This is an old revision of this page, as edited by Evercat (talk | contribs) at 03:10, 6 March 2004 (disambig). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 03:10, 6 March 2004 by Evercat (talk | contribs) (disambig)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)Mission Insignia | |
---|---|
File:Sts-112-patch.jpg | |
Mission Statistics | |
Mission: | STS-51 |
Shuttle: | Atlantis |
Launch Pad: | 39-B |
Launch: | October 7, 2002 3:46 p.m. EDT |
Landing: | 11:44 a.m. EDT, October 18, 2002. KSC Runway 33 |
Duration: | 10 days, 19 hours, 58 minutes, 44 seconds. |
Orbit Altitude: | 122nm |
Orbit Inclination: | 51.6 degrees |
Miles Traveled: | 4.5 Million |
Crew photo | |
File:Sts-112-crew.gif |
Crew
- Jeffrey S. Ashby (3), Commander
- Pamela A. Melroy (2), Pilot
- David A. Wolf (3), Mission Specialist
- Piers J. Sellers (1), Mission Specialist
- Sandra H. Magnus (1), Mission Specialist
- Fyodor N. Yurchikhin (1) (RSC), Mission Specialist
Mission Highlights
International Space Station Assembly Mission 9A. This mission delivered the Integrated Truss Assembly S1 (Starboard Side Thermal Radiator Truss) and the Crew Equipment Translation Aid (CETA) Cart to the Space Station. The S1 Truss is 45-foot-long, 15-foot wide and 10-foot tall. It weighs approximately 31,000 pounds. The S1 truss was attached to the S0 truss (Launched April 8, 2002 onboard STS-110) and uses 637 pounds of anhydrous ammonia in three heat rejection radiators. The CETA cart was attached to the Mobile Transporter (also launched on STS-110) to be used by assembly crews on later missions. STS-112 also carried several science experiments to the station including the Plant Generic Bioprocessing Apparatus (PGBA), Commercial Generic Bioprocessing Apparatus (CGBA), the Protein Crystal Growth Single-locker Thermal Enclosure System housing the Protein Crystillization Apparatus for Microgravity (PCG-STES-PCAM) and samples for the Zeolite Crystal Growth Furnace (ZCG) experiment.
Related articles
- Space science
- Space shuttle
- List of space shuttle missions
- List of human spaceflights chronologically
External Links
Previous Mission: STS-111 |
Space Shuttle program | Next Mission: STS-113 |