Revision as of 08:07, 17 October 2007 editWaacstats (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers1,348,587 editsm Stub-sorting. You can help!← Previous edit | Revision as of 18:10, 15 November 2007 edit undoArcAngel (talk | contribs)Extended confirmed users, Pending changes reviewers, Rollbackers16,723 editsNo edit summaryNext edit → | ||
Line 18: | Line 18: | ||
|below= | |below= | ||
|traffic= | |traffic= | ||
|open= Scheduled for ], ] | |open= Scheduled for ], ] | ||
|closed= | |closed= | ||
|toll= | |toll= | ||
Line 30: | Line 30: | ||
}} | }} | ||
'''Blennerhassett Island Bridge''' is currently under construction. The bridge will be an ] upon its completion in ], ] at a cost of $120 million dollars. This is the final piece to the ] project which is apart of the ]<ref name="Go Bridge">{{cite web|url=http://www.gobridges.com/article.asp?id=323|title=Innovative tied-arch steel bridge to span Ohio River|author=GoBridges.com|accessdate=2005-05-28}}</ref>. The bridge will be marked ] for the entire structure once it's completed. | '''Blennerhassett Island Bridge''' is currently under construction. The bridge will be an ] upon its completion in ], ] | ||
<ref name="Delayed">{{cite web|url=http://www.dispatch.com/live/content/local_news/stories/2007/11/15/bridge.html|title=Bridge Opening Delayed||author=Columbus Dispatch|accessdate=2007-11-15}}</ref> at a cost of $120 million dollars. This is the final piece to the ] project which is apart of the ]<ref name="Go Bridge">{{cite web|url=http://www.gobridges.com/article.asp?id=323|title=Innovative tied-arch steel bridge to span Ohio River|author=GoBridges.com|accessdate=2005-05-28}}</ref>. The bridge will be marked ] for the entire structure once it's completed. | |||
==Details== | ==Details== |
Revision as of 18:10, 15 November 2007
Template:Bridge under construction
Bridge in Ohio and Parkersburg, West VirginiaBlennerhassett Island Bridge | |
---|---|
Coordinates | 39°16′36″N 81°38′49″W / 39.2767°N 81.6469°W / 39.2767; -81.6469 |
Carries | Will carry (4 lanes) |
Crosses | Ohio River |
Locale | Belpre, Ohio and Parkersburg, West Virginia |
Maintained by | Ohio Department of Transportation West Virginia Department of Transportation |
Characteristics | |
Design | Through arch bridge |
Total length | 4,009 feet (1,222 m) |
Width | 107 feet (33 m) |
Longest span | 878 feet (268 m) |
Clearance above | 76 feet (23 m) |
History | |
Opened | Scheduled for April, 2008 |
Location | |
Blennerhassett Island Bridge is currently under construction. The bridge will be an tied-arch bridge upon its completion in April, 2008 at a cost of $120 million dollars. This is the final piece to the Corridor D project which is apart of the Appalachian Development Highway System. The bridge will be marked U.S. 50 for the entire structure once it's completed.
Details
The bridge will travel over the Ohio River and the historic Blennerhassett Island west of Belpre and Parkersburg. The bridge will be owned by the ODOT and WVDOT. The bridge is currently being constructed by the Walsh Construction Company of Chicago.
References
- Columbus Dispatch. "Bridge Opening Delayed". Retrieved 2007-11-15.
{{cite web}}
: Cite has empty unknown parameter:|1=
(help) - ^ GoBridges.com. "Innovative tied-arch steel bridge to span Ohio River". Retrieved 2005-05-28.
External links
- Construction Cam
- Construction Photos
- Corridor D Bridge Site
- EL Robinson Design Team of Blennerhasset Island Bridge
- GoBridges.com Article
Crossings of the Ohio River | ||||
---|---|---|---|---|
|
This article about a building or structure in Ohio is a stub. You can help Misplaced Pages by expanding it. |
This article about a building or structure in West Virginia is a stub. You can help Misplaced Pages by expanding it. |
This article about a specific bridge in the United States is a stub. You can help Misplaced Pages by expanding it. |