Revision as of 21:00, 29 January 2014 editOldboltonian (talk | contribs)Extended confirmed users3,077 edits →Project details← Previous edit | Revision as of 07:27, 30 January 2014 edit undoBG19bot (talk | contribs)1,005,055 editsm →Project details: WP:CHECKWIKI error fix for #61. Punctuation goes before References. Do general fixes if a problem exists. - using AWB (9890)Next edit → | ||
Line 10: | Line 10: | ||
] | ] | ||
] | ] | ||
The project began in June 2008 and is planned to take 1645 days to complete. Construction is taking place in two phases. First, the shell was dug out, which finished in late 2011. Secondly, equipping the tunnel with track etc. was scheduled to last from late 2010 to late 2013. In fact track laying began in 2014<ref>{{cite web | The project began in June 2008 and is planned to take 1645 days to complete. Construction is taking place in two phases. First, the shell was dug out, which finished in late 2011. Secondly, equipping the tunnel with track etc. was scheduled to last from late 2010 to late 2013. In fact track laying began in 2014.<ref>{{cite web | ||
|url=http://www.lecho.be/actualite/entreprises_transport/Le_tunnel_Schuman_Josaphat_sur_les_rails.9456711-3016.art?ckc=1 | |url=http://www.lecho.be/actualite/entreprises_transport/Le_tunnel_Schuman_Josaphat_sur_les_rails.9456711-3016.art?ckc=1 | ||
|title=Le tunnel Schuman-Josaphat sur les Rails | |title=Le tunnel Schuman-Josaphat sur les Rails | ||
|language=French | |language=French | ||
|accessdate=28 Jan 2014 | |accessdate=28 Jan 2014 | ||
|publisher=L'Echo}}</ref> |
|publisher=L'Echo}}</ref> | ||
The tunnel should become operational in 2015 and the RER system in 2016. The cost of the tunnel is estimated at 210 million euros, funded through Beliris, a joint venture between the Belgian Federation and the ] Region. The project is also managed by ]. | The tunnel should become operational in 2015 and the RER system in 2016. The cost of the tunnel is estimated at 210 million euros, funded through Beliris, a joint venture between the Belgian Federation and the ] Region. The project is also managed by ]. |
Revision as of 07:27, 30 January 2014
The Schuman-Josaphat tunnel is a 1250m double track rail tunnel being constructed in Brussels. It will link line 161 (Brussels-Namur) just after Meiser station and line 26 (Halle-Vilvoorde) at the Cinquantenaire/Jubelpark tunnel just before Schuman station. The line will be numbered L161A. A key component of the Brussels RER project, it will pass beneath avenue Plasky/Plaskylaan, place de Jamblinne de Meux/Jamblinne de Meuxplein and the Cortenbergh/Kortenberg road tunnel. The position of the tunnel in the Brussels rail network is shown in the simplified map on the right. Benefits of the project include:
- reducing the journey time from the European quarter (Schuman and Luxembourg stations) to the airport from half an hour to less than 15 minutes by opening a direct route and avoid having to change at Brussels North station
- opening a parallel route through Brussels to take pressure off the saturated Brussels North - Brussels South line
Project details
The project began in June 2008 and is planned to take 1645 days to complete. Construction is taking place in two phases. First, the shell was dug out, which finished in late 2011. Secondly, equipping the tunnel with track etc. was scheduled to last from late 2010 to late 2013. In fact track laying began in 2014.
The tunnel should become operational in 2015 and the RER system in 2016. The cost of the tunnel is estimated at 210 million euros, funded through Beliris, a joint venture between the Belgian Federation and the Brussels Region. The project is also managed by Infrabel.
Unusual construction techniques were used to limit disturbance to local residents and protect the appearance of Brussels. It was decided to carry out the work without opening the tunnel from the surface so the digging is being done without a tunnel boring machine, but rather by hand or using small excavators. The Cortenbergh road tunnel was built with extra deep foundations to accommodate a future rail tunnel beneath it. Elsewhere the tunnel passes close beneath the cellars of buildings, and in any case delivering a TBM in central Brussels would have created great disruption. Similar techniques were used during the construction of the underground junction passing under the Antwerp Central railway station.
References
- "Le tunnel Schuman-Josaphat" (PDF) (in French). Infrabel. Retrieved 14 Feb 2012.
- "Schuman-Josaphat tunnel". Infrabel. Retrieved 14 Feb 2012.
- "Schuman-Josaphat tunnel" (in French). Retrieved 9 Mar 2012.
- "The Regional Express Network". Retrieved 19 Mar 2012.
- "Le tunnel Schuman-Josaphat sur les Rails" (in French). L'Echo. Retrieved 28 Jan 2014.
See also
50°50′40″N 4°23′30″E / 50.84444°N 4.39167°E / 50.84444; 4.39167
Categories: