Misplaced Pages

LOHAS Park: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 02:54, 17 September 2020 editLKRandom (talk | contribs)452 editsNo edit summaryTag: Visual edit← Previous edit Revision as of 05:53, 29 September 2020 edit undoMarxistfounder (talk | contribs)Extended confirmed users17,689 editsmNo edit summaryNext edit →
Line 7: Line 7:
] ]
] ]
] ]]]
'''LOHAS Park''' ({{zh|t=日出康城}}) is a ] seaside residential development of the ], located in ] Area 86, ]. After its full completion, it will be the largest single residential enclave in the territory. '''LOHAS Park''' ({{zh|t=日出康城}}) is a ] seaside residential development of the ], located in ] Area 86, ]. After its full completion, it will be the largest single residential enclave in the territory.



Revision as of 05:53, 29 September 2020

Private Housing estate in Tseung Kwan O, Hong Kong
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
This article possibly contains original research. Please improve it by verifying the claims made and adding inline citations. Statements consisting only of original research should be removed. (September 2017) (Learn how and when to remove this message)
This article needs to be updated. Please help update this article to reflect recent events or newly available information. (November 2010)
(Learn how and when to remove this message)

Aerial view of LOHAS Park 2018
Aerial view of LOHAS Park 2014
LOHAS Park Map. The largest place will be Shopping Mall The LOHAS

LOHAS Park (Chinese: 日出康城) is a Hong Kong seaside residential development of the MTR Corporation, located in Tseung Kwan O Area 86, New Territories. After its full completion, it will be the largest single residential enclave in the territory.

Name and concept

Formerly named "Dream City", it was renamed LOHAS Park. LOHAS is an acronym for "lifestyle of health and sustainability". The Chinese name means "sunrise health city". The CLP power substation for Phase I The Capitol (Chinese: 首都; Cantonese Yale: Sáudōu) retains the original name "Dream City Power Substation".

The MTR designated LOHAS Park an 'environmental protection city' when planning began in 2002. After the SARS epidemic in early 2003, the element of 'health' was incorporated. Following controversy over "wall effect" buildings in 2007, the developers promised there will be sufficient space to allow wind to blow through the estate. LOHAS Park was built at the east of the reclaimed land near the Tseung Kwan O landfill. According to an MTR spokesman, there is also an operational landfill about 1 km from development, and the problem of smell from the landfill has been solved since the collection of domestic waste was halted in 2014.

The project

Le Prestige under construction in August 2009
LOHAS Park in December 2011
Central Park in LOHAS Park

The 3,550,000 square feet (330,000 m) estate is divided into 13 phases, composing of 50 high-rise residential towers, offering 21,500 apartments to accommodate 58,000 residents in the site area, which are to be completed before 2025. These will sit above the MTR LOHAS Park Station. The gross floor area (GFA) for domestic purposes is up to 1.6 million square metres, and retail GFA will occupy up to 50,000 m

Apart from residential development, LOHAS Park will also include 3 shopping malls upon completion, including a 480,000-square-foot iconic MTR mall named THE LOHAS, which opened in 2020, it will contain the largest indoor ice-skating rink in Hong Kong and the largest cinema in the whole Tseung Kwan O town. There will also be green area of 1,000,000 square feet, including a 200,000-square-foot central park named The Park with pet recreation facilities, icon building, waterfalls and lawns.

Environmental features

  • 1.4 million sq ft (40% of the site area) of common area with greenery: the common area will include a 200,000 sq ft (19,000 m) park and a 330-metre seafront promenade.
  • People and cars will be segregated – pedestrians can walk to various facilities without having to cross a road since all the places are linked with covered walkways.
  • The garden will be watered by a 440,000-litre water-recycling system.
  • LOHAS Park, itself on land reclaimed from the sea, is surrounded by land reclaimed as landfill. The large piece of greenery immediately to the north of LOHAS Park is the recovered land from the old Tseung Kwan O Stage I landfill which closed in 1995. The large mountain slope on the eastern side of LOHAS Park is the old Tseung Kwan O Stage II/III landfill which closed in 1994.
  • SENT - The above landfills should not be confused with the operating South East New Territories (SENT) Landfill which is about 1 km southeast of LOHAS Park. The SENT is commonly called the Tseung Kwan O landfill in the media. The SENT is expected to become full in the financial year 2014/2015 if the decision to extend its coverage area is not granted.

Phases

  • Phase I: The Capitol,
  • Phase II-A: Le Prestige,
  • Phase II-B: Le Prime,
  • Phase II-C: La Splendeur,
  • Phase III: Hemera,
  • Phase IV-A: Wings at Sea,
  • Phase IV-B: Wings at Sea II,
  • Phase V: Malibu,
  • Phase VI: LP6,
  • Phase VII-A: Montara,
  • Phase VII-B: Grand Montara,
  • Phase VIII: Sea to Sky
  • Phase IX-A: Marini,
  • Phase IX-B: Grand Marini,
  • Phase IX-C: Ocean Marini,
  • Shopping Mall: THE LOHAS

The Capitol (首都; Sáudōu) belongs to the Phase I of the development. It was jointly developed by Cheung Kong Holdings and MTR Corporation in 2008. It comprises 5 high-rise buildings up to 68 storeys, occupying 1,380,000 square feet (128,000 m) of floor area and offering 2,096 flats.

Phase II of the development was jointly developed by Cheung Kong Holdings and MTR Corporation and Nan Fung Development.

Le Prestige (Chinese: 領都; Cantonese Yale: Líhngdōu), Phase IIA (the first of three sub-phases of Phase II of the development) comprises four high-rise buildings up to 70 storeys, offering 1,688 flats and was completed in 2009.

Le Prime (Chinese: 領峰; Cantonese Yale: Líhngfūng), Phase IIB (the second of three sub-phases of Phase II of the development) comprises three high-rise buildings up to 76 storeys, offering 1,416 flats and was completed in 2011.

La Splendeur (Chinese: 領凱; Cantonese Yale: Líhnghói), Phase IIC (the third of three sub-phases of Phase II of the development) comprises three high-rise buildings up to 72 storeys, offering 1,416 flats and was completed in 2013. Phase II apartments facing East can enjoy the unrestricted view to the permanent recovered greenery. The planned new RTHK headquarters will lie between LOHAS Park Phase II and the greenery. The RTHK building headquarters will be only 10 storeys high compared to the 70+ storeys high of the LOHAS park Phase II towers.

Phase III was jointly developed by Cheung Kong Holdings, the MTR Corporation and Nan Fung Group. It is connected directly to LOHAS Park MTR Station.

Hemera (Chinese: 緻藍天} belongs to Phase III. It comprises 4 high-rise towers up to 66 storeys. The towers are named after various gemstones namely Diamond, Emerald, Amber and Topaz.

Phase IV is being jointly developed by Sun Hung Kai Properties and the MTR Corporation.

Wings at Sea (Chinese: 晉海} belongs to Phase IV. It comprises two phases: Phase IVA is comprised off Towers 1 and 2 while Phase IVB also known as Wings at Sea II is comprised off Towers 3 and 5.

A new covered walkway is under construction which will offer direct access to the MTR station from the Wan Po Road. Currently, access to the LOHAS Park MTR station by other housing estates residents at the Northern side of the Wan Po Road need to pass through the Phase I.

According to the LOHAS Park master plan, Phase I and Phase II of LOHAS Park are furthest from the permanent sea front, as future phases are constructed, the current seaview apartments will have progressively less seaview.

In April 2015, the tender for LOHAS Park Package 4 was awarded to a subsidiary of Sun Hung Kai Properties. In November 2015, the tender for LOHAS Park Package 5 was awarded to a subsidiary of Wheelock & Co.

The LOHAS

A shopping mall called The LOHAS is located in LOHAS park. It opened in August of 2020. The mall will also be connected to Phase VIIA: Montara.

See also

References

  1. ^ Victor Cheung, Green, green grass of home Archived 21 April 2008 at the Wayback Machine, The Standard, 8 November 2007
  2. "Official Website: Planning parameters". MTR Corporation. Archived from the original on 10 October 2009. Retrieved 4 October 2009.
  3. "Landfill Restoration and Afteruse - Summary Information - Environmental Protection Department". Retrieved 7 June 2016.
  4. "Problems & Solutions - Environmental Protection Department". Retrieved 7 June 2016.
  5. "首都 The Capitol ( 日出康城第 1 期 / 第 1-5 座 ) 解碼 - 康城物業 專注經營.康城峻瀅 ( Lohas Park )". Retrieved 7 June 2016.
  6. "http://www.thestandard.com.hk/news_detail.asp?we_cat=16&art_id=56455&sid=16188755&con_type=3&d_str=20071108&fc=7". Archived from the original on 13 July 2015. Retrieved 7 June 2016. {{cite web}}: External link in |title= (help)
  7. "http://www.thestandard.com.hk/news_detail.asp?we_cat=16&art_id=62196&sid=17807105&con_type=1&d_str=20080228&fc=7". Archived from the original on 13 July 2015. Retrieved 7 June 2016. {{cite web}}: External link in |title= (help)
  8. Fung, Veronica (20 December 2007). "LOHAS Park to be built in Hong Kong". The Standard. Archived from the original on 21 February 2009. Retrieved 11 December 2009.
  9. "領都 Le Prestige ( 第 2a 期 / 第 1-5 座 ) 解碼 - 康城物業 專注經營.康城峻瀅 ( Lohas Park )". Retrieved 7 June 2016.
  10. "領峯 Le Prime ( 第 2b 期 / 第 6-8 座 ) 解碼 - 康城物業 專注經營.康城峻瀅 ( Lohas Park )". Retrieved 7 June 2016.
  11. "Pictures Far From Reality" (PDF) (Press release). Green Sense. 7 June 2009.
  12. "領凱 La Splendeur ( 第 2c 期 / 第 9-11 座 ) 解碼 - 康城物業 專注經營.康城峻瀅 ( Lohas Park )". Retrieved 7 June 2016.
  13. Richitt (22 September 2018). "緻藍天 | HEMERA – 長實、南豐及港鐵的香港將軍澳分層屋苑項目". 覓至房 (in Chinese (Hong Kong)). Retrieved 29 August 2019.
  14. 頭條日報. "將軍澳晉海下周開價". 頭條日報 Headline Daily (in Chinese (Hong Kong)). Retrieved 30 August 2019.
  15. "2014 Annual Report" (PDF). MTR Corporation.
  16. "商場The LOHAS康城明年下半年開幕 - 20190511 - 報章內容 財經". 明報財經網 (in Chinese (Taiwan)). Retrieved 29 August 2019.

External links

Sai Kung District
Areas
Landmarks
Beaches
  • Clear Water Bay First Beach
  • Hap Mun Bay Beach
  • Kiu Tsui Beach
  • Silverstrand Beach
  • Trio Beach
  • Education
    Tertiary
    Primary/secondary
    MTR stations
    Media
    Islands
    History
    This list is incomplete.
    Private housing estates in Hong Kong
    Private housing estates in Sha Tin District

    22°17′42″N 114°16′16″E / 22.295°N 114.271°E / 22.295; 114.271

    Categories: