wind farm was built in 1992 by the Mey Eden (Waters of Eden) mineral water company, supported by the then-Ministry of Energy and Infrastructure.

It includes 10 Floda 600 wind turbines generating 6 MW in total. The energy is consumed by the Mey Eden plant, the Golan Heights Winery and about 20,000 people. The remaining energy is fed into the electrical grid.

Mey Eden built Israel's first wind farm, or even the first commercial wind-power project in the Middle East.

The installation was based an extensive wind resource assessment carried out in 20 sites in the Golan Heights for about three years.

Future plans

Mineral water company Mey Golan (Waters of Golan) was granted a license to build a $500 million and 400 MW wind farm also on the Golan Heights. The project consists of about 150 turbines spread over 140 km, in north-eastern Golan Heights from the Druze village Majdal Shams to moshav Alonei HaBashan and will be built predominantly within privately owned orchards.

The partnership between Mey Golan and US energy giant AES Corporation is worth $600 million.

According to the Israeli Foreign Ministry a number of wind farms are planned in the Galilee, the Arava and the Negev. A number of actions was taken, among those are:

  • Identification of wind-intensive sites
  • Granting and licensing assistance to wind farm developers
  • R&D support

For Yoav Tsur, Israel's only wind farm operator so far, the future of the wind farm is uncertain due to the talks with Syria.

References

  1. Middle-East’s First Wind-Farm CleanBeta, June 13, 2008
  2. Mey Golan Wind Energy Ltd.
  3. AES, Mei Golan to build wind turbines farm, HaAretz, Apr. 16, 2008
  4. Israel’s first wind energy developer .. gets windier on the Golan GreenProphet, Aug. 8, 2008
  5. The Golan Heights Hadassah magazine, Oct, 2000

External links

Template:CommonsCat

Energy in Israel
Power stations
Coal-fired
Gas-fired
Oil-fired
Solar
Oil shale-fired
Sea wave
Wind farms
Pumped-storage hydroelectric
Companies and organizations
See also
  1. Located in the Israeli-occupied territory of the Golan Heights; see also Status of the Golan Heights.
Wind power
Wind power
Wind farms
Wind turbines
Wind power industry
Manufacturers
Concepts
Category: