Revision as of 03:10, 6 March 2004 editEvercat (talk | contribs)Extended confirmed users16,518 editsm disambig← Previous edit | Revision as of 15:32, 13 March 2004 edit undoBobblewik (talk | contribs)66,026 edits added metric values, 'Miles travelled' -> 'Distance travelled'Next edit → | ||
Line 15: | Line 15: | ||
<TR><TD>Landing:</td><td>11:44 a.m. EDT, October 18, 2002. KSC Runway 33</td></tr> | <TR><TD>Landing:</td><td>11:44 a.m. EDT, October 18, 2002. KSC Runway 33</td></tr> | ||
<TR><TD>Duration:</td><td>10 days, 19 hours, 58 minutes, 44 seconds.</td></tr> | <TR><TD>Duration:</td><td>10 days, 19 hours, 58 minutes, 44 seconds.</td></tr> | ||
<TR><TD>Orbit Altitude:</td><td> |
<TR><TD>Orbit Altitude:</td><td>122 nautical miles (226 km)</td></tr> | ||
<TR><TD>Orbit Inclination:</td><td>51.6 degrees </td></tr> | <TR><TD>Orbit Inclination:</td><td>51.6 degrees </td></tr> | ||
<TR><TD> |
<TR><TD>Distance traveled:</td><td>4.5 million miles (7.2 million km)</td></tr> | ||
<tr> | <tr> | ||
<th colspan="2" align=center bgcolor="#FFDEAD">'''Crew photo'''</th></tr> | <th colspan="2" align=center bgcolor="#FFDEAD">'''Crew photo'''</th></tr> | ||
Line 36: | Line 36: | ||
the Integrated Truss Assembly S1 (Starboard Side Thermal Radiator Truss) | the Integrated Truss Assembly S1 (Starboard Side Thermal Radiator Truss) | ||
and the Crew Equipment Translation Aid (CETA) Cart to the Space Station. | and the Crew Equipment Translation Aid (CETA) Cart to the Space Station. | ||
The S1 Truss is 45 |
The S1 Truss is 45 ft (13.7 m) long, 15 ft (4.6 m) wide and 10 ft (3.0 m) tall. It weighs | ||
approximately 31,000 |
approximately 31,000 lb (14 t). The S1 truss was attached to the S0 | ||
truss (Launched April 8, 2002 onboard STS-110) and uses 637 |
truss (Launched April 8, 2002 onboard STS-110) and uses 637 lb (289 kg) | ||
of anhydrous ammonia in three heat rejection radiators. The CETA | of anhydrous ammonia in three heat rejection radiators. The CETA | ||
cart was attached to the Mobile Transporter (also launched on STS-110) | cart was attached to the Mobile Transporter (also launched on STS-110) |
Revision as of 15:32, 13 March 2004
Mission Insignia | |
---|---|
File:Sts-112-patch.jpg | |
Mission Statistics | |
Mission: | STS-51 |
Shuttle: | Atlantis |
Launch Pad: | 39-B |
Launch: | October 7, 2002 3:46 p.m. EDT |
Landing: | 11:44 a.m. EDT, October 18, 2002. KSC Runway 33 |
Duration: | 10 days, 19 hours, 58 minutes, 44 seconds. |
Orbit Altitude: | 122 nautical miles (226 km) |
Orbit Inclination: | 51.6 degrees |
Distance traveled: | 4.5 million miles (7.2 million km) |
Crew photo | |
File:Sts-112-crew.gif |
Crew
- Jeffrey S. Ashby (3), Commander
- Pamela A. Melroy (2), Pilot
- David A. Wolf (3), Mission Specialist
- Piers J. Sellers (1), Mission Specialist
- Sandra H. Magnus (1), Mission Specialist
- Fyodor N. Yurchikhin (1) (RSC), Mission Specialist
Mission Highlights
International Space Station Assembly Mission 9A. This mission delivered the Integrated Truss Assembly S1 (Starboard Side Thermal Radiator Truss) and the Crew Equipment Translation Aid (CETA) Cart to the Space Station. The S1 Truss is 45 ft (13.7 m) long, 15 ft (4.6 m) wide and 10 ft (3.0 m) tall. It weighs approximately 31,000 lb (14 t). The S1 truss was attached to the S0 truss (Launched April 8, 2002 onboard STS-110) and uses 637 lb (289 kg) of anhydrous ammonia in three heat rejection radiators. The CETA cart was attached to the Mobile Transporter (also launched on STS-110) to be used by assembly crews on later missions. STS-112 also carried several science experiments to the station including the Plant Generic Bioprocessing Apparatus (PGBA), Commercial Generic Bioprocessing Apparatus (CGBA), the Protein Crystal Growth Single-locker Thermal Enclosure System housing the Protein Crystillization Apparatus for Microgravity (PCG-STES-PCAM) and samples for the Zeolite Crystal Growth Furnace (ZCG) experiment.
Related articles
- Space science
- Space shuttle
- List of space shuttle missions
- List of human spaceflights chronologically
External Links
Previous Mission: STS-111 |
Space Shuttle program | Next Mission: STS-113 |