Revision as of 20:10, 10 July 2012 editThe Anomebot2 (talk | contribs)Bots, Extended confirmed users1,042,920 edits Adding geodata: {{coord|50|50|40|N|4|23|30|E|source:nlwiki_type:landmark|display=title}}← Previous edit Revision as of 15:10, 10 October 2012 edit undoDavid Edgar (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers, Rollbackers17,124 edits add links, some minor fixes to wording, punctuation, etc.Next edit →
Line 2: Line 2:
The '''Schuman-Josaphat tunnel''' is a 1250m double track rail tunnel being constructed in Brussels.<ref>{{cite web |url=http://www.infrabel.be/sites/default/files/documents/B09-v1_brochure%20schuman-josaphat%20Fr%20200903.pdf|title=Le tunnel Schuman-Josaphat |language=French |accessdate=14 Feb 2012 |publisher=Infrabel}}</ref><ref>{{cite web |url=http://www.infrabel.be/en/residents/construction-sites/schuman-josaphat-tunnel|title=Schuman-Josaphat tunnel|accessdate=14 Feb 2012 |publisher=Infrabel}}</ref>. It will link ] (]-Namur) just after ] station and ] (Halle-Vilvoorde) at the Cinquantenaire/Jubelpark tunnel just before ]. The line will be numbered L161A. A key component of the ] project, it will pass beneath avenue Plasky/Plaskylaan, place de Jamblinne de Meux/Jamblinne de Meuxplein and the Cortenbergh/Kortenberg road tunnel <ref>{{cite web |url=http://tchorski.morkitu.org/9/josaphat-01.htm|title=Schuman-Josaphat tunnel|language=French|accessdate=9 Mar 2012 }}</ref>. The position of the tunnel in the Brussels rail network is shown in the simplified map on the right. Benefits of the project include: The '''Schuman-Josaphat tunnel''' is a 1250m double track rail tunnel being constructed in Brussels.<ref>{{cite web |url=http://www.infrabel.be/sites/default/files/documents/B09-v1_brochure%20schuman-josaphat%20Fr%20200903.pdf|title=Le tunnel Schuman-Josaphat |language=French |accessdate=14 Feb 2012 |publisher=Infrabel}}</ref><ref>{{cite web |url=http://www.infrabel.be/en/residents/construction-sites/schuman-josaphat-tunnel|title=Schuman-Josaphat tunnel|accessdate=14 Feb 2012 |publisher=Infrabel}}</ref>. It will link ] (]-Namur) just after ] station and ] (Halle-Vilvoorde) at the Cinquantenaire/Jubelpark tunnel just before ]. The line will be numbered L161A. A key component of the ] project, it will pass beneath avenue Plasky/Plaskylaan, place de Jamblinne de Meux/Jamblinne de Meuxplein and the Cortenbergh/Kortenberg road tunnel <ref>{{cite web |url=http://tchorski.morkitu.org/9/josaphat-01.htm|title=Schuman-Josaphat tunnel|language=French|accessdate=9 Mar 2012 }}</ref>. The position of the tunnel in the Brussels rail network is shown in the simplified map on the right. Benefits of the project include:
* reducing the journey time from the European quarter (Schuman and Luxembourg stations) to the airport from half an hour to less than 15 minutes by opening a direct route and avoid having to change at Brussels North station<ref>{{cite web |url=http://www.infrabel.be/en/residents/projects/regional-express-network|title=The Regional Express Network|language=English|accessdate=19 Mar 2012 }}</ref> * reducing the journey time from the European quarter (Schuman and Luxembourg stations) to the airport from half an hour to less than 15 minutes by opening a direct route and avoid having to change at Brussels North station<ref>{{cite web |url=http://www.infrabel.be/en/residents/projects/regional-express-network|title=The Regional Express Network|language=English|accessdate=19 Mar 2012 }}</ref>
* opening a parallel route through Brussels to take pressure off the saturated Brussels North - Brussels South line * opening a parallel route through Brussels to take pressure off the saturated ]


{{clr}} {{clr}}
==Project Details== ==Project details==
] ]
] ]
] ]
The project began in June 2008 and is planned to take 1645 days to complete. Construction will take place in two phases. First, the shell was dug out finishing in late 2011, and second equipping the tunnel with track etc. from late 2010 to late 2013. The tunnel should become operational in 2013 and the RER system in 2016. The cost of the tunnel is estimated at 210 million euros, funded through Beliris, a joint venture between the Belgian Federation and the ] Region. The project is also managed by ] The project began in June 2008 and is planned to take 1645 days to complete. Construction is taking place in two phases. First, the shell was dug out, which finished in late 2011. Secondly, equipping the tunnel with track etc. is scheduled to last from late 2010 to late 2013. The tunnel should become operational in 2013 and the RER system in 2016. The cost of the tunnel is estimated at 210 million euros, funded through Beliris, a joint venture between the Belgian Federation and the ] Region. The project is also managed by ].


Unusual construction techniques were used to limit disturbance to local residents and protect the appearance of Brussels. It was decided to carry out the work without opening the tunnel from the surface so the digging is being done without a ], but rather by hand or using small excavators. The Cortenbergh road tunnel was built with extra deep foundations to accommodate a future rail tunnel beneath it. Elsewhere the tunnel passes close beneath the cellars of buildings, and in any case delivering a TBM in central Brussels would have created great disruption. Similar techniques were used during the construction of the underground junction passing under the ]. Unusual construction techniques were used to limit disturbance to local residents and protect the appearance of Brussels. It was decided to carry out the work without opening the tunnel from the surface so the digging is being done without a ], but rather by hand or using small excavators. The Cortenbergh road tunnel was built with extra deep foundations to accommodate a future rail tunnel beneath it. Elsewhere the tunnel passes close beneath the cellars of buildings, and in any case delivering a TBM in central Brussels would have created great disruption. Similar techniques were used during the construction of the underground junction passing under the ].


==References== ==References==
<references/> <references/>


==See Also== ==See also==



Revision as of 15:10, 10 October 2012

How the tunnel fits into the Brussels rail network

The Schuman-Josaphat tunnel is a 1250m double track rail tunnel being constructed in Brussels.. It will link line 161 (Brussels-Namur) just after Meiser station and line 26 (Halle-Vilvoorde) at the Cinquantenaire/Jubelpark tunnel just before Schuman station. The line will be numbered L161A. A key component of the Brussels RER project, it will pass beneath avenue Plasky/Plaskylaan, place de Jamblinne de Meux/Jamblinne de Meuxplein and the Cortenbergh/Kortenberg road tunnel . The position of the tunnel in the Brussels rail network is shown in the simplified map on the right. Benefits of the project include:

  • reducing the journey time from the European quarter (Schuman and Luxembourg stations) to the airport from half an hour to less than 15 minutes by opening a direct route and avoid having to change at Brussels North station
  • opening a parallel route through Brussels to take pressure off the saturated Brussels North - Brussels South line

Project details

Rail tunnel structure (in blue) as it fits in/under the road tunnel foundations (in orange)
Schuman station looking North towards the Schuman-Josaphat tunnel
Meiser station looking South towards the Schuman-Josaphat tunnel

The project began in June 2008 and is planned to take 1645 days to complete. Construction is taking place in two phases. First, the shell was dug out, which finished in late 2011. Secondly, equipping the tunnel with track etc. is scheduled to last from late 2010 to late 2013. The tunnel should become operational in 2013 and the RER system in 2016. The cost of the tunnel is estimated at 210 million euros, funded through Beliris, a joint venture between the Belgian Federation and the Brussels Region. The project is also managed by Infrabel.

Unusual construction techniques were used to limit disturbance to local residents and protect the appearance of Brussels. It was decided to carry out the work without opening the tunnel from the surface so the digging is being done without a tunnel boring machine, but rather by hand or using small excavators. The Cortenbergh road tunnel was built with extra deep foundations to accommodate a future rail tunnel beneath it. Elsewhere the tunnel passes close beneath the cellars of buildings, and in any case delivering a TBM in central Brussels would have created great disruption. Similar techniques were used during the construction of the underground junction passing under the Antwerp Central railway station.

References

  1. "Le tunnel Schuman-Josaphat" (PDF) (in French). Infrabel. Retrieved 14 Feb 2012.
  2. "Schuman-Josaphat tunnel". Infrabel. Retrieved 14 Feb 2012.
  3. "Schuman-Josaphat tunnel" (in French). Retrieved 9 Mar 2012.
  4. "The Regional Express Network". Retrieved 19 Mar 2012.

See also

rail-be.net: amateur photos of Belgian railways, L161 section including progress photos of the tunnel

50°50′40″N 4°23′30″E / 50.84444°N 4.39167°E / 50.84444; 4.39167