Misplaced Pages

Wittpenn Bridge: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 12:14, 23 August 2022 editDeFazioNJ (talk | contribs)371 editsNo edit summaryTags: Mobile edit Mobile web edit← Previous edit Revision as of 01:06, 9 September 2022 edit undoNaraht (talk | contribs)Autopatrolled, Extended confirmed users, Page movers, IP block exemptions, New page reviewers, Pending changes reviewers, Rollbackers114,376 editsm Original structure: cleanup and begin deleting image parameters no longer used by infobox bridgesTag: AWBNext edit →
Line 37: Line 37:
==Original structure== ==Original structure==
] ]
The original bridge carried four {{convert|10|ft|m|adj=mid|-wide}} lanes, extended {{convert|2169|ft}} and stood {{convert|35|ft}} above mean high water with a {{convert|209|ft|adj=on}} main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. When raised, the bridge provided {{convert|100|ft}} of clearance for ships. Raising the lift span required 15 minutes.{{cn|date=April 2022}} Following the opening of the 2021 span, demolition work commenced on this span with work being substantially complete by March 2022.<ref>{{cite web |url=https://moveitmagazine.com/2022/03/30/engineered-rigging-overcomes-bridge-demolition-challenges/ |date=March 30, 2022 |title=Engineered Rigging overcomes bridge demolition challenges |website=Move It Magazine |accessdate=April 4, 2022}}</ref> The original bridge carried four {{convert|10|ft|m|adj=mid|-wide}} lanes, extended {{convert|2169|ft}} and stood {{convert|35|ft}} above mean high water with a {{convert|209|ft|adj=on}} main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. When raised, the bridge provided {{convert|100|ft}} of clearance for ships. Raising the lift span required 15 minutes.{{citation needed|date=April 2022}} Following the opening of the 2021 span, demolition work commenced on this span with work being substantially complete by March 2022.<ref>{{cite web |url=https://moveitmagazine.com/2022/03/30/engineered-rigging-overcomes-bridge-demolition-challenges/ |date=March 30, 2022 |title=Engineered Rigging overcomes bridge demolition challenges |website=Move It Magazine |accessdate=April 4, 2022}}</ref>


==Replacement== ==Replacement==

Revision as of 01:06, 9 September 2022

Bridge in New Jersey, US
Wittpenn Bridge
Current span of the bridge
Coordinates40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge)
Carries Route 7
Future East Coast Greenway
CrossesHackensack River
LocaleJersey City and Kearny, New Jersey
Official nameWittpenn Bridge
Other name(s)Route 7 Bridge
Maintained byNew Jersey Department of Transportation
ID number0909150
Characteristics
DesignLift bridge
Total length2,169 feet (661 m)
Width40 feet (12 m)
Longest span83 feet (25 m)
Clearance below35 feet (11 m) (lowered)
100 feet (30 m) (raised)
History
OpenedNovember 5, 1930
Statistics
Daily traffic00
Location

The Wittpenn Bridge is a vertical-lift bridge that carries New Jersey Route 7 over the Hackensack River connecting Kearny and Jersey City, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge has an annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks. In 2005, the bridge was raised to accommodate 80 boats passing underneath. The original span opened in 1930; a replacement opened in 2021.

Original structure

The original Wittpenn Bridge, looking east in a 2004 photo

The original bridge carried four 10-foot-wide (3.0 m) lanes, extended 2,169 feet (661 m) and stood 35 feet (11 m) above mean high water with a 209-foot (64 m) main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. When raised, the bridge provided 100 feet (30 m) of clearance for ships. Raising the lift span required 15 minutes. Following the opening of the 2021 span, demolition work commenced on this span with work being substantially complete by March 2022.

Replacement

New bridge approach in Kearny, 2020

The New Jersey Department of Transportation (NJDOT) replaced the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011. The new span opened in 2021, and all associated project work is expected to be completed in 2022. The new bridge is situated just north of the existing bridge.

The reconstruction of the bridge was partially funded by the Port Authority of New York and New Jersey. In November 2018, the Federal Aviation Agency (FAA) investigated a complaint raised by United Airlines that the fees they were paying for Newark Airport use were being diverted to roadway and bridge projects such as the Wittpenn Bridge which are not owned or operated by the Port Authority of New York/New Jersey.

In October 2020 the third and final section of the orthotropic bridge deck was hoisted into place. The bridge opened on October 1, 2021.

In addition to Route 7, the new span carries the East Coast Greenway, a long-distance biking and walking trail, and the Meadowlands Connector, a New Jersey biking and walking trail that links Hudson and Essex counties.

See also

References

  1. "Historic Bridge Survey (1991–1994)" (PDF). NJDOT. 2001. Retrieved 2013-03-26.
  2. ^ Picture this: Drawbridge Operator, The Record (Bergen County), April 11, 2005
  3. "Engineered Rigging overcomes bridge demolition challenges". Move It Magazine. March 30, 2022. Retrieved April 4, 2022.
  4. "5 years done, 6 to go for new $480M Wittpenn Bridge". 21 December 2016.
  5. Conti Group (2011). "Conti to Kick off Wittpenn Bridge Repairs" 2011-07-18.
  6. "Another new bridge quietly rises in shadow of the Pulaski Skyway". NJ.com. 14 May 2015.
  7. Higgs, Larry (January 29, 2019). "Feds question Port Authority's use of airline fees to fund bridge projects". NJ.com.
  8. "Section of new Wittpenn Bridge hoisted into place -- but it's not ready to open yet". 11 October 2020.
  9. Canessa Jr., Kevin (21 September 2021). "New Wittpenn Bridge is opening Oct. 1 and it's welcome news for Hudson drivers". NJ.com. The Jersey Journal. Retrieved 27 September 2021.
  10. NJ.com, Steve Strunsky | NJ Advance Media for (2021-10-02). "New Wittpenn Bridge opens after 10 years and half a billion dollars". nj. Retrieved 2021-10-03.
  11. "New bike, walking trail would link N.J.'s 2 largest cities". 27 March 2017. Retrieved 27 March 2017.

External links

Crossings of the Hackensack River
Upstream
Lower Hack Lift
New Jersey Transit
Wittpenn Bridge
Downstream
Harsimus Branch Lift Bridge
Categories: