Revision as of 01:07, 23 February 2015 editYobot (talk | contribs)Bots4,733,870 editsm Infobox standardisation per WP:BOTREQ + other fixes using AWB (10835)← Previous edit | Revision as of 12:44, 14 March 2015 edit undoYobot (talk | contribs)Bots4,733,870 editsm update infobox, replaced: max_planned_cap → ps_electrical_capacity using AWB (10861)Next edit → | ||
Line 14: | Line 14: | ||
|ps_combined_cycle = | |ps_combined_cycle = | ||
|ps_units_operational = 83 (maximum) | |ps_units_operational = 83 (maximum) | ||
| |
|ps_electrical_capacity = 240 MW | ||
|commissioned = | |commissioned = | ||
|decommissioned = | |decommissioned = |
Revision as of 12:44, 14 March 2015
Kaiwera Downs Wind Farm | |
---|---|
Country | New Zealand |
Location | Gore |
Coordinates | 46°14′29″S 169°03′22″E / 46.2414°S 169.056°E / -46.2414; 169.056 |
Owner | TrustPower |
Power generation | |
Units operational | 83 (maximum) |
Nameplate capacity | 240 MW |
[edit on Wikidata] |
The Kaiwera Downs Wind Farm is a proposed wind farm to be located in the Southland region of New Zealand. It is expected to have a maximum capacity of 240MW and use up 83 turbines. It will be owned and operated by TrustPower.
The project received resource consent in June 2008.
Location
The wind farm will be about 15 kilometres south-east of Gore, within an area of 2,568 hectares (25.68 km).
See also
References
- Sonia Gerken (2008-04-04). "Wind farm carbon savings 'could be worth 25m'". The Southland Times. Retrieved 2008-09-24.
- Glenn Conway (2008-07-05). "Appeals lodged against wind farm". Otago Daily Times. Retrieved 2008-09-24.
- TrustPower Kaiwera Downs Wind Farm
External links
- TrustPower - Kaiwera Downs Wind Farm
This article about a wind farm is a stub. You can help Misplaced Pages by expanding it. |
This Southland Region geography article is a stub. You can help Misplaced Pages by expanding it. |
This article about a New Zealand power station is a stub. You can help Misplaced Pages by expanding it. |