Revision as of 06:45, 17 December 2024 editChongkian (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users373,754 edits →Technical specifications: add other related category per WP:CATDEF← Previous edit | Revision as of 06:49, 17 December 2024 edit undoChongkian (talk | contribs)Autopatrolled, Event coordinators, Extended confirmed users373,754 edits add architecture & inline citationNext edit → | ||
Line 70: | Line 70: | ||
| floor_area = | | floor_area = | ||
| elevator_count = | | elevator_count = | ||
| grounds_area = | | grounds_area = 1.8 hectares | ||
| architect = | | architect = | ||
| architecture_firm = | | architecture_firm = | ||
Line 103: | Line 103: | ||
==History== | ==History== | ||
The groundbreaking ceremony for the construction of the plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.<ref name="O., Onon, 4 January 2018">{{cite news|last=O.|first=Onon|date=4 January 2018|url=https://www.montsame.mn/en/read/132980|title=Construction of Wastewater Treatment Plant in Dalanzadgad begins|work=Mongolian National News Agency|access-date=17 December 2024}}</ref> | The groundbreaking ceremony for the construction of the plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.<ref name="O., Onon, 4 January 2018">{{cite news|last=O.|first=Onon|date=4 January 2018|url=https://www.montsame.mn/en/read/132980|title=Construction of Wastewater Treatment Plant in Dalanzadgad begins|work=Mongolian National News Agency|access-date=17 December 2024}}</ref> | ||
==Architecture== | |||
The plant stands at a total ground area of 1.8 hectares.<ref>{{cite news|last=D.|first=Mishigsuren|date=13 June 2018|url=https://montsame.mn/mn/read/92697|title=Даланзадгадад шинэ цэвэрлэх байгууламж барьж байна|work=Mongolian National News Agency|trans-title=A New Wastewater Treatment Plant is being Built in Dalanzadgad|language=mn|access-date=17 December 2024}}</ref> | |||
==Technical specifications== | ==Technical specifications== |
Revision as of 06:49, 17 December 2024
Wastewater treatment plant in Dalanzadgad, Ömnögovi, Mongolia
Dalanzadgad New Wastewater Treatment Plant | |
---|---|
Даланзадгад хотын шинэ цэвэрлэх байгууламж | |
General information | |
Type | wastewater treatment plant |
Town or city | Dalanzadgad, Ömnögovi |
Country | Mongolia |
Coordinates | 43°36′50.1″N 104°29′00.7″E / 43.613917°N 104.483528°E / 43.613917; 104.483528 |
Groundbreaking | 4 January 2018 |
Opened | June 2020 |
Cost | US$21.17 million |
Grounds | 1.8 hectares |
Design and construction | |
Main contractor | N A.B, S&A Trade, San and Baiguulamj |
The Darkhan New Wastewater Treatment Plant (Mongolian: Даланзадгад хотын шинэ цэвэрлэх байгууламж) is a wastewater treatment in Dalanzadgad, Ömnögovi Province, Mongolia.
History
The groundbreaking ceremony for the construction of the plant was held on 4 January 2018 at the Ministry of Construction and Urban Development. The construction was completed in 2019 by N A.B, S&A Trade, San and Baiguulamj companies. Test run of the plant was carried out in the first half of 2020. In June 2020 the plant went into full operation.
Architecture
The plant stands at a total ground area of 1.8 hectares.
Technical specifications
The plant has a water processing capacity of 3,000 m per day.
Finance
The plant was constructed with a cost of US$21.17 million. About 92% of the funding was provided by a loan from Asian Development Bank and the remaining 8% was provided by the Government of Mongolia.
See also
References
- ^ O., Onon (4 January 2018). "Construction of Wastewater Treatment Plant in Dalanzadgad begins". Mongolian National News Agency. Retrieved 17 December 2024.
- D., Mishigsuren (13 June 2018). "Даланзадгадад шинэ цэвэрлэх байгууламж барьж байна" [A New Wastewater Treatment Plant is being Built in Dalanzadgad]. Mongolian National News Agency (in Mongolian). Retrieved 17 December 2024.
- "Даланзадгад сумын шинэ цэвэрлэх байгууламж намар ашиглалтад орно" [New Wastewater Treatment Plant in Dalanzadgad Sum to be Commissioned in Autumn]. News.mn (in Mongolian). 12 May 2019. Retrieved 17 December 2024.
This article about a building or structure in Mongolia is a stub. You can help Misplaced Pages by expanding it. |