Revision as of 20:24, 10 December 2019 editDjflem (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers104,657 edits →Replacement: https://www.nj.com/traffic/2019/12/you-were-supposed-to-be-driving-on-this-new-bridge-by-now-whats-delaying-its-opening.html← Previous edit | Revision as of 20:25, 10 December 2019 edit undoDjflem (talk | contribs)Autopatrolled, Extended confirmed users, Pending changes reviewers104,657 edits capNext edit → | ||
Line 29: | Line 29: | ||
|long = -74.081336 | |long = -74.081336 | ||
|width = 250 | |width = 250 | ||
|caption = Location |
|caption = Location in Port of New York and New Jersey | ||
}} | }} | ||
}} | }} |
Revision as of 20:25, 10 December 2019
This article needs to be updated. Please help update this article to reflect recent events or newly available information. (April 2016) |
Wittpenn Bridge | |
---|---|
Wittpenn Bridge, looking east in a 2004 photo | |
Coordinates | 40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge) |
Carries | 4 lanes of Route 7 |
Crosses | Hackensack River |
Locale | Jersey City and Kearny, New Jersey |
Official name | Wittpenn Bridge |
Other name(s) | Route 7 Bridge |
Maintained by | New Jersey Department of Transportation |
ID number | 0909150 |
Characteristics | |
Design | Lift bridge |
Total length | 2,169 feet (661 m) |
Width | 40 feet (12 m) |
Longest span | 83 feet (25 m) |
Clearance below | 35 feet (11 m) (lowered) 100 feet (30 m) (raised) |
History | |
Opened | November 5, 1930 |
Statistics | |
Daily traffic | 50,000 |
Location | |
The Wittpenn Bridge is a vertical-lift bridge that carries New Jersey Route 7 over the Hackensack River connecting Kearny and Jersey City, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge comprises four 10-foot-wide (3.0 m) lanes, extending 2,169 feet (661 m) and standing 35 feet (11 m) above mean high water with a 209-foot (64 m) main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. The bridge has an annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.
When raised, the bridge provides 100 feet (30 m) of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.
Replacement
The New Jersey Department of Transportation (NJDOT) is replacing the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011, and the overall project is expected to take 11 years to complete. The new bridge will be situated just north of the existing bridge.
The reconstruction of the bridge is being partially funded by the Port Authority of New York and New Jersey, and it will be fully operational in 2021. In November 2018, the Federal Aviation Agency (FAA) investigated a complaint raised by United Airlines that the fees they were paying for Newark Airport use were being diverted to roadway and bridge projects such as the Wittpenn Bridge which are not owned or operated by the Port Authority of New York/New Jersey.
Once completed, the bridge will carry the East Coast Greenway, a long-distance biking and walking trail, and the Meadowlands Connector, a New Jersey biking and walking trail that links Hudson and Essex counties.
The bridge is expected to open in winter 2020-2021.
See also
References
- "Historic Bridge Survey (1991–1994)" (PDF). NJDOT. 2001. Retrieved 2013-03-26.
- ^ Picture this: Drawbridge Operator, The Record (Bergen County), April 11, 2005
- http://www.nj.com/hudson/index.ssf/2016/12/5_year_done_7_years_to_go_for_500m_new_wittpenn_br.html
- Conti Group (2011). "Conti to Kick off Wittpenn Bridge Repairs" 2011-07-18.
- "Another new bridge quietly rises in shadow of the Pulaski Skyway". NJ.com.
- {{cite web| url=https://www.nj.com/news/index.ssf/2018/11/feds_rap_port_authority_for_funding_pulaski_skyway.html
- "New bike, walking trail would link N.J.'s 2 largest cities". Retrieved 27 March 2017.
- https://www.nj.com/traffic/2019/12/you-were-supposed-to-be-driving-on-this-new-bridge-by-now-whats-delaying-its-opening.html
External links
- Media related to Wittpenn Bridge at Wikimedia Commons
- Wittpenn Bridge – Historic Overview (nycroads.com)
- Route 7 Wittpenn Bridge: Kearny and Jersey City, Hudson County – Preliminary Design Development (NJDOT)
- Wittpenn Bridge at Structurae
- Wittpenn Bridge – Proposed Alignment (NJDOT)
Crossings of the Hackensack River | ||||
---|---|---|---|---|
|