Revision as of 06:16, 13 October 2008 editThe Anomebot2 (talk | contribs)Bots, Extended confirmed users1,042,920 edits Adding geodata: {{coord missing|United States}}← Previous edit | Latest revision as of 03:10, 27 July 2024 edit undoJECWV (talk | contribs)Extended confirmed users1,973 editsNo edit summary | ||
(58 intermediate revisions by 32 users not shown) | |||
Line 1: | Line 1: | ||
{{Infobox Bridge | |||
{{Infobox_Bridge | |||
|bridge_name= Robert C. Byrd Bridge | |bridge_name= Robert C. Byrd Bridge | ||
|image= RCByrdBridge-Huntington-WV.jpg | |image= RCByrdBridge-Huntington-WV.jpg | ||
|image_size=300px | |||
|caption= The Robert C. Byrd Bridge, as seen from Harris Riverfront Park | |caption= The Robert C. Byrd Bridge, as seen from Harris Riverfront Park | ||
|official_name= | |official_name= | ||
|also_known_as= | |also_known_as= | ||
|carries= 4 lanes of |
|carries= 4 lanes of {{jct|state=OH|OH|527}} / {{jct|state=WV|WV|527}} | ||
|crosses= ] | |crosses= ] | ||
|locale= ] and ] | |locale= ] and ] | ||
|maint= West Virginia Department of Transportation |
|maint= ] | ||
|id= | |id= | ||
|design= continuous truss | |design= ] | ||
|mainspan= | |mainspan= | ||
|length= 720 ft (219 m) | |length= 720 ft (219 m) | ||
Line 17: | Line 18: | ||
|below= | |below= | ||
|traffic= | |traffic= | ||
|open= |
|open= November 6, 1994 | ||
|closed= | |closed= | ||
|toll= | |toll= | ||
Line 24: | Line 25: | ||
|map_text= | |map_text= | ||
|map_width= | |map_width= | ||
|coordinates={{coord|38|25|28|N|82|27|05|W|display=inline,title}} | |||
|coordinates= | |||
|lat= | |lat= | ||
|long= | |long= | ||
}} | }} | ||
The '''Robert C. Byrd Bridge''' is a 720 |
The '''Robert C. Byrd Bridge''' is a {{convert|720|ft|adj=on}} ] bridge that crosses the ] between ] and ]. The crossing was constructed to replace an old, narrow, two-lane structure that was demolished after 69 years of service in a spectacular implosion on July 17, 1995. The previous bridge, opened in 1926, was Huntington's first bridge across the Ohio River and was designed in a gothic style, complete with four two-ton spires that rested on top of each peak. | ||
The |
The groundbreaking ceremony for the four-lane bridge was held on April 30, 1991. James Watkins, of the ], stated that the importance of the new four-lane span would only be heightened by the construction of the Chesapeake-Proctorville ] bypass that would "begin in 1996.<ref name="BOSM">"Bridge opening sparks memories." The Ironton Tribune. 6 Nov. 1994.</ref>" Work on the bypass did not begin until 2000. | ||
The old 6th Street Bridge closed in the summer of 1993 to allow for the construction of the ramps and approaches in West Virginia and Ohio |
The old 6th Street Bridge closed in the summer of 1993 to allow for the construction of the ramps and approaches in West Virginia and Ohio.<ref name="BOSM"/> The new bridge was named the Robert C. Byrd Bridge under an executive order from former Governor ] to honor the ] from ], who is credited with obtaining the funding for the project that was completed on November 6, 1994. The $32.6 million bridge was constructed with $1.4 coming from ], $5.6 coming from West Virginia, and $25.3 in federal funds. | ||
The famous spires |
The famous spires which once adorned the top of the former span were saved. One is currently on display outside of the ] city hall at the intersection of ] and the Robert C. Byrd Bridge.<ref>"Bridge's old spire getting a new lease." Herald Dispatch. 29 Oct. 1995.</ref> Two others are installed along 9th Street between 3rd and 5th Avenues.<ref>Chambers, Bryan. "Plaza to reopen in December." 26 Nov. 2006 Herald-Dispatch . 27 27 Nov. 2006 {{dead link|date=April 2018 |bot=InternetArchiveBot |fix-attempted=yes }}.</ref> | ||
⚫ | ==References== | ||
<references/> | |||
==See also== | ==See also== | ||
*] | *] | ||
* ] | |||
⚫ | ==References== | ||
{{reflist}} | |||
==External links== | ==External links== | ||
* . | * at Bridges & Tunnels | ||
* |
* | ||
{{Crossings navbox | {{Crossings navbox | ||
Line 51: | Line 53: | ||
|place = ] | |place = ] | ||
|bridge = Robert C. Byrd Bridge | |bridge = Robert C. Byrd Bridge | ||
|bridge signs = ] |
|bridge signs = ]] | ||
|upstream = ] | |upstream = ] | ||
|upstream signs = ] |
|upstream signs = ]] | ||
|downstream = ] | |downstream = ] | ||
|downstream signs = ] | |downstream signs = ] | ||
}} | }} | ||
] | |||
{{coord missing|United States}} | |||
] | |||
] | ] | ||
] | ] | ||
] | ] | ||
] | ] | ||
] | ] | ||
] | |||
] | ] | ||
] | ] | ||
] | |||
] | |||
] |
Latest revision as of 03:10, 27 July 2024
Bridge in Ohio and Huntington, West VirginiaRobert C. Byrd Bridge | |
---|---|
The Robert C. Byrd Bridge, as seen from Harris Riverfront Park | |
Coordinates | 38°25′28″N 82°27′05″W / 38.42444°N 82.45139°W / 38.42444; -82.45139 |
Carries | 4 lanes of SR 527 / WV 527 |
Crosses | Ohio River |
Locale | Chesapeake, Ohio and Huntington, West Virginia |
Maintained by | West Virginia Department of Transportation |
Characteristics | |
Design | continuous truss bridge |
Total length | 720 ft (219 m) |
History | |
Opened | November 6, 1994 |
Location | |
The Robert C. Byrd Bridge is a 720-foot (220 m) continuous truss bridge that crosses the Ohio River between Huntington, West Virginia and Chesapeake, Ohio. The crossing was constructed to replace an old, narrow, two-lane structure that was demolished after 69 years of service in a spectacular implosion on July 17, 1995. The previous bridge, opened in 1926, was Huntington's first bridge across the Ohio River and was designed in a gothic style, complete with four two-ton spires that rested on top of each peak.
The groundbreaking ceremony for the four-lane bridge was held on April 30, 1991. James Watkins, of the Ohio Department of Transportation, stated that the importance of the new four-lane span would only be heightened by the construction of the Chesapeake-Proctorville State Route 7 bypass that would "begin in 1996." Work on the bypass did not begin until 2000.
The old 6th Street Bridge closed in the summer of 1993 to allow for the construction of the ramps and approaches in West Virginia and Ohio. The new bridge was named the Robert C. Byrd Bridge under an executive order from former Governor Gaston Caperton to honor the U.S. senator from West Virginia, who is credited with obtaining the funding for the project that was completed on November 6, 1994. The $32.6 million bridge was constructed with $1.4 coming from Ohio, $5.6 coming from West Virginia, and $25.3 in federal funds.
The famous spires which once adorned the top of the former span were saved. One is currently on display outside of the Chesapeake city hall at the intersection of State Route 7 and the Robert C. Byrd Bridge. Two others are installed along 9th Street between 3rd and 5th Avenues.
See also
References
- ^ "Bridge opening sparks memories." The Ironton Tribune. 6 Nov. 1994.
- "Bridge's old spire getting a new lease." Herald Dispatch. 29 Oct. 1995.
- Chambers, Bryan. "Plaza to reopen in December." 26 Nov. 2006 Herald-Dispatch . 27 27 Nov. 2006 .
External links
- Robert C. Byrd Bridge) at Bridges & Tunnels
- Spires from original Sixth Street Bridge - Clio
Crossings of the Ohio River | ||||
---|---|---|---|---|
|
- Road bridges in Ohio
- Road bridges in West Virginia
- Bridges over the Ohio River
- Buildings and structures in Huntington, West Virginia
- Buildings and structures in Lawrence County, Ohio
- Continuous truss bridges in the United States
- Transportation in Lawrence County, Ohio
- Transportation in Cabell County, West Virginia
- Bridges completed in 1926
- Bridges completed in 1994
- 1926 establishments in Ohio
- 1926 establishments in West Virginia
- Interstate vehicle bridges in the United States