Misplaced Pages

Clark County Route 215: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editContent deleted Content addedVisualWikitext
Revision as of 03:40, 1 August 2007 editCoolrocketdude3444 (talk | contribs)160 edits External links← Previous edit Latest revision as of 03:23, 6 April 2020 edit undo2600:1002:b00a:78bf:a4ab:adf4:1c09:774d (talk) Move to standard redirect 
(19 intermediate revisions by 10 users not shown)
Line 1: Line 1:
#REDIRECT ]
{{Infobox road
|state=
|type=
|route=
|name_notes=
|alternate_name=]
|map=
|length_mi=35
|length_round=3
|length_ref={{Fact|date=February 2007}}
|established=2006
|decommissioned=
|direction_a=West
|starting_terminus=] ] in ]
|junction= ] ]
|direction_b=East
|ending_terminus=]]]/]
|previous_type=NV
|previous_route=208
|next_type=NV
|next_route=221
}}
'''Interstate 215''' (I-215) in ] is a portion of the '''Bruce Woodbury Beltway''' with '''Clark County 215''' (CC-215) being the other portion. The beltway is a $1.5 billion, 53-mile-long roadway being built to ] that goes around the center of the ]. The I-215 portion of the Bruce Woodbury Beltway runs from Interstate 15 at Exit 34, and travels southeast to a terminus at ].

The beltway currently consists of two different road types: ] and a limited access ]. The system is a freeway from the I-515 ] in ] to ] in western Las Vegas. It is currently being upgraded in several areas to a freeway.

== History ==
''] approved the I-215 designation for 18.9 miles of (then unbuilt) highway, from Tropicana Ave to US 95 (I-515) on ], ].''<ref name=kumi1>{{cite web |url= http://www.kurumi.com/roads/3di/ix15.html#215nv |title= I-215 Nevada |accessdate= 2007-07-24|format= |work= }}</ref>

] magazine, a national publication that provides the latest technology news and information to the Transportation Construction industry, named the '''Las Vegas Beltway''' as one of the nation's Top Ten Road Projects in 2002.

]
The portions of the beltway on the western side of I-15 are not designated as I-215, but rather as "Clark County 215". This section is being built completely with local funds, no state or federal money was spent on Clark County 215. A tax measure voted on by the County residents increased funding for the beltway. As a result, it is expected to be fully upgraded to a freeway by 2013, rather than the previous goal of 2025.

In 2003, the entire 53 mile long beltway was opened with the beltway consisting of three different road types: ], a limited access ], and as a ] with all three serving as '''] 215'''. On ], ] a section of freeway was completed that allowed the connection of previously completed freeway sections that covered about half of the roads length from the ] terminus to Charleston Boulevard.

At the Board of County Commission meeting on ], ], the road was renamed as the '''Bruce Woodbury Beltway'''.<ref> {{cite web |url= http://www.co.clark.nv.us/Commission/woodbury.htm |title= Clark County beltway site |accessdate= |format= |work= }}</ref> The Board approved a resolution recognizing Commissioner Woodbury for his many years and efforts in the future of transportation in this valley and of being worthy of having the Beltway renamed for him.

I-215 was built on the ] alignment between Exit 6 (Saint Rose Pkwy/Pecos Road) and Mile 0 (the ]/]/] interchange). Since the Nevada Department of Transportation (NDOT) does not co-sign state routes along Interstate highways, SR 146 was truncated to its current eastern terminus at I-215. SR 146 was co-signed with I-215 from Pecos Road to I-515/US 93/US 95, even though the state highway designation no longer existed in this section when the freeway was completed. Some SR 146 signs still remain on I-215 as of ].

== Major localities on route ==
I-215/CC-215 in Nevada passes through the following cities and towns:

* ]
* ]
* ]
* ]
* ]
* ]

==Exit list==
The entire route is in ].
{| class=wikitable
!Location
!Mile
!]
!Destinations
!Notes
|-
|rowspan=10|]
|
|-
|
|13
|Decatur Boulevard
|
|-
|
|14
|Jones Boulevard
|Opened ], ];<ref name=rmr1/>
|-
|
|15
|] Rainbow Boulevard (])
|Opened ], ];<ref name=rmr1/>
|-
|
|16
|Buffalo Drive
|Opened 2006
|-
|
|17
|Durango Drive
|exit west bound, entrance south bound; opened 2006; signed Durango Drive/Sunset Road
|-
|
|18
|Sunset Road
|Exit south bound, entrance north bound; opened 2006; signed Sunset Road/Durango Drive
|-
|
|19
|Russell Road
|Opened 2006
|-
|
|20
|Tropicana Avenue
|Opened 2006
|-
|
|21
|Flamingo Road
|Signed exit 19 south bound
|-
|rowspan=3|]
|
|23
|Town Center Drive
|] interchange opened 2005
|-
|
|25
|Sahara Avenue
|Opened 2001<ref name=rmr1>{{cite web| url= http://www.rockymountainroads.com/i-215_nv.html | title= Las Vegas Beltway |accesdate=2007-07-24}}</ref>
|-
|
|26
|{{jct|state=NV|SR|159|name1=Charleston Boulevard|city1=Red Rock Canyon}}
|Opened 2001;<ref name=rmr1/> North end of freeway; Clark County/Las Vegas boundary
|-
|rowspan=4|]
|
|
|Far Hills Avenue
|
|-
|
|
|]
|
|-
|
|
|Lake Mead Boulevard (future)<ref>{{cite news |first= |last= |authorlink= |coauthors= |title= Boosted police presence to be residual benefit of new building |url= http://www.viewnews.com/2007/VIEW-Jul-24-Tue-2007/SummerlinSouth/15598691.html |work= ] |publisher=] |date=2007-07-24 |accessdate=2007-07-28 }}</ref>
|
|-
|
|
|Cheyenne Avenue
|Las Vegas/Clark County boundary
|-
|rowspan=4|
|
|
|Lone Mountain Road
|
|-
|
|
|Ann Road
|
|-
|
|35<ref name=posted>Number as posted at exit</ref>
|Hualapai Way
|West end of freeway
|-
|
|37<ref name=posted/>
|Durango Drive
|East end of freeway; Clark County/Las Vegas boundary
|-
|rowspan=3|]
|
|
|{{jct|state=NV|US|95|city1=Las Vegas}}
|-
|
|
|Jones Boulevard
|
|-<!--Bradley Road??-->
|
|
|Decatur Boulevard
|Las Vegas/North Las Vegas boundary
|-
|rowspan=7|]
|
|
|Aliante Parkway
|
|-
|
|
|Revere Street (future){{Fact|date=July 2007}}
|
|-
|
|
|5th Street (future)<ref name= cc-215-1>{{cite web |url= http://www.accessclarkcounty.net/Pubworks/county_projects/beltway/06_bulletin.pdf |title= Beltway construction continues |accessdate=2007-07-28 |format=pdf |work= }}</ref>
|
|-
|
|
|Losee Road
|
|-
|
|44{{Fact|date=July 2007}}
|Pecos Road
|
|-
|
|45{{Fact|date=July 2007}}
|Lamb Boulevard
|
|-
|
|46{{Fact|date=July 2007}}
|Range Road
|
|-
|rowspan=1|
|
|48{{Fact|date=July 2007}}
|{{jct|state=NV|I|15|US|93|city1=Las Vegas}}, ]
|Eastbound exit and westbound entrance
|}

==References==
*
<references/>

==External links==
*
*

Latest revision as of 03:23, 6 April 2020

Redirect to: