Revision as of 20:36, 16 June 2017 edit2600:1012:b001:2497:58bb:d51a:eb9f:6ec (talk)No edit summaryTags: Mobile edit Mobile web edit← Previous edit | Revision as of 07:02, 1 July 2017 edit undoRed Rock Canyon (talk | contribs)Extended confirmed users1,334 edits →Project: Updated to reflect current funding situation and announced plans for the project.Next edit → | ||
Line 6: | Line 6: | ||
==Project== | ==Project== | ||
As of 2017, the ] (Metro) has $7.8 billion in funds available for construction beginning 2026. The plan included in the ] transportation funding measure is to build improvements in three stages: additional lanes to be used for express bus service to open by 2028, an 8.8-mile transit project between the ]’s ] and the ]’s Wilshire/Westwood Station by 2035, and an extension to LAX is planned to be completed by 2059.<ref>{{cite web|last=Hymon|first=Steve|title=Of monorails, Measure M and the Sepulveda Pass; How We Roll, June 14|url=http://thesource.metro.net/2017/04/26/metro-releases-rfp-to-study-sepulveda-pass-transit-options/|publisher=LACMTA|accessdate=July 1, 2017}}</ref> In April 2017, Metro issued a ] to study alternatives, and several companies sent unsolicited proposals to accelerate the project via public-private partnerships. The feasibility study is expected to be completed by Fall 2018.<ref>{{cite web|last=Sotero|first=Dave|title=Metro releases RFP to study Sepulveda Pass transit options|url=http://thesource.metro.net/2017/04/26/metro-releases-rfp-to-study-sepulveda-pass-transit-options/|publisher=LACMTA|accessdate=July 1, 2017}}</ref> | |||
<!-- Deleted image removed: ] --> | |||
The project is considered a way to relieve freeway congestion and provide an alternative to I-405 through the ]. A total of $1.0 billion of funding is allotted to the Sepulveda Pass Transit Corridor project under ].<ref>{{cite web|title=Proposed One-Half Cent Sales Tax for Transportation|url=http://www.metro.net/measurer/images/expenditure_plan.pdf|publisher=Metro|accessdate=April 14, 2011}}</ref> Under Measure R, the expected completion of the project is 2039, but with the 30/10 Plan, now known nationally as America Fast Forward, the project could be built in less than 10 years. | |||
LA Metro's current plan is to use the 2016 passed Measure M funds increasing the sales tax by 1/2 cent. The bond is a permanent sales tax unlike Measure R that is temporary. | |||
=== Advocacy === | === Advocacy === |
Revision as of 07:02, 1 July 2017
The Sepulveda Pass Transit Corridor is a planned transit corridor connecting the Los Angeles Basin to the San Fernando Valley. Project alternatives along the four mile section of I-405, with an option for a monorail, light rail or heavy rail line along the tunnel corridor; providing bus-only on- and off-ramps for bus rapid transit service on the I-405 carpool lanes; and implementing peak-hour bus rapid transit lanes on the freeway’s shoulders.
The Sepulveda Pass Interstate 405 commute between Interstate 10 and CA Highway 101 is the most heavily congested freeways in the United States with over 500,000 commuters daily.
The most popular idea has been a rail transit tunnel, as the rugged terrain of the pass makes surface and elevated alternatives almost equally expensive. Metro Chief Executive Philip Washington has proposed a $20 billion tunnel under the pass containing a toll road and a rapid transit rail line. The project would be financed in partnership with private companies, which would be allowed to collect tolls for a certain number of years. As of 2015, Metro has $1 billion in funds available for construction beginning 2028; thus funding from other sources would have to be found as well.
Project
As of 2017, the Los Angeles County Metropolitan Transportation Authority (Metro) has $7.8 billion in funds available for construction beginning 2026. The plan included in the Measure M transportation funding measure is to build improvements in three stages: additional lanes to be used for express bus service to open by 2028, an 8.8-mile transit project between the Orange Line’s Van Nuys Station and the Purple Line Extension’s Wilshire/Westwood Station by 2035, and an extension to LAX is planned to be completed by 2059. In April 2017, Metro issued a Request for Proposals to study alternatives, and several companies sent unsolicited proposals to accelerate the project via public-private partnerships. The feasibility study is expected to be completed by Fall 2018.
Advocacy
Transit advocates have proposed combining the Van Nuys Transit Corridor and Sepulveda Pass Corridor into a single study with an aim to connect Sylmar, Van Nuys, the Orange Line, Sherman Oaks, UCLA, and the future Westwood/UCLA Purple Line station, with a future extension south to the Expo Line, Los Angeles International Airport, South Bay, or beyond.
References
- "Sepulveda Transit Corridor". Sepulveda Transit Corridor. LACMTA.
- Los Angeles Magazine
- Hymon, Steve. "Of monorails, Measure M and the Sepulveda Pass; How We Roll, June 14". LACMTA. Retrieved July 1, 2017.
- Sotero, Dave. "Metro releases RFP to study Sepulveda Pass transit options". LACMTA. Retrieved July 1, 2017.
- Reed, Bart. "Valley-Westside Rail Tunnel". The Transit Coalition. Retrieved April 12, 2011.