Misplaced Pages

Wittpenn Bridge: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 18:02, 18 October 2011 editTrain2104 (talk | contribs)Extended confirmed users, File movers, Pending changes reviewers, Rollbackers56,729 edits External links: cannot use non-free NJT logo here← Previous edit Revision as of 19:03, 30 November 2011 edit undoSCondell (talk | contribs)1 editmNo edit summaryNext edit →
Line 42: Line 42:
|caption = <!-- blank --> |caption = <!-- blank -->
}}}} }}}}
The '''Wittpenn Bridge''' is a ] that carries ] over the ] connecting ] and ], ]. It is named after ], a former mayor of Jersey City. The bridge comprises four {{convert|10|ft|adj=on}}-wide lanes, extending {{convert|2169|ft}} and standing {{convert|35|ft}} above mean high water with an {{convert|83|ft|adj=on}} main lift span. Bridge construction commenced 1927, and was opened to vehicular traffic November 5, 1930. The bridge has an ] (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.<ref name=Record>, '']'', April 11, 2005</ref> The '''Wittpenn Bridge''' is a ] that carries ] over the ] connecting ] and ], ]. It is named after ], a former mayor of Jersey City. The bridge comprises four {{convert|10|ft|adj=on}}-wide lanes, extending {{convert|2169|ft}} and standing {{convert|35|ft}} above mean high water with an {{convert|209|ft|adj=on}} main lift span. Bridge construction commenced 1927, and was opened to vehicular traffic November 5, 1930. The bridge has an ] (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.<ref name=Record>, '']'', April 11, 2005</ref>


When raised, the bridge provides {{convert|100|ft}} of clearance for ships. In 2005, the bridge was raised to accommodate 80 boats passing underneath, a process that takes 15 minutes to raise the lift span.<ref name=Record/> When raised, the bridge provides {{convert|100|ft}} of clearance for ships. In 2005, the bridge was raised to accommodate 80 boats passing underneath, a process that takes 15 minutes to raise the lift span.<ref name=Record/>

Revision as of 19:03, 30 November 2011

Bridge in Jersey City and Kearny, New Jersey
Wittpenn Bridge
Wittpenn Bridge in a 2004 photo
Coordinates40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge)
Carries4 Lanes of NJ Route 7
CrossesHackensack River
LocaleJersey City and Kearny, New Jersey
Official nameWittpenn Bridge
Other name(s)Route 7 Bridge
Maintained byNew Jersey Department of Transportation
Characteristics
DesignLift bridge
Total length2,169 feet (661 m)
Width40 feet (12 m)
Longest span83 feet (25 m)
Clearance below35 feet (11 m) (lowered)
100 feet (30 m) (raised)
History
OpenedNovember 5, 1930
Statistics
Daily traffic50,000
Lua error in Module:Location_map at line 391: A hemisphere can only be provided with DMS degrees for longitude.
Location

The Wittpenn Bridge is a vertical lift bridge that carries New Jersey Route 7 over the Hackensack River connecting Kearny and Jersey City, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge comprises four 10-foot (3.0 m)-wide lanes, extending 2,169 feet (661 m) and standing 35 feet (11 m) above mean high water with an 209-foot (64 m) main lift span. Bridge construction commenced 1927, and was opened to vehicular traffic November 5, 1930. The bridge has an Annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.

When raised, the bridge provides 100 feet (30 m) of clearance for ships. In 2005, the bridge was raised to accommodate 80 boats passing underneath, a process that takes 15 minutes to raise the lift span.

The New Jersey Department of Transportation (NJDOT) is replacing the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011 and the overall project is expected to take six years to complete. The new bridge will be situated just north of the existing bridge.

See also

See also

References

  1. ^ Picture this: Drawbridge Operator, The Record (Bergen County), April 11, 2005
  2. Conti Group (2011). "Conti to Kick off Wittpenn Bridge Repairs" 2011-07-18.

External links

Crossings of the Hackensack River
Upstream
Lower Hack Lift
New Jersey Transit
Wittpenn Bridge
Downstream
Harsimus Branch Lift Bridge
Categories: