Misplaced Pages

Wittpenn Bridge: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 17:23, 30 November 2021 editNYCTA Railfan (talk | contribs)324 edits Cleared Route 7 from the info boxTag: Visual edit← Previous edit Revision as of 14:05, 3 December 2021 edit undoJim.henderson (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users, IP block exemptions, Pending changes reviewers, Rollbackers72,693 edits top: Old and new bridgesTag: Visual editNext edit →
Line 33: Line 33:
}} }}


The '''Wittpenn Bridge''' is a ] that carries ] over the ] connecting ] and ], ]. It is named after ], a former mayor of Jersey City. The bridge comprises four {{convert|10|ft|m|adj=mid|-wide}} lanes, extending {{convert|2169|ft}} and standing {{convert|35|ft}} above mean high water with a {{convert|209|ft|adj=on}} main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. The bridge has an ] (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.<ref name=Record>, '']'', April 11, 2005</ref> The old '''Wittpenn Bridge''' is a ] that carries ] over the ] connecting ] and ], ]. It is named after ], a former mayor of Jersey City. The bridge comprises four {{convert|10|ft|m|adj=mid|-wide}} lanes, extending {{convert|2169|ft}} and standing {{convert|35|ft}} above mean high water with a {{convert|209|ft|adj=on}} main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. The bridge has an ] (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.<ref name=Record>, '']'', April 11, 2005</ref>


When raised, the bridge provides {{convert|100|ft}} of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.<ref name=Record/> When raised, the bridge provides {{convert|100|ft}} of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.<ref name=Record/>

It was replaced in 2021 with a new Wittpenn Bridge.


==Replacement== ==Replacement==

Revision as of 14:05, 3 December 2021

Bridge in New Jersey, US
Wittpenn Bridge
Wittpenn Bridge, looking east in a 2004 photo
Coordinates40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge)
CarriesFuture East Coast Greenway
CrossesHackensack River
LocaleJersey City and Kearny, New Jersey
Official nameWittpenn Bridge
Other name(s)Route 7 Bridge
Maintained byNew Jersey Department of Transportation
ID number0909150
Characteristics
DesignLift bridge
Total length2,169 feet (661 m)
Width40 feet (12 m)
Longest span83 feet (25 m)
Clearance below35 feet (11 m) (lowered)
100 feet (30 m) (raised)
History
OpenedNovember 5, 1930
Statistics
Daily traffic00
Location

The old Wittpenn Bridge is a vertical-lift bridge that carries New Jersey Route 7 over the Hackensack River connecting Kearny and Jersey City, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge comprises four 10-foot-wide (3.0 m) lanes, extending 2,169 feet (661 m) and standing 35 feet (11 m) above mean high water with a 209-foot (64 m) main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. The bridge has an annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.

When raised, the bridge provides 100 feet (30 m) of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.

It was replaced in 2021 with a new Wittpenn Bridge.

Replacement

New bridge approach in Kearny, 2020

The New Jersey Department of Transportation (NJDOT) is replacing the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011, and the overall project is expected to take 11 years to complete. The new bridge is situated just north of the existing bridge.

The reconstruction of the bridge is being partially funded by the Port Authority of New York and New Jersey, and it will be fully operational in 2021. In November 2018, the Federal Aviation Agency (FAA) investigated a complaint raised by United Airlines that the fees they were paying for Newark Airport use were being diverted to roadway and bridge projects such as the Wittpenn Bridge which are not owned or operated by the Port Authority of New York/New Jersey.

Once completed, the bridge will carry the East Coast Greenway, a long-distance biking and walking trail, and the Meadowlands Connector, a New Jersey biking and walking trail that links Hudson and Essex counties.

In October 2020 the third and final section of the orthotropic bridge deck was hoisted into place. The bridge opened on October 1, 2021.

See also

References

  1. "Historic Bridge Survey (1991–1994)" (PDF). NJDOT. 2001. Retrieved 2013-03-26.
  2. ^ Picture this: Drawbridge Operator, The Record (Bergen County), April 11, 2005
  3. "5 years done, 6 to go for new $480M Wittpenn Bridge". 21 December 2016.
  4. Conti Group (2011). "Conti to Kick off Wittpenn Bridge Repairs" 2011-07-18.
  5. "Another new bridge quietly rises in shadow of the Pulaski Skyway". NJ.com. 14 May 2015.
  6. Higgs, Larry (January 29, 2019). "Feds question Port Authority's use of airline fees to fund bridge projects". NJ.com.
  7. "New bike, walking trail would link N.J.'s 2 largest cities". 27 March 2017. Retrieved 27 March 2017.
  8. "Section of new Wittpenn Bridge hoisted into place -- but it's not ready to open yet". 11 October 2020.
  9. Canessa Jr., Kevin (21 September 2021). "New Wittpenn Bridge is opening Oct. 1 and it's welcome news for Hudson drivers". NJ.com. The Jersey Journal. Retrieved 27 September 2021.
  10. NJ.com, Steve Strunsky | NJ Advance Media for (2021-10-02). "New Wittpenn Bridge opens after 10 years and half a billion dollars". nj. Retrieved 2021-10-03.

External links

Crossings of the Hackensack River
Upstream
Lower Hack Lift
New Jersey Transit
Wittpenn Bridge
Downstream
Harsimus Branch Lift Bridge
Categories: