Wittpenn Bridge, looking east in a 2004 photo | |
Coordinates | 40°44′26″N 74°04′53″W / 40.740625°N 74.081336°W / 40.740625; -74.081336 (Wittpenn Bridge) |
Carries | 4 lanes of Route 7 |
Crosses | Hackensack River |
Locale | Jersey City and Kearny, New Jersey |
Official name | Wittpenn Bridge |
Other name(s) | Route 7 Bridge |
Maintained by | New Jersey Department of Transportation |
ID number | 0909150 |
Characteristics | |
Design | Lift bridge |
Total length | 2,169 feet (661 m) |
Width | 40 feet (12 m) |
Longest span | 83 feet (25 m) |
Clearance below | 35 feet (11 m) (lowered) 100 feet (30 m) (raised) |
History | |
Opened | November 5, 1930 |
Statistics | |
Daily traffic | 50,000 |
Location | |
The Wittpenn Bridge is a vertical-lift bridge that carries New Jersey Route 7 over the Hackensack River connecting Kearny and Jersey City, New Jersey. It is named after H. Otto Wittpenn, a former mayor of Jersey City. The bridge comprises four 10-foot-wide (3.0 m) lanes, extending 2,169 feet (661 m) and standing 35 feet (11 m) above mean high water with a 209-foot (64 m) main lift span. Bridge construction commenced in 1927, and it was opened to vehicular traffic on November 5, 1930. The bridge has an annual average daily traffic (AADT) of nearly 50,000 vehicles, including about 2,000 trucks.
When raised, the bridge provides 100 feet (30 m) of clearance for ships. Raising the lift span takes 15 minutes. In 2005, the bridge was raised to accommodate 80 boats passing underneath.
Replacement
The New Jersey Department of Transportation (NJDOT) is replacing the Wittpenn Bridge and all its approach ramps (including connections to U.S. Route 1/9), a project estimated to cost $600 million, funded by federal dollars. The first phase of construction began in July 2011, and the overall project is expected to take 11 years to complete. The new bridge is situated just north of the existing bridge.
The reconstruction of the bridge is being partially funded by the Port Authority of New York and New Jersey, and it will be fully operational in 2021. In November 2018, the Federal Aviation Agency (FAA) investigated a complaint raised by United Airlines that the fees they were paying for Newark Airport use were being diverted to roadway and bridge projects such as the Wittpenn Bridge which are not owned or operated by the Port Authority of New York/New Jersey.
Once completed, the bridge will carry the East Coast Greenway, a long-distance biking and walking trail, and the Meadowlands Connector, a New Jersey biking and walking trail that links Hudson and Essex counties.
In October 2020 the third and final section of the orthotropic bridge deck was hoisted into place. The bridge opened on October 1, 2021.
See also
References
- "Historic Bridge Survey (1991–1994)" (PDF). NJDOT. 2001. Retrieved 2013-03-26.
- ^ Picture this: Drawbridge Operator, The Record (Bergen County), April 11, 2005
- "5 years done, 6 to go for new $480M Wittpenn Bridge". 21 December 2016.
- Conti Group (2011). "Conti to Kick off Wittpenn Bridge Repairs" 2011-07-18.
- "Another new bridge quietly rises in shadow of the Pulaski Skyway". NJ.com. 14 May 2015.
- Higgs, Larry (January 29, 2019). "Feds question Port Authority's use of airline fees to fund bridge projects". NJ.com.
- "New bike, walking trail would link N.J.'s 2 largest cities". 27 March 2017. Retrieved 27 March 2017.
- "Section of new Wittpenn Bridge hoisted into place -- but it's not ready to open yet". 11 October 2020.
- Canessa Jr., Kevin (21 September 2021). "New Wittpenn Bridge is opening Oct. 1 and it's welcome news for Hudson drivers". NJ.com. The Jersey Journal. Retrieved 27 September 2021.
- NJ.com, Steve Strunsky | NJ Advance Media for (2021-10-02). "New Wittpenn Bridge opens after 10 years and half a billion dollars". nj. Retrieved 2021-10-03.
External links
- Media related to Wittpenn Bridge at Wikimedia Commons
- Wittpenn Bridge at Bridges & Tunnels
- Wittpenn Bridge Replacement Project at New Jersey Department of Transportation
- Wittpenn Bridge at NYCroads.com
- Wittpenn Bridge at Structurae
Crossings of the Hackensack River | ||||
---|---|---|---|---|
|