Misplaced Pages

Wittpenn Bridge: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 17:11, 1 May 2009 editDenimadept (talk | contribs)Extended confirmed users14,052 edits CONVERT is your friend. Add coord← Previous edit Revision as of 17:16, 1 May 2009 edit undoDenimadept (talk | contribs)Extended confirmed users14,052 edits coord is present, add Structurae linkNext edit →
Line 40: Line 40:
* *
* *
* {{Structurae|id=s0043336|name=Wittpenn Bridge}}

{{coord missing|New Jersey}}


] ]

Revision as of 17:16, 1 May 2009

Bridge in New Jersey and Kearny, New Jersey
Wittpenn Bridge
The Wittpenn Bridge carries NJ Route 7 over the Hackensack River
Coordinates40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge)
Carries4 Lanes of NJ Route 7
CrossesHackensack River
LocaleJersey City, New Jersey and Kearny, New Jersey
Official nameWittpenn Bridge
Other name(s)Route 7 Bridge
Maintained byNew Jersey Department of Transportation
Characteristics
DesignLift bridge
Total length2,169 feet (661 m)
Width40 feet (12 m)
Longest span83 feet (25 m)
Clearance below35 feet (11 m) (lowered)
100 feet (30 m) (raised)
History
OpenedNovember 5, 1930
Location

The Wittpenn Bridge is a vertical lift bridge that carries New Jersey Route 7 over the Hackensack River connecting Kearny and Jersey City, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge is comprised of four 10-foot (3.0 m)-wide lanes, extending 2,169 feet (661 m) and standing 35 feet (11 m) above mean high water with an 83-foot (25 m) main lift span. Bridge construction commenced 1927, and was opened to vehicular traffic November 5, 1930. The bridge has an Annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks

When raised, the bridge provides 100 feet (30 m) of clearance for ships. In 2005, the bridge was raised to accommodate 80 boats passing underneath, a process that takes 15 minutes to raise the lift span.

The New Jersey Department of Transportation (NJDOT) is developing plans to replace the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. Once funding issues have been addressed, construction is expected to start in the spring of 2010. The new bridge would be situated just north of the existing bridge.

See also

References

  1. ^ Picture this: Drawbridge Operator, The Record (Bergen County), April 11, 2005
  2. Route 7 Wittpenn Bridge - Frequently Asked Questions, accessed October 19, 2006

External links

Categories: