Misplaced Pages

Abraham Lincoln Bridge: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 23:55, 9 February 2023 editBrycecordry (talk | contribs)Extended confirmed users1,772 editsNo edit summary← Previous edit Revision as of 19:40, 27 February 2023 edit undoBlueShirtz (talk | contribs)Extended confirmed users9,340 edits History: Big Four Bridge opened to foot traffic from the Kentucky side in 2013Next edit →
Line 41: Line 41:
On July 19, 2006, the final design alternatives for the bridge were announced. The three designs included a three-span arch, a cable-stayed design with three towers, and a cable-stayed type with a single A-shaped support tower. It was also announced that the projected cost for the bridge would be $203 million. On July 19, 2006, the final design alternatives for the bridge were announced. The three designs included a three-span arch, a cable-stayed design with three towers, and a cable-stayed type with a single A-shaped support tower. It was also announced that the projected cost for the bridge would be $203 million.


The structure is an additional bridge in downtown Louisville joining the John F. Kennedy Memorial Bridge erected between spring 1961 and late 1963 at a cost of $10 million ($77.5 million in 2015 dollars); the four-lane ], constructed from June 1928 and to October 31, 1929, and the ], which operated as a railroad bridge from 1895 to 1969 and reopened as a pedestrian bridge in May 2014. The structure is an additional bridge in downtown Louisville joining the John F. Kennedy Memorial Bridge erected between spring 1961 and late 1963 at a cost of $10 million ($77.5 million in 2015 dollars); the four-lane ], constructed from June 1928 and to October 31, 1929, and the ], which operated as a railroad bridge from 1895 to 1969 and reopened as a pedestrian bridge in 2013.


Some critics say that the Abraham Lincoln Bridge is not being used enough to warrant its cost of construction. The bridge, originally built to ease congestion, is proving to be unused by commuters who do not want to pay the toll.<ref>{{cite web |title=People aren't using Kentucky's new $1.3 billion bridge and highway system |url=https://archpaper.com/2018/11/ohio-bridges-project-louisville-kentucky/ |website=Archpaper.com |accessdate=11 May 2019 |date=30 November 2018}}</ref> Among the original planners for bridge funding were some who resisted using tolls and the electronic ] technique of payment without actual toll booths.<ref>{{cite web |title=Abraham Lincoln Bridge |url=http://bridgestunnels.com/bridges/ohio-river/abraham-lincoln-bridge/ |website=Bridges and Tunnels |accessdate=11 May 2019}}</ref><ref>{{cite web |title=Tolling on bridges begins Friday: What you need to know |url=https://insiderlouisville.com/government/tolling-on-bridges-begins-friday-what-you-need-to-know/ |website=Insider Louisville |accessdate=11 May 2019 |date=28 December 2016}}</ref><ref>{{cite web |title=RiverLink {{!}} Now We're Moving |url=https://riverlink.com/ |accessdate=11 May 2019}}</ref> Some critics say that the Abraham Lincoln Bridge is not being used enough to warrant its cost of construction. The bridge, originally built to ease congestion, is proving to be unused by commuters who do not want to pay the toll.<ref>{{cite web |title=People aren't using Kentucky's new $1.3 billion bridge and highway system |url=https://archpaper.com/2018/11/ohio-bridges-project-louisville-kentucky/ |website=Archpaper.com |accessdate=11 May 2019 |date=30 November 2018}}</ref> Among the original planners for bridge funding were some who resisted using tolls and the electronic ] technique of payment without actual toll booths.<ref>{{cite web |title=Abraham Lincoln Bridge |url=http://bridgestunnels.com/bridges/ohio-river/abraham-lincoln-bridge/ |website=Bridges and Tunnels |accessdate=11 May 2019}}</ref><ref>{{cite web |title=Tolling on bridges begins Friday: What you need to know |url=https://insiderlouisville.com/government/tolling-on-bridges-begins-friday-what-you-need-to-know/ |website=Insider Louisville |accessdate=11 May 2019 |date=28 December 2016}}</ref><ref>{{cite web |title=RiverLink {{!}} Now We're Moving |url=https://riverlink.com/ |accessdate=11 May 2019}}</ref>

Revision as of 19:40, 27 February 2023

Cable-stayed bridge carrying northbound I-65 across the Ohio River at Louisville
Abraham Lincoln Bridge
The Abraham Lincoln Bridge viewed from
the Big Four Bridge, with the parallel John F. Kennedy Memorial Bridge in the background
Coordinates38°15′52″N 85°44′37″W / 38.26444°N 85.74361°W / 38.26444; -85.74361
Carries6 lanes of northbound I-65
CrossesOhio River
LocaleLouisville, Kentucky and Jeffersonville, Indiana
Maintained byKentucky Transportation Cabinet
Characteristics
DesignCable-stayed bridge
Total length2,100 ft (640 m)
Longest span700 ft (213 m) × 2 spans
History
OpenedDecember 6, 2015
Statistics
Toll$2.10 (with E-ZPass/RiverLink transponder)
$1.05 frequent user (applies to all trips in calendar month with 40+ trips)
$3.16 (with Pay-By-Plate account)
$4.20 (Pay-By-Plate with no account)
Location

The Abraham Lincoln Bridge is a six-lane, single-deck cable-stayed bridge carrying northbound Interstate 65 across the Ohio River, connecting Louisville, Kentucky, and Jeffersonville, Indiana. The main span is 700 feet (213 m) (two spans) and the bridge has a total length of 2,100 feet (640 m). It is named after U.S. President Abraham Lincoln, who was born in Kentucky and grew up in Southern Indiana.

History

The Abraham Lincoln Bridge opened on December 6, 2015, and is parallel to the John F. Kennedy Memorial Bridge upstream and carries six lanes of northbound I-65 traffic. Pedestrian and bicycle lanes were in the original plans, but were later removed. The existing I-65 John F. Kennedy Memorial Bridge, completed in 1963, was renovated for six lanes of southbound traffic. On October 10, 2016, five lanes of the Kennedy Bridge reopened, at which time the Lincoln Bridge began carrying only northbound traffic after several months of carrying three lanes of traffic in both directions. Both spans opened, with six lanes of traffic in each direction, in December 2016. Tolling on both spans began on December 30, 2016.

A Structured Public Involvement protocol developed by Drs. K. Bailey and T. Grossardt was used to elicit public preferences for the design of the structure. From spring 2005 to summer 2006 several hundred citizens attended a series of public meetings in Louisville, Kentucky and Jeffersonville, Indiana and evaluated a range of bridge design options using 3D visualizations. This public involvement process focused in on designs that the public felt were more suitable, as shown by their polling scores. The SPI public involvement process itself was evaluated by anonymous, real-time citizen polling at the open public meetings.

On July 19, 2006, the final design alternatives for the bridge were announced. The three designs included a three-span arch, a cable-stayed design with three towers, and a cable-stayed type with a single A-shaped support tower. It was also announced that the projected cost for the bridge would be $203 million.

The structure is an additional bridge in downtown Louisville joining the John F. Kennedy Memorial Bridge erected between spring 1961 and late 1963 at a cost of $10 million ($77.5 million in 2015 dollars); the four-lane George Rogers Clark Memorial Bridge, constructed from June 1928 and to October 31, 1929, and the Big Four Bridge, which operated as a railroad bridge from 1895 to 1969 and reopened as a pedestrian bridge in 2013.

Some critics say that the Abraham Lincoln Bridge is not being used enough to warrant its cost of construction. The bridge, originally built to ease congestion, is proving to be unused by commuters who do not want to pay the toll. Among the original planners for bridge funding were some who resisted using tolls and the electronic transponder technique of payment without actual toll booths.

See also

References

  1. https://maps.kytc.ky.gov/bridgedataminer/
  2. Shafer, Sheldon S. (November 30, 2015). "It's official! New bridge named for Lincoln". The Courier-Journal. Louisville. Retrieved 2015-11-30.
  3. "Modern Steel Construction". www.aisc.org. Retrieved 11 May 2019.
  4. Coghill, Erica (December 7, 2015). "Abraham Lincoln Bridge officially opens". WLKY. Louisville. Retrieved 2015-12-07.
  5. Helmer, Katrina (October 10, 2016). "Kennedy Bridge open 5 lanes of southbound traffic". Louisville: WDRB. Retrieved October 11, 2016.
  6. "High demand depletes RiverLink transponders on Ohio River bridges". Jeffersonville, IN: News and Tribune. January 2, 2016. Retrieved 2017-01-03. The Lincoln Bridge carries six lanes of I-65 North traffic, and the Kennedy carries six lanes of I-65 South traffic.
  7. Sirianni, Maura; Green, Marcus; Mitchell, Kyle (December 30, 2016). "Tolling begins on the Lewis and Clark, Lincoln and Kennedy bridges". WDRB. Retrieved 2017-01-03. During the first 12 hours of tolling, more than 52,000 vehicles crossed the three toll bridges in the RiverLink system, officials said.
  8. "People aren't using Kentucky's new $1.3 billion bridge and highway system". Archpaper.com. 30 November 2018. Retrieved 11 May 2019.
  9. "Abraham Lincoln Bridge". Bridges and Tunnels. Retrieved 11 May 2019.
  10. "Tolling on bridges begins Friday: What you need to know". Insider Louisville. 28 December 2016. Retrieved 11 May 2019.
  11. "RiverLink | Now We're Moving". Retrieved 11 May 2019.

External links

Abraham Lincoln
Presidency
Speeches
Life
and views
Homes
and places
Elections
Assassination
Legacy and
memorials
Statues
Family
Bridges of the Ohio River
Upstream
Big Four Bridge
pedestrian and bicycle
Abraham Lincoln Bridge
Northbound
Downstream
John F. Kennedy Memorial Bridge
Southbound
Categories: