Revision as of 21:00, 29 July 2017 editTrekphiler (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers63,539 edits →Cancellation: fact tag, resto hidden (just can't stand anything I put in anywhere, can you? & you're wrong)← Previous edit | Revision as of 21:20, 29 July 2017 edit undoAndy Dingley (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers, Rollbackers160,200 edits rv - don't insert OR editorialising into articles. Undid revision 792959098 by Trekphiler (talk)Next edit → | ||
Line 126: | Line 126: | ||
===Cancellation=== | ===Cancellation=== | ||
The Arrow's cancellation was announced on 20 February 1959. The day became known as "Black Friday" in the Canadian aviation industry.<ref>Zuuring 1999, p. 112.</ref> Diefenbaker claimed the decision was based on "a thorough examination" of threats and defensive measures, and the cost of defensive systems.<ref>Godefroy, Dr Andrew B. (Ed) ''Canadian Forces.'' 2009, p. 68. {{ISBN|978-1-100-12396-7}}</ref> More specifically, the cost would have needed to be amortized over hundreds of manufactured models. At the time however, surface-to-air missiles were already starting to replace jet fighters{{cn|date=July 2017}} and the foreign demand for the Avro Arrow had declined substantially. Canada's alternative to the Arrow was to purchase some American jet fighters and interceptor missiles.<ref>http://nationalpost.com/opinion/matt-gurney-arrows-didnt-make-sense-then-and-dont-now/wcm/29cc24af-a03c-44f8-8935-8d77ac47a642</ref><ref>http://globalnews.ca/news/427985/55-years-later-biggest-question-surrounding-avro-arrow-remains-what-if/</ref |
The Arrow's cancellation was announced on 20 February 1959. The day became known as "Black Friday" in the Canadian aviation industry.<ref>Zuuring 1999, p. 112.</ref> Diefenbaker claimed the decision was based on "a thorough examination" of threats and defensive measures, and the cost of defensive systems.<ref>Godefroy, Dr Andrew B. (Ed) ''Canadian Forces.'' 2009, p. 68. {{ISBN|978-1-100-12396-7}}</ref> More specifically, the cost would have needed to be amortized over hundreds of manufactured models. At the time however, surface-to-air missiles were already starting to replace jet fighters{{cn|date=July 2017}} and the foreign demand for the Avro Arrow had declined substantially. Canada's alternative to the Arrow was to purchase some American jet fighters and interceptor missiles.<ref>http://nationalpost.com/opinion/matt-gurney-arrows-didnt-make-sense-then-and-dont-now/wcm/29cc24af-a03c-44f8-8935-8d77ac47a642</ref><ref>http://globalnews.ca/news/427985/55-years-later-biggest-question-surrounding-avro-arrow-remains-what-if/</ref> | ||
The decision immediately put 14,528 Avro employees, as well as nearly 15,000 other employees in the Avro ] of outside suppliers, out of work.<ref>Stewart 1998, p. 269; Peden 2003, p. 157; Harrison, Mark. "Diefenbaker surrenders our sovereignty?" '']'', 23 February 1959, p. 1.</ref> Declassified records show Avro management was caught unprepared by the suddenness of the announcement by the government; while executives were aware that the program was in jeopardy, they expected it to continue until the March review. It was widely believed during this lead-up to the review, the first Arrow Mk II, RL-206, would be prepared for an attempt at both world speed and altitude records.<ref>Peden 2003, p. 78.</ref> | The decision immediately put 14,528 Avro employees, as well as nearly 15,000 other employees in the Avro ] of outside suppliers, out of work.<ref>Stewart 1998, p. 269; Peden 2003, p. 157; Harrison, Mark. "Diefenbaker surrenders our sovereignty?" '']'', 23 February 1959, p. 1.</ref> Declassified records show Avro management was caught unprepared by the suddenness of the announcement by the government; while executives were aware that the program was in jeopardy, they expected it to continue until the March review. It was widely believed during this lead-up to the review, the first Arrow Mk II, RL-206, would be prepared for an attempt at both world speed and altitude records.<ref>Peden 2003, p. 78.</ref> |
Revision as of 21:20, 29 July 2017
CF-105 Arrow | |
---|---|
Avro Canada CF-105 Arrow | |
Role | InterceptorType of aircraft |
Manufacturer | Avro Canada |
First flight | 25 March 1958 |
Status | Cancelled (20 February 1959) |
Primary user | Royal Canadian Air Force |
Produced | 1957–1959 (design work began in 1953) |
Number built | Five. (The sixth aircraft was 93% complete; others were in various states of completion.) |
The Avro Canada CF-105 Arrow, often known simply as the Avro Arrow, was a delta-winged interceptor aircraft designed and built by Avro Canada. The Arrow is considered to have been an advanced technical and aerodynamic achievement for the Canadian aviation industry. The CF-105 (Mark 2) held the promise of near-Mach 2 speeds at altitudes of 50,000 feet (15,000 m) and was intended to serve as the Royal Canadian Air Force's (RCAF) primary interceptor in the 1960s and beyond. However, Canada tried to sell the Arrow to the U.S. and Britain, but had no takers. The aircraft industry in both countries was considered a national interest and the purchase of foreign designs was rare.
The Arrow was the culmination of a series of design studies begun in 1953 examining improved versions of the Avro Canada CF-100 Canuck. After considerable study, the RCAF selected a dramatically more powerful design, and serious development began in March 1955. The aircraft was intended to be built directly from the production line, skipping the traditional hand-built prototype phase. The first Arrow Mk. I, RL-201, was rolled out to the public on 4 October 1957, the same day as the launch of Sputnik I.
Flight testing began with RL-201 on 25 March 1958, and the design quickly demonstrated excellent handling and overall performance, reaching Mach 1.9 in level flight. Powered by the Pratt & Whitney J75, another three Mk. 1s were completed, RL-202 through -204. The lighter and more powerful Orenda Iroquois engine was soon ready for testing, and the first Mk.II with the Iroquois, RL-206, was ready for taxi testing in preparation for flight and acceptance tests by RCAF pilots by early 1959.
On 20 February 1959, the development of the Arrow (and its Iroquois engines) was abruptly halted before a planned project review had taken place. Two months later, the assembly line, tooling, plans and existing airframes and engines were ordered to be destroyed. The cancellation was the topic of considerable political controversy at the time, and the subsequent destruction of the aircraft in production remains a topic for debate among historians and industry pundits. "This action effectively put Avro out of business and its highly skilled engineering and production personnel scattered...."
Design and development
Background
In the post-Second World War period, the Soviet Union began developing a capable fleet of long-range bombers with the ability to deliver nuclear weapons across North America and Europe. The main threat was principally from high-speed, high-altitude bombing runs launched from the Soviet Union travelling over the Arctic against military bases and built-up industrial centres in Canada and the United States. To counter this threat, Western countries strenuously undertook the development of interceptors that could engage and destroy these bombers before they reached their targets.
A. V. Roe Canada Limited had been set up as a subsidiary of the Hawker Siddeley Group in 1945, initially handling repair and maintenance work for aircraft at Malton, Ontario Airport, today known as Toronto Pearson International Airport. The next year the company began the design of Canada's first jet fighter for the Royal Canadian Air Force (RCAF), the Avro CF-100 Canuck all-weather interceptor. The Canuck underwent a lengthy and troubled prototype stage before entering service seven years later in 1953. Nevertheless, it went on to become one of the most enduring aircraft of its class, serving in a variety of roles until 1981.
Recognizing that the delays that affected the development and deployment of the CF-100 could also affect its successor, and the fact that the Soviets were working on newer jet-powered bombers that would render the CF-100 ineffective, the RCAF began looking for a supersonic, missile-armed replacement for the Canuck even before it had entered service. In March 1952, the RCAF's Final Report of the All-Weather Interceptor Requirements Team was submitted to Avro Canada.
Higher speeds
Avro engineering had been considering supersonic issues already at this point. Supersonic flight works in a very different fashion and presents a number of new problems. One of the most critical, and surprising, was the sudden onset of a new form of drag, known as wave drag. The effects of wave drag were so strong that engines of the era could not provide enough power to overcome it, leading to the concept of a "sound barrier".
German research during the Second World War had shown the onset of wave drag was greatly reduced by using airfoils that varied in curvature as gradually as possible. This suggested the use of thinner airfoils with much longer chord than designers would have used on subsonic aircraft. These designs were impractical because they left little internal room in the wing for armament or fuel. However, they also discovered it was possible to "trick" the airflow into the same behaviour if a conventional thicker airfoil was used, swept rearward at a sharp angle, creating a swept-wing. This provided many of the advantages of a thinner airfoil while also retaining the internal space needed for strength and fuel storage. Another advantage was that the wings were clear of the supersonic shock wave generated by the nose of the aircraft.
Almost every fighter project in the postwar era immediately applied the concept, which started appearing on production fighters in the late 1940s. Avro engineers explored swept-wing and tail modifications to the CF-100 known as the CF-103, which had proceeded to wooden mock-up stage. The CF-103 offered improved transonic performance with supersonic abilities in a dive. However, the basic CF-100 continued to improve through this period, and the advantages were continually eroded. When a CF-100 broke the sound barrier on 18 December 1952, interest in the CF-103 waned.
Delta wings
Designer James C. FloydAt the time we laid down the design of the CF-105, there was a somewhat emotional controversy going on in the United States on the relative merits of the delta plan form versus the straight wing for supersonic aircraft... our choice of a tailless delta was based mainly on the compromise of attempting to achieve structural and aero elastic efficiency, with a very thin wing, and yet, at the same time, achieving the large internal fuel capacity required for the specified range.
Another solution to the high-speed problem is the delta wing. The delta wing had many of the same advantages of the swept wing in terms of transonic and supersonic performance, but offered much more internal room and overall surface area. This provided more room for fuel, an important consideration given the inefficient early jet engines of the era, and the large wing area provided ample lift at high altitudes. The delta wing also enabled slower landings than swept wings in certain conditions. The disadvantages of the design were increased drag at lower speeds and altitudes, and especially higher drag while maneuvering. For the interceptor role these were minor concerns, as the aircraft would be spending most of its time flying in straight lines at high altitudes and speeds, mitigating these disadvantages.
Further proposals based on the delta wing resulted in two versions of the design known as C104: the single engine C104/4 and twin-engined C104/2. The designs were otherwise similar, using a low-mounted delta-wing; the primary advantages of the C104/2 were a larger overall size which offered a much larger internal weapons bay, at the time a cutting-edge feature in a fighter, and gave it twin-engine reliability. The proposals were submitted to the RCAF in June 1952.
AIR 7-3 and C105
Intensive discussions between Avro and the RCAF examined a wide range of alternative sizes and configurations for a supersonic interceptor, culminating in RCAF "Specification AIR 7-3" in April 1953. AIR 7-3 called specifically for crew of two, twin engines, with a range of 300 nautical miles (556 km) for a normal low-speed mission, and 200 nmi (370 km) for a high-speed interception mission. It also specified operation from a 6,000 ft (1,830 m) runway; a Mach 1.5 cruising speed at an altitude of 70,000 ft (21,000 m); and manoeuvrability for 2 g turns with no loss of speed or altitude at Mach 1.5 and 50,000 ft. The specification required five minutes from starting the aircraft's engines to reaching 50,000 ft altitude and Mach 1.5. It was also to have turn-around time on the ground of less than 10 minutes. An RCAF team led by Ray Foottit visited U.S. aircraft producers and surveyed British and French manufacturers before concluding that no existing or planned aircraft could fulfill these requirements.
Avro submitted their modified C105 design in May 1953, essentially a two-man version of the C104/2. A change to a "shoulder-mounted" wing allowed rapid access to the aircraft's internals, weapons bay, and engines. The new design also allowed the wing to be built as a single structure sitting on the upper fuselage, simplifying construction and improving strength. The wing design required a long main landing gear that still had to fit within the thin delta wing, presenting an engineering challenge. Five different wing sizes were outlined in the report, ranging between 1,000 ft and 1,400 ft (93 m to 130 m); the 1,200 ft (111 m) sized version was eventually selected.
The primary engine selection was the Rolls-Royce RB106, an advanced two-spool design offering around 21,000 pounds-force (93,000 N). Backup designs were the Bristol Olympus OL-3, the US-built Curtiss-Wright J-67 version of the OL-3, or the Orenda TR.9 engines.
Armament was stored in a large internal bay located in a "belly" position, taking up over one third of the aircraft fuselage. A wide variety of weapons could be deployed from this bay, such as the Hughes Falcon guided missile, the CARDE Velvet Glove air-to-air missile, or four general-purpose 1,000 lb bombs. The Velvet Glove radar-guided missile had been under development with the RCAF for some time, but was believed unsuitable for supersonic speeds and lacked development potential. Consequently, further work on that project was cancelled in 1956.
In July 1953, the proposal was accepted and Avro was given the go-ahead to start a full design study under the project name: "CF-105". In December, CA$27 million was provided to start flight modelling. At first, the project was limited in scope, but the introduction of the Soviet Myasishchev M-4 Bison jet bomber and the Soviet Union's testing of a hydrogen bomb dramatically changed Cold War priorities. In March 1955, the contract was upgraded to CA$260 million for five Arrow Mk.1 flight-test aircraft, to be followed by 35 Arrow Mk. 2s with production engines and fire-control systems.
Production
In order to meet the timetable set by the RCAF, Avro decided that Arrow program would adopt the Cook-Craigie plan. Normally a small number of prototypes of an aircraft were hand built and flown to find problems, and when solutions were found these changes would be worked into the design and then the production line would be set up. In a Cook-Craigie system, the production line was set up first and a small number of aircraft were built as production models. Any changes would be incorporated into the jigs while testing continued, with full production starting when the test program was complete. As Jim Floyd noted at the time, this was a risky approach, however: "...it was decided to take the technical risks involved to save time on the programme... I will not pretend that this philosophy of production type build from the outset did not cause us a lot of problems in Engineering. However, it did achieve its objective."
In order to mitigate risks, a massive testing program was started. By mid-1954, the first production drawings were issued and wind tunnel work began, along with extensive computer simulation studies carried out both in Canada and the United States using sophisticated computer programs. In a related program, nine instrumented free-flight models were mounted on solid fuel Nike rocket boosters and launched from Point Petre over Lake Ontario while two additional models were launched from the NACA facility at Wallops Island, Virginia, over the Atlantic Ocean. These models were for aerodynamic drag and stability testing, flown to a maximum speed of Mach 1.7+ before intentionally crashing into the water.
Experiments showed the need for only a small number of design changes, mainly involving the wing profile and positioning. To improve high-alpha performance, the leading edge of the wing was drooped, especially on outer sections, a dog-tooth was introduced at about half-span to control spanwise flow, and the entire wing given a slight negative camber which helped control trim drag and pitch-up. The area rule principle, made public in 1952, was also applied to the design. This resulted in several changes including the addition of a tailcone, sharpening the radar nose profile, thinning the intake lips, and reducing the cross-sectional area of the fuselage below the canopy.
The construction of the airframe was fairly conventional, with a semi-monocoque frame and multi-spar wing. The aircraft used a measure of magnesium and titanium in the fuselage, the latter limited largely to the area around the engines and to fasteners. Titanium was still expensive and not widely used because it was difficult to machine.
The Arrow's thin wing required aviation's first 4,000 lb/in (28 MPa) hydraulic system to supply enough force to the control surfaces, while using small actuators and piping. A rudimentary fly-by-wire system was employed, in which the pilot's input was detected by a series of pressure-sensitive transducers in the stick, and their signal was sent to an electronic control servo that operated the valves in the hydraulic system to move the various flight controls. This resulted in a lack of control feel; because the control stick input was not mechanically connected to the hydraulic system, the variations in back-pressure from the flight control surfaces that would normally be felt by the pilot could no longer be transmitted back into the stick. To re-create a sense of feel, the same electronic control box rapidly responded to the hydraulic back-pressure fluctuations and triggered actuators in the stick, making it move slightly; this system, called "artificial feel", was also a first.
In 1954, the RB.106 program was cancelled, necessitating the use of the backup Wright J67 engine instead. In 1955, this engine was also cancelled, leaving the design with no engine. At this point, the Pratt & Whitney J75 was selected for the initial test-flight models, while the new TR 13 engine was developed at Orenda for the production Mk 2s.
After evaluating the engineering mock-ups and the full-scale wooden mock-up in February 1956, the RCAF demanded additional changes, selecting the advanced RCA-Victor Astra fire-control system firing the equally advanced United States Navy Sparrow II in place of the MX-1179 and Falcon combination. Avro vocally objected on the grounds that neither of these were even in testing at that point, whereas both the MX-1179 and Falcon were almost ready for production and would have been nearly as effective for "a very large saving in cost". The Astra proved to be problematic as the system ran into a lengthy period of delays, and when the USN cancelled the Sparrow II in 1956, Canadair was quickly brought in to continue the Sparrow program in Canada, although they expressed grave concerns about the project as well and the move added yet more expense.
Rollout and flight testing
Go-ahead on the production was given in 1955. The rollout of the first CF-105, marked as RL-201, took place on 4 October 1957. The company had planned to capitalize on the event, inviting more than 13,000 guests to the occasion. Unfortunately for Avro, the media and public attention for the Arrow rollout was dwarfed by the launch of Sputnik the same day.
The J-75 engine was slightly heavier than the PS-13, and therefore required ballast to be placed in the nose to return the centre of gravity to the correct position. In addition, the Astra fire-control system was not ready, and it too, was replaced by ballast. The otherwise unused weapons bay was loaded with test equipment.
Jack Woodman, the only RCAF pilot to fly the ArrowThe aircraft, at supersonic speeds, was pleasant and easy to fly. During approach and landing, the handling characteristics were considered good ... On my second flight ... the general handling characteristics of the Arrow Mark 1 were much improved ... On my sixth and last flight ... the erratic control in the rolling plane, encountered on the last flight, no longer there ... Excellent progress was being made in the development ... from where I sat the Arrow was performing as predicted and was meeting all guarantees.
RL-201 first flew on 25 March 1958 with Chief Development Test Pilot S/L Janusz Żurakowski at the controls. Four more J75-powered Mk 1s were delivered in the next 18 months. The test flights, limited to "proof-of-concept" and assessing flight characteristics, revealed no serious design faults. The CF-105 demonstrated excellent handling throughout the flight envelope, a large part due to the natural qualities of the delta-wing, but responsibility can also be attributed to the Arrow's Stability Augmentation System. The aircraft went supersonic on its third flight and, on the seventh, broke 1,000 mph (1,600 km/h) at 50,000 ft (15,000 m) while climbing. A top speed of Mach 1.98 was achieved, and this was not at the limits of its performance. However, an Avro report made public in 2015 clarifies that during the highest speed flight, the Arrow reached Mach 1.90 in steady level flight, and an indicated Mach number of 1.95 was recorded in a dive. Estimates up to Mach 1.98 likely originated from an attempt to compensate for lag error, which was expected in diving flight.
Although no major problems were encountered during the initial testing phase, some minor issues with the landing gear and flight control system had to be rectified. The former problem was partly due to the tandem main landing gear being very narrow, in order to fit into the wings; the leg shortened in length and rotated as it was stowed. During one landing incident, the chain mechanism (used to shorten the gear) in the Mark 1 gear jammed, resulting in incomplete rotation. In a second incident with Arrow 202 on 11 November 1958, the flight control system commanded elevons full down at landing; the resulting reduction in weight on the gears reduced the effective tire friction, ultimately resulting in brake lockup and subsequent gear collapse. A photograph taken of the incident proved that inadvertent flight control activation had caused the accident. The only occasion when a test flight was diverted occurred on 2 February 1959, when a TCA Viscount crash-landed in Toronto, necessitating a landing at CFB Trenton.
The stability augmentation system also required much fine-tuning. Although the CF-105 was not the first aircraft to use such a system, it was one of the first of its kind, and was problematic. By February 1959, the five aircraft had completed the majority of the company test program and were progressing to the RCAF acceptance trials.
Political issues
From 1953, some senior Canadian military officials at the chiefs of staffs began to question the program. The chiefs of staff of the army and navy were both strongly opposed to the Arrow, since "substantial funds were being diverted to the air force", while Air Marshal Hugh Campbell, RCAF Chief of Staff, backed it right up until its cancellation. In June 1957, when the governing Liberals lost the federal election and a Progressive Conservative government under John Diefenbaker took power, the aircraft's prospects began to noticeably change. Diefenbaker had campaigned on a platform of reining in what the Conservatives claimed was "rampant Liberal spending". Nonetheless, by 1958, the parent company had become Canada's third largest business enterprise and had primary interests in rolling stock, steel and coal, electronics and aviation with 39 different companies under the A. V. Roe Canada banner.
In August 1957, the Diefenbaker government signed the NORAD (North American Air Defense) Agreement with the United States, making Canada a partner with American command and control. The USAF was in the process of completely automating their air defence system with the SAGE project, and offered Canada the opportunity to share this sensitive information for the air defence of North America. One aspect of the SAGE system was the Bomarc nuclear-tipped anti-aircraft missile. This led to studies on basing Bomarcs in Canada in order to push the defensive line further north, even though the deployment was found to be extremely costly. Deploying the missiles alone was expected to cost C$164 million, while SAGE would absorb another C$107 million, not counting the cost of improvements to radar; in all, it was projected to raise Canada's defence spending "as much as 25 to 30%", according to George Pearkes, then minister of national defence.
Defence against ballistic missiles was also becoming a priority. The existence of Sputnik had also raised the possibility of attacks from space, and, as the year progressed, word of a "missile gap" began spreading. An American brief of the meeting with Pearkes records his concern Canada could not afford defensive systems against both ballistic missiles and manned bombers. It is also said Canada could afford the Arrow or Bomarc/SAGE, but not both.
By 11 August 1958, Pearkes requested cancellation of the Arrow, but the Cabinet Defence Committee (CDC) refused. Pearkes tabled it again in September and recommended installation of the Bomarc missile system. The latter was accepted, but again the CDC refused to cancel the entire Arrow program. The CDC wanted to wait until a major review on 31 March 1959. They cancelled the Sparrow/Astra system in September 1958. Efforts to continue the program through cost-sharing with other countries were then explored. In 1959, Pearkes would say the ballistic missile was the greater threat, and Canada purchased Bomarc "in lieu of more airplanes".
Operational history
Foreign interest
Canada unsuccessfully tried to sell the Arrow to the U.S. and Britain. The aircraft industry in both countries was considered a national interest and the purchase of foreign designs was rare.
Nevertheless, from 1955 onwards, the UK had shown considerable interest in the Arrow. Desiring a high-performance interceptor like the Arrow, the RAF began the F.155 program in 1955, projecting a service entry date of 1962. As the program continued, it was clear the aircraft would not be ready by that date, and attention turned to interim designs that could be in service by the late 1950s to cover this period. At first, consideration was given to a "thin-wing" version of the Gloster Javelin that would provide moderate supersonic performance, along with the extremely high performance but short range Saunders-Roe SR.177.
In April 1956, the UK's Air Council recommended a purchase of 144 Arrows to fill the role of the thin-wing Javelin. These would be powered by UK engines; the Bristol Olympus 7R - 17,000 lbf (76 kN) thrust dry, 23,700 lbf (105 kN) with reheat, the Rolls-Royce Conway Stage 4 - 18,340 lbf (81.6 kN) thrust dry, 29,700 lbf (132 kN)with reheat, or de Havilland Gyron - 19,500 lbf (87 kN) thrust dry, 28,000 lbf (120 kN)with reheat.
Procurement of the Arrow from Canada, and setting up a production line in the UK, was studied, the unit price per aircraft built in the UK being estimated at £220,000 each for a production run of 100 aircraft, as opposed to the estimate of £150,000 per aircraft for the thin wing Javelin. The CF-105 would serve as a stopgap until the UK's F.155 project came to fruition; however with the F.155 due in 1963 and the Arrow not likely to reach the RAF before 1962, there was little point in proceeding.
The infamous 1957 Defence White Paper, described as "the biggest change in military policy ever made in normal times", led to the cancellation of almost all British manned fighter aircraft then in development, and completely curtailed any likelihood of a purchase. In January 1959, the UK's final answer was no; Britain countered with an offer to sell Canada the English Electric Lightning.
The French government expressed an interest in the Iroquois engine for an enlarged version of the Dassault Mirage IV bomber, the Mirage IVB. This was one of several engines being considered, including the Olympus, with an order for 300 Iroquois being considered. Acting on media speculation that the Iroquois engine program was also in jeopardy of being cancelled, the French government chose to end negotiations in October 1958 and opted for an upgraded version of the indigenous Snecma Atar, instead. There was never an explanation for this decision offered by the French government, even after Avro tried to offer the Iroquois as a private venture.
In the US, the 1954 interceptor was well underway, and would ultimately introduce the Convair F-106 Delta Dart, an aircraft with many similarities to the Arrow. More advanced designs were also being considered, notably the Mach 3 Republic XF-103, and by the time the Arrow was flying, the much more advanced North American XF-108. Both of these programs were cancelled during the mock-up stage, as it was believed the need for a manned interceptor of very high-performance simply did not exist as the Soviets were clearly moving their strategic force to ICBMs. This argument added weight to the justification of cancelling the Arrow. In 1958, Avro Aircraft Limited president and general manager Fred Smye elicited a promise from the USAF to "supply, free, the fire control system and missiles and if they would allow the free use of their flight test centre at... Edwards AFB."
Cancellation
The Arrow's cancellation was announced on 20 February 1959. The day became known as "Black Friday" in the Canadian aviation industry. Diefenbaker claimed the decision was based on "a thorough examination" of threats and defensive measures, and the cost of defensive systems. More specifically, the cost would have needed to be amortized over hundreds of manufactured models. At the time however, surface-to-air missiles were already starting to replace jet fighters and the foreign demand for the Avro Arrow had declined substantially. Canada's alternative to the Arrow was to purchase some American jet fighters and interceptor missiles.
The decision immediately put 14,528 Avro employees, as well as nearly 15,000 other employees in the Avro supply chain of outside suppliers, out of work. Declassified records show Avro management was caught unprepared by the suddenness of the announcement by the government; while executives were aware that the program was in jeopardy, they expected it to continue until the March review. It was widely believed during this lead-up to the review, the first Arrow Mk II, RL-206, would be prepared for an attempt at both world speed and altitude records.
An attempt was made to provide the completed Arrows to the National Research Council of Canada as high-speed test aircraft. The NRC refused, noting that without sufficient spare parts and maintenance, as well as qualified pilots, the NRC could make no use of them. A similar project initiated by the Royal Aircraft Establishment (Boscombe Down) had resulted in Avro vice-president (engineering) Jim Floyd's preparing a transatlantic ferry operation. This proposal, like others from the United States, was never realized.
Aftermath
Within two months of the project cancellation, all aircraft, engines, production tooling and technical data were ordered scrapped. Officially, the reason given for the destruction order from cabinet and the chiefs of staff was to destroy classified and "secret" materials used in the Arrow and Iroquois programs. The action has been attributed to Royal Canadian Mounted Police fears that a Soviet "mole" had infiltrated Avro, later confirmed to some degree in the Mitrokhin archives.
Rumours had circulated that Air Marshal W. A. Curtis, a World War I ace who headed Avro, had ignored Diefenbaker and spirited one of the Arrows away to be saved for posterity. These rumours were given life in a 1968 interview, when Curtis was asked directly if the rumour was true. He replied, "I don't want to answer that." He proceeded to question the wisdom of printing the story of a missing Arrow, and wondered whether it would be safe to reveal the existence of a surviving airframe only nine years later. "If it is in existence it may have to wait another 10 years. Politically it may cause a lot of trouble." The legend endures that one of the prototypes remains intact somewhere.
Following the cancellation of the Avro Arrow project, CF-105 chief aerodynamicist Jim Chamberlin led a team of 25 engineers to NASA's Space Task Group to become lead engineers, program managers, and heads of engineering in NASA's manned space programs—projects Mercury, Gemini and Apollo. The Space Task Group team eventually grew to 32 Avro engineers and technicians, and became emblematic of what many Canadians viewed as a "brain drain" to the United States. Among the former Arrow team engineers to go south were Tecwyn Roberts (NASA's first flight dynamics officer on Project Mercury and later director of networks at the Goddard Space Flight Center) John Hodge (flight director and manager on the cancelled Space Station Freedom project), Dennis Fielder (director of the Space Station Task Force, later the Space Station), Owen Maynard (chief of the LM engineering office in the Apollo Program Office) and Rod Rose (technical assistant for the Space Shuttle program). Many other engineers, including Jim Floyd, found work in either the UK or the United States. Work undertaken by both Avro Canada and Floyd benefited supersonic research at Hawker Siddeley, Avro Aircraft's UK parent, and contributed to programs such as the HSA.1000 supersonic transport design studies, influential in the design of the Concorde.
In 1961, the RCAF obtained 66 McDonnell CF-101 Voodoo aircraft, one of the American designs the RCAF originally rejected, to serve in the role originally intended for the Avro Arrow. The controversy surrounding this acquisition, and Canada's acquiring nuclear weapons for the Voodoos and Bomarcs eventually contributed to the collapse of the Diefenbaker government in 1963.
Although nearly everything connected to the CF-105 and Orenda Iroquois programs was destroyed, the cockpit and nose gear of RL-206, the first Mk 2 Arrow, and two outer panels of RL-203's wings were saved and are on display at the Canada Aviation and Space Museum in Ottawa, alongside an Iroquois engine.
With specifications comparable to then-current offerings from American and Soviet design bureaus, at the time of its cancellation, the Arrow was considered by one aviation industry observer to be one of the most advanced aircraft in the world. The Arrow's cancellation eventually led to the end of Avro Aircraft Limited (Canada) and its president and general manager, Crawford Gordon Jr. was fired shortly afterward. In 1962, the Hawker Siddeley Group formally dissolved A. V. Roe Canada and transferred all its assets to Hawker Siddeley's newly formed subsidiary, Hawker Siddeley Canada. According to Bill Gunston:
In its planning, design and flight-test programme, this fighter, in almost every way the most advanced of all the fighters of the 1950s, was as impressive, and successful as any aircraft in history.
The nosecone section of Avro Arrow RL-206, currently on display at the Canada Aviation and Space Museum in Ottawa, was smuggled out of the Avro Aircraft plant in Malton by members of the RCAF Flying Personnel Medical Establishment, a detachment of RCAF Station Downsview on Avenue Road in Toronto, where it resided for many years and was employed in high-altitude work. The commanding officer of the Flying Personnel Medical Establishment, Wing Commander Roy Stubbs, provides this prologue to the former aircraft:
One day after a change of government, the new RCAF Chief of the Air Staff came to inspect our facilities and programs and after lunch, I asked if he would like to see something special. I showed him a piece of the Arrow; cockpit section and engine nacelles and a few other bits. I asked him what we should do with it and he said to keep it hidden until the climate in Ottawa was right, and then he would arrange to have it placed in the National Aeronautical Museum in Ottawa. Eventually this was done and at least a bit of history was saved.
Variants
Mark 1
The Arrow Mark 1 was the initial version powered by two Pratt & Whitney J75 turbojet engines that produced 23,500 pounds-force (105 kN) of thrust each. The Mk 1 was used for development and flight testing. Five were completed.
Mark 2
The Mk 2 version was to be fitted with the Orenda PS-13 Iroquois engines and would be evaluated by RCAF acceptance pilots as well as Avro test pilots. The new PS-13S engines were designed to produce 30,000 lbf (130 kN) each. The Astra/Sparrow fire control system had been terminated by the government in September 1958 with all aircraft to employ the Hughes/Falcon combination. At the time of cancellation of the entire program, the first Arrow Mk 2, RL-206, was ready for taxi trials; Avro expected it to break the world speed record, but it never flew.
Top speed would have been limited by atmospheric frictional heating, but according to project engineer James Floyd, "he aluminum alloy structure which we favoured was good for speeds greater than a Mach number of 2."
Other designs
Avro Canada had a wide range of advanced Arrow variants under development at the time of project cancellation. Frequent mention is made of an Arrow that could have been capable of Mach 3, similar to the Mikoyan-Gurevich MiG-25. This was not the production version, but one of the design studies, and would have been a greatly modified version of the Arrow Mk 2, featuring revised engine inlets and extensive use of carbon steel and titanium to withstand airframe heating. The Mark 2A and Mark 3 were also to have updated engines, capable of producing 39,800 lbf (177 kN) each, increasing the maximum takeoff weight by 7,700 kg (17,000 lb) and flight ceiling to 70,000 ft.
In 2010, in the context of ongoing controversy surrounding the Lockheed Martin F-35 Lightning II Canadian procurement, as an alternative to continued support of the troubled F-35, a group of individuals began lobbying Ottawa to consider domestic production of an updated version of the Avro Arrow, using modern materials and engines but keeping the Arrow's proven "basic design". The group feels that a modernized Arrow would out-perform the F-35 in speed, range and maximum altitude, among others, while admitting that the Arrow lacks the F-35's stealth characteristics. However, in 2012, the Harper government publicly rejected the bid, saying the redesigned Arrow program was risky, would take too long to develop, and would be too expensive.
Avro Arrow replicas
A replica Arrow built by Allan Jackson was used in The Arrow, a Canadian Broadcasting Corporation (CBC) production. He began building a full-scale replica of the Arrow in 1989, and was approached by the producers of the Arrow miniseries in 1996, then about 70% complete, who made an offer to complete the construction if the replica could be used for the production. It was used on the miniseries and several public appearances at air shows. The replica was later donated to the Reynolds-Alberta Museum in his home town of Wetaskiwin, Alberta. While in a temporary outdoor collection, it was damaged in a wind storm in 2009. It has since been repaired, but is no longer on public display.
The Avro Museum (http://www.avromuseum.com), based out of CYBW west of Calgary, Alberta, Canada is building a 2/3rd scale, manned, high performance flying replica of the Avro Arrow (officially known as ARROW II) to Canadian Aviation Experimental Aircraft Regulations in order to become an airshow demonstration aircraft. Construction began in October 2007, and by 2012 the fuselage was completed and passed its first MDRA inspection, and now has a serial number. Powered by a pair of Pratt & Whitney JT-15D-4s, the ARROW II will have a top speed of approximately 500 knots and a range of 1,800 miles. Current projections show a final cost of the project at approximately one million dollars and it is hoped that ground tests will start in about 2016 with the first flight to follow.
The Canadian Air and Space Museum (CASM), located at the former CFB Downsview, features a full-size replica Arrow built by volunteers with assistance from local aerospace firms. With a metal structure, the replica features many authentic-looking components including landing gear constructed by Messier-Dowty, the original Arrow primary landing gear sub-contractor. Painted in the colours of Arrow 25203, the Arrow replica was rolled out for a media event on 28 September 2006 and was on public display on 8–9 October 2006 to commemorate the original aircraft's rollout in 1957.
This replica is now in storage (in the airport area) after being displayed at the Toronto International Centre (across the road from where the actual aircraft were built) for a technology trade show that ran from 30 September to 4 October 2013. The future plans for the replica as well as the other remaining aircraft in the now closed CASM is still up in the air. The museum is seeking a location near Pearson International Airport, so that it can display some time in 2015, all of its artifacts including a partly restored Avro Lancaster bomber.
Avro Arrow scale models
Between 1954 and 1957, nine Avro Arrow models, scaled at one-eighth size or about 3 m (9.8 ft) long, are believed to have been launched, using rockets, over Lake Ontario from Point Petre in Prince Edward County, Ontario as part of the process for testing the hull design. (Two others were launched in Virginia.) They travelled at supersonic speeds as onboard sensors sent data back to shore. After many attempts to find the models, a new search was started in late July 2017. The Raise the Arrow project was a joint venture by several companies, the Canadian Coast Guard and the Royal Canadian Military Institute. A Thunderfish autonomous submarine, equipped with an AquaPix interferometric synthetic aperture sonar, was being used to survey the relevant area of the lake bottom. Any scale models found will be restored and displayed at the Canada Aviation and Space Museum in Ottawa and the National Air Force Museum of Canada in Trenton, Ontario.
Operators
- Royal Canadian Air Force – Arrow was cancelled before entering service.
Specifications (Arrow Mk 1)
External image | |
---|---|
Avro CF-105 Arrow cutaway | |
Cutaway of the Avro CF-105 Arrow by Flight Global. |
Data from The Great Book of Fighters, The Canadian Approach to All-Weather Interceptor Development, Avro Arrow: The Story of the Avro Arrow from its Evolution to its Extinction
General characteristics
- Crew: 2
- Airfoil: NACA 0003.5 mod root, NACA 0003.8 tip
Performance
- Thrust/weight: 0.825 at loaded weight
Armament
- Rockets: 2× AIR-2A Genie unguided nuclear rockets or
- Missiles: Up to 8× AIM-4 Falcon, Canadair Velvet Glove (cancelled 1956) or 3 AIM-7 Sparrow II 2D active guidance missiles (cancelled)
Avionics
- Hughes MX-1179 fire control system
Notable appearances in media
Main article: Avro Canada Arrow in fictionIn 1997, the CBC broadcast their two-part miniseries, The Arrow. The production used a combination of archival film, remote-control flying models and computer animation for the static, ground and flying sequences. Although highly acclaimed, receiving praise from film historian and former Avro employee Elwy Yost and winner of numerous awards including the Gemini that year, the miniseries was also criticized for its "docu-drama" style and departing from a strict factual account. The continued rebroadcasts and accompanying DVD releases have served to re-animate the controversy over the Arrow's cancellation and introduce the story to a new generation.
See also
Aircraft of comparable role, configuration, and era
- Convair F-106 Delta Dart
- English Electric Lightning
- FMA I.Ae. 48
- McDonnell Douglas F-4 Phantom II
- McDonnell F-101 Voodoo
- Mikoyan-Gurevich MiG-25
- North American XF-108 Rapier
- Operational Requirement F.155 Project (UK)
- Republic XF-103
- Saab 35 Draken
- Saunders-Roe SR.177
Related lists
References
Notes
- The CF-105 used tandem main undercarriage units with two wheels and tires: one in front of and one behind the gear leg.
- The CF-105 Arrow used the stability augmentation system for all three axes; other aircraft in the 1950s, were experimenting with these systems, but had only reached the stage of incorporating simple, one-axis or two-axes stability augmentation.
- Although the source indicates it was the F-101 that was evaluated, it was the XF-88 Voodoo that was flying at the time while the F-101 was a revised and upgraded variant only in the development stage in 1953.
- Subsequent re-broadcasts on CBC television as well as Discovery and other "specialty channels" in Canada, continued until 2009.
Citations
- ^ Page et al. 2004, p. 117.
- "Avro Canada CF-105 Arrow 2." aviation.technomuses.ca. Retrieved: 17 October 2010.
- Page et al. 2004, p. 159.
- Peden 1987, p. 72.
- Dow 1979, p. 127; "Orenda History." Magellan Aerospace Corporation, 2005. Retrieved: 12 March 2009.
- Payne 2006, p. 213.
- Dow 1979, p. 67.
- Dow 1979, p. 60.
- ^ Gunston 1981, p. 18.
- Dow 1979, pp. 84–85.
- Dow 1979, pp. 61–62.
- Dow 1979, p. 70.
- Lombardi, Mike and Larry Merritt. "Toronto's Long History of Aerospace Achievement." Boeing Frontiers Magazine (online), Volume 4, Issue 2, June 2005. Retrieved: 26 September 2010.
- Dow 1979, p. 83.
- ^ Dow 1979, p. 84.
- Anderson 2008. pp. 683, 695.
- Whitcomb 2002, pp. 89–90.
- Milberry 1984, p. 317.
- ^ Floyd, James. "The Canadian Approach to All-Weather Interceptor Development. The Fourteenth British Commonwealth Lecture." Journal of the Royal Aeronautical Society, December 1958
- ^ Stimson, Thomas E. Jr. "Era of the Flying Triangles." Popular Mechanics, 106 (3). September 1956, pp. 89–94.
- Campagna 1998, pp. 68–69.
- Page et al. 2004, p. 11.
- Dow 1979, p. 89.
- Dow 1979, p. 25.
- Peden 2003, p. 26.
- Dow 1979, p. 85.
- Dow 1979, p. 86.
- Campagna 1998, pp. 66–67.
- Page et al. 2004, p. 12.
- Peden 2003, p. 45.
- Shaw 1979, p. 58.
- Whitcomb 2002, p. 86.
- Pigott 1997, p. 55.
- Peden 2003, p. 38.
- Page et al. 2004, p. 15.
- Belleau, Naomi. "Domestic Operations: Trinity's "Fiona" takes the plunge in search of Avro Arrow." Canadian Navy. Retrieved: 11 September 2010.
- Whitcomb 2002, pp. 89–91.
- Campagna 1998, p. 37.
- Whitcomb 2002, pp. 109–110.
- Campagna 1998, pp. 73–74.
- Pigott 1997, p. 56.
- Peden 2003, pp. 46–47.
- Campagna 1998, p. 68.
- Gainor 2001, p. 15.
- "The Arrow Unveiled." Flight International, 11 October 1957. pp. 562–563.
- Page et al. 2004, p. 161.
- Campagna 1998, pp. 86–87.
- ^ Pigott 1997, p. 57.
- Campagna 1998, p. 84.
- "Air & space Smithsonian, Volume 13." Smithsonian Institution. 1998, p. 37.
- ^ Campagna 1998, p. 85.
- ^ Campagna 1998, p. 87.
- Waechter 2015, pp. 113–18.
- Waechter 2015, p. 73.
- Campagna 1998, p. 70.
- Campagna 1998, p. 86.
- "Avro Museum." Avro Museum of Canada via web.archive.org. Retrieved: 4 September 2010.
- Page et al. 2004, p. 115.
- Abzug and Larrabee, 2002, p. 316.
- Story, Donald C. and Russel Isinger. "The origins of the cancellation of Canada's Avro CF-105 arrow fighter program: A failure of strategy". Journal of Strategic Studies, 30(6), December 2007.
- Stewart 1988, p. 235.
- Stewart, 1988, p. 238.
- "NORAD at 40 Historical Overview." fas.org. Retrieved: 4 September 2010.
- "Good Neighbours Make Good Fences: Canadian Continental Defence Planning and the 1954 Decision to fund the Mid-Canada Early Warning Line." Conference of Defence Associates Institute, April 2009.
- Campagna 1998
- "Canada-U.S. Defence Problems, File: DDE Trip to Canada, Memcons, 8–11 July 1958." Eisenhower Library.
- Campagna 1998, p. 88.
- Campagna 1998, p. 108.
- "File 79/469 Folder 19." Directorate of History, Department of National Defence
- Peden 1987, p. 72.
- defe7-1409e06_06
- Whitcomb 2002, pp. 84 and 215–216.
- "1951–1964." Central Office of Information for Ministry of Defence. Retrieved: 29 June 2012.
- Slessor, Sir John. "British Defense Policy." Foreign Affairs, 35(4), July 1957.
- Whitcomb 2002, p. 220.
- Campagna 1998, pp. 110–111.
- ^ Stewart 1998, pp. 290–291.
- Whitcomb 2002, pp. 80, 181–182.
- Campagna 1998, pp. 109–110.
- Smye 2014, p. 87.
- Zuuring 1999, p. 112.
- Godefroy, Dr Andrew B. (Ed) "Projecting Power: Canada's Air Force 2035." Canadian Forces. 2009, p. 68. ISBN 978-1-100-12396-7
- http://nationalpost.com/opinion/matt-gurney-arrows-didnt-make-sense-then-and-dont-now/wcm/29cc24af-a03c-44f8-8935-8d77ac47a642
- http://globalnews.ca/news/427985/55-years-later-biggest-question-surrounding-avro-arrow-remains-what-if/
- Stewart 1998, p. 269; Peden 2003, p. 157; Harrison, Mark. "Diefenbaker surrenders our sovereignty?" Toronto Daily Star, 23 February 1959, p. 1.
- Peden 2003, p. 78.
- Whitcomb 2002, p. 202.
- Shaw 1979, p. 89.
- Campagna 1998, p. 121.
- Stewart 1998, pp. 274–276.
- Andrew and Mitrokhin 2000, p. 219.
- McNenly, Pat. "Avro Arrow". Toronto Star, 30 November 1968, p. 1.
- ^ Bliss. Michael. "Arrow That Doesn't Fly: The CBC's miniseries about the interceptor that wasn't, is good to look at but ungrounded in facts." Time Magazine, 27 January 1997. Retrieved: 28 March 2010.
- ^ French and Burgess 2007, p. 196.
- "Tecwyn Roberts." llanddaniel.co.uk. Retrieved: 5 May 2011.
- Pillinger, Colin. "Red, white and blue Moon." Times Higher Education, 16 July 2009. Retrieved: 5 May 2011.
- Whitcomb 1999, pp. 251–259.
- "Pattern of the Industry." Aircraft Engineering and Aerospace Technology. 1960, 32(1).
- Page et al. 2004, p. 13.
- Stursberg 1975, p. 122.
- "Avro Canada CF-105 Arrow 2." aviation.technomuses.ca. Retrieved: 24 September 2010.
- Bothwell and Kilbourn 1979, p. 266.
- The Western Canada Aviation Museum magazine
- Donald, David, ed. "Avro Canada CF-105 Arrow". The Complete Encyclopedia of World Aircraft, p. 88. New York: Barnes & Noble Books, 1997. ISBN 0-7607-0592-5.
- ^ Floyd 1958
- Campagna 2003, p. 175.
- Valiquette 2011, p. 89 harvnb error: no target: CITEREFValiquette2011 (help)
- Harris, Kathleen. "Ottawa accused of axing Avro Arrow revival too soon." CBC News, 10 September 2012. Retrieved: 11 September 2012.
- Chase, Steve. "Will legendary Avro Arrow make Lazarus-like return?" The Globe and Mail, 9 September 2012. Retrieved: 11 September 2012.
- Visser, Josh. "Harper government officially grounds Avro Arrow relaunch proposal." National Post, 11 September 2012.
- Gainor, Chris. "Modern Arrows: Movie Replica." avroarrow.org. Retrieved: 11 September 2010
- "Master Plan - Avro Museum". www.avromuseum.com. Avro Museum, Calgary, Canada. 2014. Retrieved 25 August 2014.
- "Arrow II Project ." Avro Museum. Retrieved: 17 June 2012.
- "Our Collection and Displays." Canadian Air and Space Museum. Retrieved: 11 September 2010.
- "The Replica of the legendary Avro Arrow will be moved into a storage facility." Warbirds News, 23 September 2013.
- Thestar.com
- CBC.ca; Global News online
- Toronto Globe and Mail online
- Green, William and Gordon Swanborough. The Great Book of Fighters. St. Paul, Minnesota: MBI Publishing, 2001. ISBN 0-7603-1194-3.
- ^ Page et al. 2004, p. 116.
- Leversedge, T.F.J. "Avro Canada CF-105 Arrow RCAF Serial 25206 (Nose Section & Components)" (PDF). Canada Aviation and Space Museum. p. 31. Retrieved 14 May 2017.
- "The Avro Arrow: Canada's Broken Dream." shaw.ca, 2006. Retrieved: 25 September 2010.
- "The Arrow: Awards." IMDb. Retrieved: 25 September 2010.
- Gainor 2007, p. 208.
Bibliography
- Abzug, Malcolm J. and E. Eugene Larrabee. Airplane Stability and Control: A History of the Technologies that made Aviation Possible. Cambridge, UK: Cambridge University Press, 2002. ISBN 978-0-521-80992-4.
- Anderson, John D. Jr. Fundamentals of Aerodynamics. New York: McGraw-Hill Science/Engineering, Fifth Edition 2008, First Edition 1984. ISBN 1-4277-9659-9.
- Andrew, Christopher and Vasili Mitrokhin. The Mitrokhin Archive: The KGB in Europe and the West. Eastbourne, East Sussex, UK: Gardners Books, 2000. ISBN 0-14-028487-7.
- Bothwell, Robert and William Kilbourn. C.D. Howe: A Biography. Toronto: McClelland and Stewart, 1979. ISBN 0-7710-4535-2.
- Campagna, Palmiro. Storms of Controversy: The Secret Avro Arrow Files Revealed. Toronto: Stoddart, third paperback edition, 1998. ISBN 0-7737-5990-5.
- Campagna, Palmiro. Requiem for a Giant: A.V. Roe Canada and the Avro Arrow. Toronto: Dundurn Press, 2003. ISBN 1-55002-438-8.
- Dow, James. The Arrow. Toronto: James Lorimer and Company Publishers, 1979. ISBN 0-88862-282-1.
- Floyd, James. "The Canadian Approach to All-Weather Interceptor Development. The Fourteenth British Commonwealth Lecture." The Journal of the Royal Aeronautical Society, Volume 62, no. 576, December 1958.
- French, Francis and Colin Burgess. Into that Silent Sea: Trailblazers of the Space Era, 1961–1965 (Outward Odyssey: A People's History of Space). Lincoln Nebraska: University of Nebraska Press, 2007. ISBN 978-0-8032-1146-9.
- Gainor, Chris. Arrows to the Moon: Avro's Engineers and the Space Race. Burlington, Ontario: Apogee, 2001. ISBN 1-896522-83-1.
- Gainor, Chris. Who Killed the Avro Arrow? Edmonton: Folklore Publishing, 2007. ISBN 978-1-894864-68-8.
- Gunston, Bill. Fighters of the Fifties. North Branch, Minnesota: Specialty Press, 1981. ISBN 0-933424-32-9.
- Isinger, Russell. "Flying Blind: The Politics Of The Avro Canada CF-105 Arrow Programme." The Evolution of Air Power in Canada 1919 to the Present Day and Beyond. Winnipeg: Department of National Defence, Papers presented at the 2nd Air Force Historical Conference, volume II, 1997.
- Isinger, Russell. "The Avro Arrow." Canada: Confederation to Present. CD-ROM. Edmonton: Chinook Multimedia Inc., 2001. ISBN 1-894785-00-2.
- Isinger, Russell. "The Avro Arrow." The Oxford Companion to Canadian History. Toronto: Oxford University Press, 2004. ISBN 0-19-541559-0.
- Isinger, Russell. The Avro Canada CF-105 Arrow Programme: Decisions and Determinants. MA Thesis, University of Saskatchewan, 1997.
- Isinger, Russell and D.C. Story. "The Plane Truth: The Avro Canada CF-105 Arrow Programme." In The Diefenbaker Legacy: Politics, Law, and Society Since 1957. Regina: Canadian Plains Research Centre, 1980. ISBN 0-88977-091-3.
- Lukasiewicz, Julius. "Canada's Encounter with High-Speed Aeronautics." Technology and Culture. The International Quarterly Journal of the Society for the History of Technology, Volume 27, No. 2, April 1986.
- Milberry, Larry, ed. Sixty Years: The RCAF and CF Air Command 1924–1984. Toronto: Canav Books, 1984. ISBN 0-9690703-4-9.
- Page, Ron, Richard Organ, Don Watson and Les Wilkinson (the "Arrowheads"). Avro Arrow: The Story of the Avro Arrow from its Evolution to its Extinction. Erin, Ontario: Boston Mills Press, 1979, reprinted Stoddart, 2004. ISBN 1-55046-047-1.
- Payne, Stephen. Canadian Wings: A Remarkable Century of Flight. Vancouver: Douglas & McIntyre, 2006. ISBN 978-1-55365-167-3.
- Peden, Murray. Fall of an Arrow. Toronto: Stoddart Publishing, 2003, First edition 1978. ISBN 0-7737-5105-X.
- Pigott, Peter. Flying Canucks II: Pioneers of Canadian Aviation. Toronto: Dundurn Press Ltd, 1997. ISBN 0-88882-193-X
- Shaw, E.K. There Never was an Arrow. Toronto: Steel Rail Educational Publishing, 1979. ISBN 0-88791-025-4.
- Smye, Fred and Randy. Canadian Aviation and the Avro Arrow. Oakville, Ontario: Amazon/Kindle ebook, August 2014. ISBN 978-1-50054-599-4.
- Stewart, Greig. Arrow Through the Heart: The Life and Times of Crawford Gordon and the Avro Arrow. Toronto: McGraw-Hill-Ryerson, 1998. ISBN 0-07-560102-8.
- Stewart, Greig. Shutting Down the National Dream: A.V. Roe and the Tragedy of the Avro Arrow. Toronto: McGraw-Hill-Ryerson, 1991. ISBN 0-07-551119-3.
- Stursberg, Peter. Diefenbaker: Leadership Gained: 1956–62. Toronto: University of Toronto Press, 1975. ISBN 0-8020-2130-1.
- Supersonic Sentinel. Rare Avro Arrow film footage. Available from Arrow Digital Archives (ARC); also includes extra footage of the Arrow in flight and some footage of the Avro Jetliner (1950).
- Valiquette, Marc-Andre. Destruction of a Dream: The Tragedy of Avro Canada and the CF-105 Arrow, Volume 1. Montreal: Marc-Andre Valiquette (self-published), 2009. ISBN 978-2-9811239-0-9.
- Valiquette, Marc-Andre. Supersonic Dreams: At the Dawn of a New Era, Volume 2. Montreal: Marc-Andre Valiquette (self-published), 2010. ISBN 978-2-9811021-3-3.
- Waechter, David. Flight Test: The Avro Arrow and a Career in Aeronautical Engineering. Kitchener: David Waechter (self-published), 2015. ISBN 978-0-9948065-0-5.
- Whitcomb, Randall. Avro Aircraft and Cold War Aviation. St. Catharine's, Ontario: Vanwell, 2002. ISBN 1-55125-082-9.
- Whitcomb, Randall. Cold War Tech War. The Politics Of America's Air Defense. Burlington, Ontario: Apogee Books, 2008. ISBN 1-894959-77-9.
- Zuk, Bill. The Avro Arrow Story: The Impossible Dream. Calgary: Altitude Publishing, 2006. ISBN 1-55439-703-0.
- Zuk, Bill. The Avro Arrow Story: The Revolutionary Airplane and its Courageous Test Pilots. Calgary: Altitude Publishing, 2005. ISBN 1-55153-978-0.
- Zuk, Bill. Janusz Zurakowski: Legends in the Sky. St. Catharine's, Ontario: Vanwell, 2004. ISBN 1-55125-083-7.
- Zuuring, Peter. Arrow Countdown. Kingston, Ontario: Arrow Alliance Press, 2001. ISBN 1-55056-866-3.
- Zuuring, Peter. Arrow First Flight. Kingston, Ontario: Arrow Alliance Press, 2002. ISBN 1-55056-903-1.
- Zuuring, Peter. Arrow Rollout. Kingston, Ontario: Arrow Alliance Press, 2002. ISBN 1-55056-902-3.
- Zuuring, Peter. The Arrow Scrapbook. Kingston, Ontario: Arrow Alliance Press, 1999. ISBN 1-55056-690-3.
- Zuuring, Peter. Iroquois Rollout. Kingston, Ontario: Arrow Alliance Press, 2002. ISBN 1-55056-906-6.
- Additional resources
- Library and Archives Canada is the official repository of most government documents relating to the Avro CF-105 Arrow project, though there are many documents at the Department of National Defence's Directorate of History and Heritage as well. Almost all Avro Arrow documents have now been declassified.
- There Never Was an Arrow was broadcast on the CBC in March 1980 (available as an extra on the Arrow Docu-Drama DVD). Clips from the program can be seen at CBC.
External links
- Aerospace Heritage Foundation of Canada
- Arrow Digital Archives
- Avro Arrow Historica Minute
- Avro Arrow Home Page, the longest running Avro Arrow page
- Canada Aviation and Space Museum, remains of the RL-206 Avro Arrow and other components on display
- Canadian Air and Space Museum, home of an Avro Arrow replica
- CBC Digital Archives: The Avro Arrow, Canada's Broken Dream
- "The Great Arrow Debate" editorial on canavbooks.com
- "ARROW - A World-leading Intercepter (sic) by Avro Aircraft" a 1957 Flight article by Bill Gunston
- Royal Canadian Air Force - Avro CF-105 Arrow Mk.1
- The Avro Arrow & her pilot J. Zurakowski
- A new hunt for Avro Arrow models in the depths of Lake Ontario: This time the search will be different By Alexandra Sienkiewicz, CBC News, Posted: Jul 14, 2017
Avro Canada aircraft | |
---|---|
A.V. Roe Canada | |
Canadian Armed Forces post-1968 unified aircraft designations | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Numerical Sequence |
| ||||||||||||||||||
Role |
| ||||||||||||||||||
Not assigned |
Canada in the Cold War | |
---|---|
Events | |
Defectors | |
Alleged Soviet agents | |
Military | |
Government | |
Other |
Categories: