Misplaced Pages

Railway electrification in Great Britain: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 08:56, 18 August 2006 editBaseTurnComplete (talk | contribs)Extended confirmed users1,932 edits 1500 V DC Overhead← Previous edit Revision as of 10:24, 19 August 2006 edit undoQuantumEngineer (talk | contribs)481 editsm 650 to 850v DC []: spNext edit →
Line 3: Line 3:
==650 to 850v DC ]== ==650 to 850v DC ]==


] ]


* ] / ] / ] - everything but a few freight branches, ], ], Uckfield branch of the ] and services through Salisbury. * ] / ] / ] - everything but a few freight branches, ], ], Uckfield branch of the ] and services through Salisbury.

Revision as of 10:24, 19 August 2006

40% (3,062 miles / 4,928 km) of the British rail network is electrified and 60% of all rail journeys are by electric traction (both by locomotives and Multiple Units).

650 to 850v DC Third rail

An example of third rail

630 V DC Fourth Rail

The Tube's 4th rail system

1200 V DC Side Contact rail

  • Manchester Victoria - Bury and

1500 V DC Overhead

Tyne & Wear Metro is the only current 1500 V DC system in the UK

3500 V DC Overhead

  • Holcombe Brook Branch
  • Manchester Victoria - Bury (to Third Rail in 1918)

6600 (6.6K) V AC Overhead @25Hz

25000 (25K) V AC Overhead @50Hz

The West Coast Main Line is electrified at 25 kV AC Overhead

See also

External links

Categories: