This is an old revision of this page, as edited by Mulsannescorner (talk | contribs) at 12:51, 3 June 2023 (Swedish sources state the class' original length being 49.5 m, and with the AIP conversion of HSwMS Nacken in '88 adding 8 m, for 57.5 m total post-conversion length). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
Revision as of 12:51, 3 June 2023 by Mulsannescorner (talk | contribs) (Swedish sources state the class' original length being 49.5 m, and with the AIP conversion of HSwMS Nacken in '88 adding 8 m, for 57.5 m total post-conversion length)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff) For other ships with the same name, see HSwMS Näcken.HSwMS Näcken | |
History | |
---|---|
Sweden | |
Name | HSwMS Näcken |
Ordered | 1972 |
Awarded | 22 March 1973 |
Builder | Kockums, Malmö |
Laid down | November 1972 |
Launched | 17 April 1978 |
Commissioned | 25 April 1980 |
Decommissioned | 17 August 2001 |
Recommissioned | 2005 |
Fate | Scrapped 2016 |
Denmark | |
Name | HDMS Kronborg |
Acquired | 2001 |
Commissioned | 17 August 2001 |
Decommissioned | 27 October 2004 |
Identification | S325 |
Fate | Returned to Sweden 2005 |
General characteristics | |
Class and type | Näcken-class submarine |
Displacement |
|
Length | 57.5 m (188 ft 8 in) |
Beam | 5.7 m (18 ft 8 in) |
Draught | 5.5 m (18 ft 1 in) |
Depth | 300 m (980 ft) |
Propulsion |
|
Speed |
|
Test depth | 150 m (490 ft) |
Complement | 19 (5 officers) |
Sensors and processing systems | FAS |
Armament |
|
HSwMS Näcken is the lead ship of her class of submarine for the Swedish Navy. She was launched at the Kockums shipyard in Malmö, Sweden, on 17 April 1978, and completed and commissioned into the Swedish Navy in April 1980. From 2001 to 2005, the submarine was leased to the Royal Danish Navy and operated as HDMS Kronborg (S325). She was restored to her original name of Näcken upon her return to Swedish control. She was scrapped in Karlskrona during 2015–2016.
History
Refit
In November 1987, Näcken began a major refit at Kockums. This involved installing two closed circuit Tilsa Stirling diesel engines. This new diesel, the Stirling V4-275R, provides air-independent propulsion which allows the submarine to operate continuously underwater. However, in order to incorporate the new engine, the ship was lengthened by 8 metres (26 ft). The refit took until 6 September 1988. The endurance of the vessel, following refit, increased to 14 days. Näcken became the test bed for the technology which was used in the later Gotland class.
The ship had further modifications between 1993 and 1996. This comprised improved weapon control systems, automated torpedo tube loading and new sonar.
Transfer to Denmark
Näcken was transferred to Denmark in 2001 as part of a deal for the design and construction of the Viking-class project. The boat was leased by Denmark with an option to buy in 2005. Before the transfer, Denmark had the communications systems aboard upgraded. The submarine was recommissioned as Kronborg on 17 August 2001 at Aalborg. Denmark had acquired Kronborg partly to keep a submarine service and partly to train crews on air-independent propulsion in preparation for the Viking class. However, in June 2004, the Danish parliament voted to end the submarine service. On 27 October 2004, Kronborg was decommissioned at Karlskrona and returned to Sweden.
Notes
- ^ Saunders, p.169
- ^ Gardiner & Chumbly, p.447
- ^ "A14 Nacken". GlobalSecurity.org. 5 August 2011. Retrieved 5 April 2015.
References
- Gardiner, Robert; Chumbley, Stephen; Budzbon, Przemysław, eds. (1995). Conway's All the World's Fighting Ships 1947-1995. Annapolis, Maryland: Naval Institute Press. ISBN 1-55750-132-7.
- Saunders, Stephen, ed. (July 2004). Jane's Fighting Ships 2004-2005. Jane's Information Group. ISBN 0710626231.
- Miramar ship index (subscription required)
Näcken-class submarines | |
---|---|
|
This submarine-related article is a stub. You can help Misplaced Pages by expanding it. |